• Title/Summary/Keyword: 설비설계프로세스

Search Result 59, Processing Time 0.025 seconds

Analysis of Operational Issues for ICT-based On-Board Train Control System (ICT 기반 차상제어시스템 개발에 따른 운영 이슈 분석)

  • Kim, Young-Hoon;Choi, Won-Suk
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.6
    • /
    • pp.575-583
    • /
    • 2011
  • In order to minimize the maintenance cost at local lines, Information & Communication Technology based onboard train control system is being developed. Unlike the central traffic control based fixed block system, this system use a moving block method and railway driver direct control switch and railway crossing. The purpose of this paper is to analyze the concerned main operational issues are as follows: the preparation of train operation, drivability, the role of driver and controller, block system and cost. We defined the role of driver and driver's input data for train service, and we designed the business process of driver using UML tool. We considered the aspect of drivability, DMI is needed to support the braking moment for the driver and driver training simulator. We designed the driver business process for control of switch and railway crossing. We analyzed the fixed block system and moving block system to confirm the difference with the existing operational method. The cost analysis structure is also needed for the operation cost comparison.

A Study on the Integrated Business Function Design Standardization of the Meat Processed Food Industry ERP System (육가공식품산업 ERP시스템의 통합적인 업무 기능 설계 표준화 연구)

  • Yoon, Kyung-Bea;Kim, Young-Joon;Lee, Jae-Suk;Kim, Dong-Hyun
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.5
    • /
    • pp.205-210
    • /
    • 2019
  • In this study, in order to promote informatization of Meat Processed Food Industry, we standardize three processes of sales management, purchaser logistics and production management, develop standard modules, and develop integrated business functional design in ERP system development. This study reduces the cost of introducing the production equipment information standardization module in the food industry and the specialized IT companies that are slow in informatization, and maximizes the effectiveness and provides reliability by being a database where research standardization can be compared and analyzed. By applying the results of this study, it is possible to establish efficient processes of sales, buyer logistics, production, improvement of quality, and reduction of production cost from the receipt of food raw materials / subsidiary materials to finished products.

A Study on the Evaluation Management of Public Housing Architectural Competition using BIM (공공 공동주택의 BIM적용 설계 경기 평가관리에 한 연구 - BIM적용 가능 평가항목 선정을 중심으로 -)

  • Min, Byoung-Jik;Lim, Jae-Bok;Kim, Ju-Hyung;Seo, Jong-Won;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.2 no.2
    • /
    • pp.1-9
    • /
    • 2012
  • In Korea, recently, efforts have been made to introduce BIM(Building Information Modeling) to housing complex projects. However, there have been several problems including excessive competition for building design and outcome-oriented evaluation due to a lack of clear evaluation criteria and poorly organized management process. Under this circumstance, the study surveyed opinions of project managers and conducted a pilot test to improve evaluation criteria of BIM-based design for housing complexes. The objective is to assess the level of BIM technology and its applicability, and to propose a list of reasonable evaluation criteria for better project management. First, the study examined the current condition of evaluation on the BIM-based housing complexes, and identified 15 preliminary items that might be suitable for application of BIM. Second, the study conducted a pilot test for the 15 items to determine their suitability for the level of BIM technology, clarity of the calculation process, and the extent of fulfilling information quality, and short-listed eight items for application of BIM. In particular, in the design concept stage, mostly 3D visual images and area-related items are suitable for BIM-based evaluation. Accordingly, formerly used items such as project cost, energy and environmental analysis, building structure, and facilities were deemed more relevant to the subsequent stages of basic design and its implementation.

Identifying Construction Engineering Tasks at the Design Phase for Enhancing Constructability in High-rise Building Construction - Focused on Temporary Work - (고층 건축공사의 시공성 향상을 위한 설계단계의 시공엔지니어링 업무 도출 - 가설공사를 중심으로 -)

  • Lee, Jin-Woong;Cho, Kyu-Man;Kim, Tae-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.453-463
    • /
    • 2017
  • Due to the increase in the size of buildings and scale, the importance of construction engineering that reflects the constructability from the design stage of the project is increasing. Especially, engineering efforts related to facilities, equipment and construction methods for temporary work at the design stage can significantly contribute to improvement of constructability and project performance. The purpose of this study is to derive construction engineering tasks on temporary work at the design phase of the high-rise building projects. 27 preliminary tasks were firstly investigated through literature review and experts' group interview, and the necessity and importance analysis of each tasks were then performed based on questionnaire survey. Most of the tasks related to plans on structural framework and lifting equipment were analyzed as relatively more important ones. Lastly, 21 engineering tasks, which are classified into 5 factors, were proposed through factor analysis. The factors were determined as 1) structural framework, measurement and circulation, 2) lifting equipment and pumping, 3) space zoning, 4) water supply, 5) temporary facility, electric power supply and lighting. The results of this study can be used as basic data for establishing efficient work process of construction engineering on temporary work at the design phase.

A Study on Implementation of FEMS for Chemical Industry Complex (화학 산업단지 FEMS 구축 연구)

  • Soo-Min Yoo;Soo-Woong Back;Jung-Min Lim;Chae-Joo Moon
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.18 no.2
    • /
    • pp.277-284
    • /
    • 2023
  • It is not easy to implement an energy management system in an industrial complex where small businesses are scattered, so the method of collecting and adjusting energy-related data is mainly used. FEMS is a system that responds to the demand for a paradigm shift from a passive energy management method to an active energy management method using IoT and ICT. In this study, a factory energy management system(FEMS) is designed for small and medium-sized enterprises located in chemical industrial complexes. Efficiency was confirmed by reviewing energy saving measures and efficiencies through FEMS for the electric energy of facilities built in each company. The cost effectiveness of FEMS is created when it is utilized by responsible and empowered personnel within the business processes of the host company. Therefore, it is necessary to utilize EMS that can be applied to the planning, support, operation and evaluation, and continuous improvement of the energy management system to achieve corporate organization and energy management goals.

A Study on the Application Service of 3D BIM-based Disaster Integrated Information System Management for Effective Disaster Response (효과적인 재난 대응을 위한 3차원 BIM 기반 재난 통합정보 시스템 활용 서비스 제시)

  • Kim, Ji-Eun;Hong, Chang-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.143-150
    • /
    • 2018
  • Periodic and systemic disaster management has become more important than ever owing to the recent continuous occurrence of disasters, such as fires, earthquakes, and flooding. This management goes beyond simple disaster preparedness, which was introduced minimally under the existing legal system. For effective disaster management, facilities should be managed through regular maintenance on a daily basis, and in the case of an emergency, intuitive and accurate communication is essential regarding the situation and purpose. BIM manages the entire building property data using the effective 3D visualization model, so it can be used for various management purposes from design to facility maintenance. In this study, through an expert survey on the use of services in a BIM-based integrated disaster information system, the available areas of BIM data were organized in terms of facility information management, 3D visualization, and disaster control. Later, through the use service and DB definition within the BIM-based disaster integration information system, the main facilities monitoring and response services based on BIM and BIM-based spatial management service are proposed. Based on this study, it is hoped that the BIM-based application service functions within the system will be implemented to enable an effective system response.

The Present Status and Vision of Virtual Construction System Development (가상 건설 시스템 개발 현황과 비전)

  • Kim, Jae-Jun;Choi, Cul-Ho;Shin, Hyun-Mok;Jin, Sang-Yoon;Lee, Kwang-Myung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.170-175
    • /
    • 2008
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

Framework & Functions of Configuration Management (CM) in Nuclear Power Plants (NPP) (원자력발전소 형상관리 적용을 위한 Framework 및 생애주기단계별, 관리기법별 기능리스트 도출)

  • Kang, Mi-Yeon;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.101-112
    • /
    • 2015
  • In the 1950s, the concept of configuration management (CM) was started by the US Department of Defense (DOD). Later, it has begun to be applied in aerospace, software, engineering, construction, and nuclear power industry. However, configuration management (CM) in the Korean nuclear industry was firstly utilized in 2006 only for selected parts of facilities, while the US nuclear industry has applied CM for the facilities' entire systems since 1990s. Furthermore, configuration management (CM) is in its conceptual stage in the Korean nuclear industry because of ambiguous CM concepts, lacks of CM professional manpower, non-computerization, and inadequacy of CM procedures and processes. In order to address this issues, seven industries (including defense, aerospace, software, engineering, architecture, civil engineering, nuclear power) that utilize the concept of configuration management (CM) were compared and analyzed based on the CM purpose, technique, and life-cycle perspectives. By an extensive literature review and expert interviews, this paper developed a framework of configuration management (CM) for the nuclear industry. And also, a list of functions based on life-cycle stages and CM techniques are developed for clarifying CM framework in order to promote practical applications.

The Inplementation of Fault-Tolerant Dual System Using the Hot-Standby Sparing Technique (핫 스탠바이 스페어링 기법을 이용한 고장 감내 이중화 시스템 설계)

  • Shin Jin wook;Park Dong sun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.29 no.10A
    • /
    • pp.1113-1122
    • /
    • 2004
  • This paper is basically to achieve the high-availability and high-reliability of the control system from the implementation of the fault-tolerant system using the hot-standby sparing technique. To meet the objective, we design and implement a board with fault tolerance I/O bus to detect the fault. Warm-standby sparing technique is the fault tolerance technique usually used for switching control system in present. This technique can be easily implemented, but can not detect the fault quickly and can malfunction because of the hardware fault. The hot-standby sparing fault tolerant technique implemented in this paper is consists of dual processor modules and a I/O processor using fault tolerant I/O bus. The proposed method can find the faults as soon as possible, so it can prevent from wrong operation. Also it is possible to normal re-service due to the short recovering time. To implement the fault-tolerant dual system with fault detection be, two daughter, called FTMA and FTIA, boards designed and implemented are applied to the system. And we also simulated the proposed method to verify the high-availability and high-reliability of the control system using Markov process.