• Title/Summary/Keyword: 설계 단위작업

Search Result 150, Processing Time 0.033 seconds

A Cost-Based Interior Information Management for an Apartment Housing Project (원가기반의 공동주택 마감재 정보관리 방안 연구)

  • Lee, Hoon-Ku;Lee, Yoon-Sun;Moon, Hyuk;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.76-84
    • /
    • 2009
  • Korea's construction industry experienced no difficulty managing the costs of finishing work items in the apartment housing field thanks to the uniform specification and the standardized costs of finishing work items. Finishing work items have continuously become more high class and differentiated, which has caused the costs of finishing work items to rise. This study identified problems with the cost management when planning finishing work items and choosing their alternatives based on the current process applied to the planning stage of finishing work items. It also found problems with the information management of finishing work items including design, cost, and work information that took place in bulk. Based on the identified problems, the design, cost and work information of finishing work items was integrated so that they could management the costs and information when planning finishing work items and selecting their alternatives. Then a cost-based information management process was suggested for finishing work items by improving each of the project cost management elements. Finally, an information model for finishing work items was built by studying the ways to integrate the information hierarchy and library of finishing work items.

Power consumption scheduling scheme based on the per-appliance power requirement on the smart grid (스마트 그리드에서 기기별 전력 요구량에 기반한 전력 사용 스케줄 기법)

  • Lee, Junghoon;Kim, Hye-Jin
    • Annual Conference of KIPS
    • /
    • 2010.11a
    • /
    • pp.1363-1364
    • /
    • 2010
  • 본 논문에서는 스마트 그리드 시스템에서 사용자의 전력 사용 요구를 받아 이를 효율적으로 스케줄링하는 시스템을 설계하고 그 프로토타입을 구현한다. 각 기기들이 시작가능시간, 종료시한, 시간대별 사용량 변화를 명세하는 프로파일 등을 스케줄러에 넘겨주면 스케줄러는 각 작업의 시작가능시간과 여유시간 내에서 작업들을 배치한 후 리커시브하게 서치 스페이스를 확장하여 가장 최소의 단위시간당 최대 전력 요구량을 갖는 스케줄을 찾아낸다. 비선점형 작업의 특성에 의해 스페이스 확장의 복잡도를 크게 줄일 수 있으며 최소비용 소비 스케줄 등 다양한 목표를 위해 변경될 수 있다. 구현된 시스템은 주어진 작업 집합에 대해 최대 전력 요구량을 30 % 감소시키는 스케줄을 생성한다.

Design of a Interface for Digital Mock-up (디지털 목업 인터페이스 설계)

  • Park, Hee-Seoung;Kim, Sung-Kyun;Lee, Kyne-Woo;Oh, Won-Jin;Jin, Seong-Il
    • Annual Conference of KIPS
    • /
    • 2005.11a
    • /
    • pp.1403-1406
    • /
    • 2005
  • 원자력 시설 및 연구용 원자로 해체 시 해체 일정과 해체 폐기물량 그리고 해체 비용을 분석하기 위한 평가식이 수립되었다. 연구로 2 호기 Thermal column 자료를 참고하여 평가식을 실험하였다. 해체 공정 모사 결과를 애니메이션으로 보여주는 가시화 모듈과 해체 일정과 해체 폐기물량, 작업자 피폭선량 및 해체 비용 등을 평가식으로 계산 한 후 그 결과를 그래픽으로 보여주는 시뮬레이션 모듈로 구성된 해체 디지털 목업 시스템의 그래픽 사용자 인터페이스가 설계되었다. 해체 단위 작업별 평가식은 원자력과 관련한 시설 해체 시 해체 일정 및 해체 비용 분석 및 예측에 중요한 기초자료로 사용 될 것이다. 또한 그래픽 사용자 인터페이스는 방사능의 오염으로 인해 작업자가 접근하기 힘든 환경에서의 해체 활동을 사전에 경험함으로써 피폭으로부터 작업자의 안전성을 향상시킬 수 있는 유용한 도구로 활용될 수 있다.

  • PDF

Electronic Commerce Workflow Modeling Tool Design Using Database Agent (DB에이전트를 이용한 전자상거래 워크플로우 모델링 도구 설계)

  • 오종태
    • Journal of the Korea Society of Computer and Information
    • /
    • v.8 no.3
    • /
    • pp.16-25
    • /
    • 2003
  • Modeller is defined as the office work procedures(business processes), and that is systemically based upon the real-time collaborative operations by a set of actors, which is called group. This paper describes the design of the ICN editor that is operable under the real-time collaborative computing environment. We use the database agent that enables the ICN editor to operate among multiple actors(group) through the event-driven collaboration platform. Consequently, a set of workflow and business processes defined through this editor is not only stored onto database but also transformed into the format of the workflow process definition language(WPDL) that is a standardized worflow description and specification language proposed by the workflow management coalition(WfMC). This method can improve the performance of workflow processing by minimizing the workflow execution cost occurred during workflow definition.

  • PDF

Optimal Period by Calculating and Appling Correction Factor based on Setting of Non-Working Days of Construction Projects (건설공사의 작업불능일 기준설정에 의한 보정계수 계산 및 적용을 통한 최적공기 산정)

  • Lee, Pil-Yoon;Lee, Seong-Won;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.669-676
    • /
    • 2018
  • Schedule management in construction work is an important step for determining the construction period. On the other hand, there is a difference between the planned schedule and execution schedule because the estimation and calculation of Non-Working days, in which possible at the design stage is not performed properly. This paper proposes a method for estimating the working days by analyzing characteristics of the major work type and estimating the Non-Working days reflecting the Chuseok and New Year Holidays, which is the closest method to the actual work in the schedule planning. By applying the correction factor of the existing method and the improved method for the same construction in the same site, improved method was reduced by 22 days (9.1%) based on the actual working days. The importance of schedule management was confirmed as an example by comparing the data before and after the application of the standard (plan). These results show that the schedule delays, which are caused by the inconsistency between actual working days calculation that had been practiced conventionally and the working days on the schedule table, can be prevented. In addition, it will help to establish a schedule plan that is closer to reality.

Development of Automatic ALC Block Measurement Algorithm using Image Processing (영상처리에 의한 경량기포 콘크리트 블록의 치수 자동계측 알고리즘 개발)

  • 허경무;엄주진
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.41 no.5
    • /
    • pp.1-8
    • /
    • 2004
  • In this paper, we propose a machine vision system by which we can measure the size of ALC blocks in real-time in the Production Process. The images obtained by our system were processed by a devised algorithm, specially designed for the enhanced measurement accuracy. from the experimental results, we could find that the required measurement accuracy specification is sufficiently satisfied by using our proposed method.

Implementation of an Architecture for the Dismantling Digital Mock-up System (해체 디지털목업시스템 아키텍쳐 구현)

  • Park Hee-Seoung;Kim Sung-Kyun;Lee Kune-Woo;Oh Won-Jin
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.3 no.3
    • /
    • pp.237-247
    • /
    • 2005
  • It is necessary to forecast the various dismantling activities prior to dismantling nuclear facilities by using various software instead of a physical mock-up system because the dismantling in a contaminated with radioactivity cause the results of an unexpected situation. The component that needs to develop a dismantling mock-up system was examined. There are many component systems such as a decommissioning database system,3D dosimetric mapping that represents a distribution of a radionuclide contamination, a component of modeling for nuclear facility and devices include the decontamination and decommissioning. The research of software architecture about these components was carried out because these component systems that have been independently doesn't describe not only to visual an activities of Decontamination and Decommissioning(D&D) but also to evaluate it. The result was established an architecture that consist of an visualization module which could be visualized an D&D activities and a simulation module which can be evaluated a dismantling schedule and decommissioning cost.

  • PDF

A Study on Effects of Hydrological Factors on Critical Duration of Design Storm - Centering on the Wi-Cheon Stream - (설계강우의 임계지속기간에 미치는 수문요소들의 영향에 관한 연구 - 위천 유역을 중심으로 -)

  • Lee, Jong-Kyu;Yang, Hee-Shng;Jang, Ki-Hwan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.681-686
    • /
    • 2004
  • 수공구조물의 설계를 위해서는 해당 수공구조물의 중요도에 따른 설계빈도 및 설계유량과 설계수위 등의 설정이라는 과정이 필요하다. 설계빈도는 하천설계기준에 제시되어 있는 바와 같이 시설물의 입지조건과 중요도에 따라 기준이 제시되어 있으며 설계홍수량은 확률강우량을 기초로 한 설계강우를 결정하고, 결정된 설계우량에 의한 유출량의 산정작업이 필요하다. 이와 같은 설계수량의 산정에 있어서 설계강우의 지속기간 설정은 매우 중요한 작업이다. 일반적으로 동일한 설계빈도의 홍수량은 지속기간에 따라 많은 차이를 보이고 있다. 따라서 설계강우의 지속시간 설정은 매우 중요한 설계인자가 되므로 본 연구에서는 IHP유역인 위천유역을 대상으로 최근 권장되고 있는 설계강우의 지속시간 선정을 위한 개념인 임계지속기간을 산정하여 임계지속기간에 영향을 미치는 수문인자들에 대해 살펴보고자 한다. 본 연구에서는 IHP 유역인 위천 유역(동곡 외 4개 소유역)을 대상으로 설계홍수량의 첨두유출량이 최대로 발생하는 강우지속기간을 임계지속기간으로 설정하였으며, 설계홍수량의 산정시 설계강우로부터 홍수량을 산정하기 위한 일련의 절차에서 이용되는 각종 수문요소들, 즉 강우시간분포와 유효우량 산정방법, 유출모형 그리고 면적의 변화에 따른 임계지속기간의 변화를 연구하였다. 본 연구에서는 임계지속기간의 개념을 고려할 설계강우의 지속기간을 산정하기 위해 필요한 각 수문요소별 산정방법은 국내 자료로부터 제안된 방법을 우선 사용하였으며, 임계지속기간의 개념에 따른 설계강우의 지속기간 산정을 위해 확률강우량 산정, 강우의 시간분포(Huff 분포, Yen & Chow의 삼각형 분포), 유효우량 산정방법(AMC-II, AMC-III, CN37), 대표단위도와 6가지 합성단위도법을 적용하였다. 산정 된 결과로부터 임계지속기간 산정에 영향을 주는 각 수문인자 중 강우시간분포와 유효우량 산정방법 그리고 유출모형에 대해 자자 검토하였으며, 최종적으로 면적에 따른 임계지속기간과 유출량의 변화를 검토해 보았다.

  • PDF

Application of computer graphics for a preliminary evaluation of dismantling scenario (컴퓨터 그래픽스를 이용한 해체 공정 시나리오 예비 평가)

  • Park Hee-Seong;Kim Sung-Kyun;Lee Kyne-Woo;Jung Chong-Hun;Park Jin-Ho;Jin Seong-Il
    • Annual Conference of KIPS
    • /
    • 2006.05a
    • /
    • pp.1311-1314
    • /
    • 2006
  • 원자력 시설 및 연구용 원자로 해체 시 해체 공정의 효율성을 증진시키기 위해 컴퓨터 그래픽스를 이용한 해체 공정의 최적화 연구가 수행되었다. 애니메이션 설계를 위해 해체 시설 및 구조물과 해체 장비의 모델링이 완료되었으며, 방사능에 오염된 대상물의 방사능 분포도를 위치별, 준위별로 확인할 수 있도록 3 차원으로 나타내었다. 해체 일정과 해체 폐기물량 그리고 해체 비용을 모사하기 위해 각 정보들에 대한 평가식과 가중치 값을 도출하였다. 연구로 1 호기 Thermal column 을 대상으로 애니메이션을 통한 해체 공정절차 시각화와 단위 해체 공정 시나리오를 수행한 결과 애니메이션의 경우 해체 현장과 동일하게 모델링 되어 현장 작업자들이 해체 공정 절차를 쉽게 이해할 수 있다는 것을 확인하였으며, 시나리오 별 해체 소요시간과 폐기물량 그리고 해체 비용의 경우 정상적으로 모사가 수행됨으로써 단위 해체 공정에 대한 최적의 시나리오를 평가 할 수 있는 기초 연구의 틀을 마련하였다. 본 시스템은 해체 관리자, 해체 시스템 분석가, 해체 현장 감독과 해체 작업자들의 중요한 협업도구로 활용될 것으로 사료된다.

  • PDF

Design of PS-Block Structure for TMO Model based Static Analysis Tool (TMO 기반의 정적 분석 도구를 위한 PS-Block 구조 설계)

  • Kim, Yun-Kwan;Shin, Won;Kim, Tae-Wan;Chang, Chun-Hyon
    • Annual Conference of KIPS
    • /
    • 2005.11a
    • /
    • pp.263-266
    • /
    • 2005
  • 실시간 시스템은 시간적 정확성을 갖기 때문에 소형 임베디드 시스템부터 대형 분산 시스템까지 많은 분야에서 사용되고 실시간 시스템을 기반으로 하는 실시간 프로그램도 많은 분야에서 사용되고 있다. 이러한 실시간 프로그램의 시간적 특성을 지키기 위해 개발자들은 프로그램 개발에 집중하지 못하고 실행시간의 정의와 정의한 실행시간의 정확성 검사에 많은 시간을 보내고 있다. 실시간 시스템에 대한 연구 결과로서 TMO 모델은 실시간 개념에 따른 시간 처리의 다양한 기능을 지원하고, 응답시간을 보장하여 개발자가 프로그램 개발에 집중할 수 있다. 하지만, 실행시간의 정의는 개발자에 의해 이루어지기 때문에 이를 정의하고 그 정확성 여부를 확인하는 작업은 어렵다. 이러한 문제로 인하여 실행시간 정의의 기준점을 제시할 수 있는 도구가 필요하지만 이를 위한 TMO 분석 도구에 대한 연구는 미흡하다. 이에 본 논문에서는 TMO 기반 정적 분석 도구를 위한 PS-Block을 제시한다. PS-Block은 블록 단위로 실행시간을 분석할 수 있는 기반으로써 프로그램을 작업 단위로 분리하여 분석할 수 있도록 한다. 이를 기반으로 실행시간을 분석하여 시간 정보 결정의 기준으로 하고, 실시간 메소드의 적시성 확인을 쉽게 함으로써 실시간/신뢰성의 향상과 개발 기간을 단축할 수 있다.

  • PDF