• Title/Summary/Keyword: 설계업무

Search Result 1,970, Processing Time 0.03 seconds

A Design of Integrated Management System for Manufacturing Company with Multiple Production Strategies (다양한 생산전략을 가지는 제조업체의 통합 경영관리시스템 설계)

  • Ahn, Beum-Jun;Shin, Hyun-Joon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.7 no.2
    • /
    • pp.238-245
    • /
    • 2006
  • This study presents a design of integrated management system for manufacturing company for the purpose of reducing operation cost and speeding up flow of processes. Since common commercial management package should be well customized to reflect inherent processes of each company with great deal of effort, this study chooses a manufacturing company that produces component parts of automobile as a target company and designs management system specified for that target company. System design focuses on the minimization of the indirect cost of manufacturing reflected on the manufacturing cost price for each functional modules consisting of entire system through adding a mechanism to reduce unnecessary occurrence of process transactions. In addition, this paper considers connectivity among the functional modules so that manufacturing situations can be influenced on the system to be implemented and includes the system design with monitoring modules and data flow between functional modules.

  • PDF

Business Architecture Design of a Highway Asset Management System (도로자산관리시스템의 업무아키텍처 설계)

  • Nah, Hei-Suk;Lim, Jong-Tae
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.12
    • /
    • pp.931-942
    • /
    • 2011
  • As the social infrastructure becomes deteriorated, its maintenance cost has been increased rapidly. There are growing needs to manage facilities systematically to reduce this kind of maintenance budget, and furthermore to avoid safety accidents in Korea. Asset management is widely used in New Zealand, the United States, Great Britain to manage their social facilities. In these countries, standardized information model and its system are developed and in service for asset management. There are several researches on asset management of social infrastructure in Korea, and the KTAM-40 work procedure is one of the main results for these researches. In this paper, the IIMM of New Zealand and the KTAM-40 of Korea, were surveyed to develop a business architecture of the highway asset management system. A new business architecture for the highway asset management system is proposed based on the KTAM-40 work procedure: First, the organization and its role for the highway asset management are defined. Second, business functions of the highway asset management are classified. Third, the highway asset management functions and the flow of information are defined. In the last section, differences between the newly designed architecture and the other systems' architecture is reviewed.

Design management's development direction through design process improvement (설계업무 프로세스 개선을 통한 설계관리의 발전 방향)

  • Kim, Han;Kim, Seon-Gyoo;Lee, Nak-Woon
    • Journal of Industrial Technology
    • /
    • v.27 no.B
    • /
    • pp.169-176
    • /
    • 2007
  • Recently, construction industry has been magnified while various cooperative relationship makes steady process. So importance of management during construction is gathering strength. Therefore, we need systematic management gradually. But almost management of construction industry that performs these day is focused on construction phase not design phase. The purpose of the present study is to find the effective way of design management with enhancing the process of design phase.

  • PDF

The Design on the Quick Repairing Service System in NDIS Environment (NDIS 환경에서의 배전기동보수시스템 설계에 관한 연구)

  • Jang, M.J.;Shin, J.H.;Song, J.J.;Lee, B.J.
    • Proceedings of the KIEE Conference
    • /
    • 2001.10a
    • /
    • pp.175-179
    • /
    • 2001
  • 신배전정보시스템은 국가적 차원에서 수행 중인 지리정보시스템(Geographic Information System, GIS)을 기반으로 계획, 설계, 공사관리, 설비운영의 단계로 순환하는 배전업무의 특성에 따라 순시, 점검, 측정 등 현장업무에 정보체계 표준화를 이룩하고 이를 근거로 수집된 정보의 종합분석을 통해 경제적이고 합리적인 투자와 보수계획 수립이 가능하게끔 지원하는 종합시스템이다. 또한, 배전기동보수업무는 배전선로의 순시점검과 설비의 개 보수, 각종 측정과 점검, 사고와 고장 처리, 설비와 부하관리 등을 포함하는 중요한 업무중의 하나이다. 그러므로, 이런 업무를 종합배전시스템에 연계함으로써 종합배전시스템의 장점을 기동보수시스템에서 충분히 활용하고, 또한 기동보수시스템의 핵심자료를 종합배전시스템과 연계함으로써 배전정보를 체계적이고 종합적으로 활용하는 것이 가능하다. 이를 통해 업무생산성이 향상되고 사용자 운영의 편의성이 증대되기를 기대한다.

  • PDF

Research about sharing of compensation data between owner and contractor for construction CALS improvement (건설CALS 완성도 제고를 위한 다양한 이해당사자간 보상자료 공유방안 연구)

  • Seo, Myoung-Bae;Kim, Nam-Gon
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2010.06b
    • /
    • pp.144-147
    • /
    • 2010
  • 국토해양부에서는 건설산업의 투명성을 제고하고 생산성을 향상시키기 위해 1990년대 후반부터 건설사업정보화(CALS : Continuous Acquisition and Life-cycle Support) 사업을 진행중에 있다. CALS는 제조업의 모든 상품, 즉 주요장비 또는 다양한 상품 등을 획득하기 위한 설계, 생산과정, 또는 보급, 조달 및 이를 운영하는 운용지원과정을 연결시키고, 이들 과정에서 사용되는 각종 정보를 표준이라는 공통 창구를 통해 디지털화하여 컴퓨터상으로 정보를 통합하여 자동화시키는 개념이다. 이는 컴퓨터 네트워크를 이용해 상호 교환이 이루어지는 자동화되고 통합된 환경으로 변환시키는 정부와 기업간의 경영전략이라고 볼 수 있다. 이러한 개념에서 확장된 건설CALS는 건설공사 전 과정, 즉 기획, 설계, 조달, 시공, 유지보수 등의 과정에서 발생하는 각종 정보를 다양한 이해당사자가 교환하고 공유하기 위한 개념으로 출발하였으며, 현재 이를 지원하기 위한 5개의 단위시스템을 개발하여 운영중에 있다. 이중 용지보상시스템은 건설공사의 업무중에 시공단계에서 이루어지는 보상업무를 지원하는 시스템이다. 보상업무는 건설사업 과정 중에서 민원인과 직접대면하는 일이 많고, 액수도 클 뿐만 아니라 개인의 소유권과 밀접한 관계가 있기 때문에 분쟁의 소지가 매우 많다. 이에 본 논문에서는 보상업무 수행시 다양한 이해당사간의 각종 보상자료 교환체계 확립을 통한 업무 선진화방안 제시를 통해 업무의 투명성을 최대화하고 민원을 최소화하여, 보상업무 담당자에게는 업무의 효율성을 제고하고 민원인들에게는 국가행정에 대한 신뢰도를 높일 수 있는 보상업무 선진화 방안을 제시하고자 한다.

  • PDF

Workflow Procedures and Applications in BIM-based Design for Safety (DfS) (BIM 기반 설계안전성검토의 업무 절차와 활용 방안에 관한 연구)

  • Jaewoong Hwang;Heetaek Yoon;Junhyun Bae;Youngkon Park
    • Land and Housing Review
    • /
    • v.15 no.2
    • /
    • pp.125-137
    • /
    • 2024
  • A conventional Design for Safety (DfS), introduced to eliminate potential hazards in the design phase proactively, has encountered persistent challenges, such as perfunctory risk assessments and hazard identifications based on 2D drawings and inefficient workflow processes. This study proposes a BIM-based approach to Design for Safety (DfS) to address the limitations of conventional methods, aiming to enhance efficiency and achieve practical safety management benefits. The proposed workflow process for BIM-based DfS has been refined and validated for on-site applicability through various case studies, including risk assessments during the design phase and field applications for safety management activities during the construction phase. Specifically, the critical process of risk assessment within the DfS methodology has also been transitioned to a BIM-based approach. This BIM-based risk assessment process has been evaluated through case studies, encompassing safety reviews for structural design, construction equipment operation, and construction methodology with sequence in design projects. Additionally, the proposed BIM-based DfS has demonstrated exceptional on-site applicability and efficiency, as validated by the application of a BIM deliverable embedded in DfS information for CDE-based daily activity briefing, VR-based safety training, AR-based mitigation measures inspections, and other safety management activities in the construction phase.

Preliminary design for satellite image situation board linkage and display system (위성영상 상황판연계·표출시스템 예비설계)

  • Sang Min Lee;Eun Jeong Kim;Mi Rae Kim
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.458-458
    • /
    • 2023
  • 본 연구에서는 위성영상 활용 지능형 재난관측·감시 기술 개발을 목적으로 위성영상과 멀티소스(CCTV, 항공영상, 공공DB 등)와의 연계·융합을 통해 재난상황관리의 정확도 향상과 위성영상 활용성 제고 방안을 제시하고자 하였다. 위성영상 수집·배포시스템으로부터 전달되는 위성영상과 멀티소스의 연계 융합을 통한 재난상황정보의 표출을 목적으로 상황판연계 표출시스템 가동 절차와 위성영상 수집을 통한 위험탐지 알고리즘과의 연계를 위해 재난상황업무 기반 시스템 가동절차를 수립하고, 위기관리표준 매뉴얼 상 상황업무절차를 적용해 예비설계를 진행하였다. 상황실 실무자 설문을 통해 작성된 시스템 요구사항과 규격서를 기반으로 상황업무절차를 적용해 먼저업무시스템 설계를 진행하였다. 평시에는 GIS통합상황판에서 관리됨을 전제로 위성영상 수집에 대한국가적 예산 투입 측면을 고려해 중대본 설치가 필요한 대형재난 발생상황을 가정하여 상황판연계·표출시스템의 가동되도록 설계하였다. 또한, 위성영상 분석을 통한 피해위험도와 재난이력통계 등 멀티소스와 중첩한 결과를 실시간으로 표출함에 따라 상황실근무자는 재난확산 여부를 판단하고, NDMS를 통해 재난상황을 전파할 수 있도록 설계하였다. 상황판연계 표출시스템의 원활한 데이터 입/출력을 위해 재난유형 및 분석단계별 클래스 정의, 유스케이스 ID(요구기능)와 1:1 또는 1:n매칭을 수행하여 재난유형 및 분석단계별 클래스를 정의하였다. 정의된 클래스는 유스케이스인 요구기능과 매칭을 수행하였고, 시스템 가동절차 중 피해위험도분석, 재난이력통계, 중첩결과표출, NDMS 상황전파에 대한 상황업무절차를 기반으로 산불·홍수·산사태·대설·태풍 총 5종의재난별 시퀀스를 설계하였다. 마지막으로 화면정의서와 UI/UX설계서를 기반으로 Figma를 통해 시스템구동화면을 사전에 모의하였다. 향후, 진행되는 연구에서는 위성영상과 멀티소스를 연계한 화면을 실체화하여 더욱 정확한 재난상황관리가 가능하도록 NDMS 연계 상황판 표출 시스템을 개발하고자 한다.

  • PDF

The Study on the Mechanism of the Information Exchange and Synchronization for e-DURE System (공공기관 표준업무관리시스템(e-DURE) 구현을 위한 시스템간 정보교환 및 동기화방안에 관한 연구)

  • Kang, Eun-Sook;Lee, Jang-Soo;Kim, Dong-Hyuk;Shim, Jang-Sup
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2007.05a
    • /
    • pp.506-509
    • /
    • 2007
  • 본 논문에서는 정보통신부와 정보통신연구진흥원에서 개발하여 구축한 e-DURE시스템(정보통신부 산하/유관기관용 표준업무관리시스템)의 설계와 구현시 반영된 정보교환 및 동기화 방안을 연구하여 구체적으로 기술하였다. 정부와 산하기관의 구조와 업무처리방식을 반영하여 시스템을 설계하였고, 축적되는 데이터의 실시간 공유를 위해 Web Services와 SOAP 프로토콜을 사용하여 정보를 교환하였다. 또한, 데이터의 정확성을 향상시키기 위해 유효성 검증 모듈을 설계/개발하였으며, 패키지 및 ASP시스템에서 포털시스템으로 전송하는 데이터의 오류를 찾아내어 필터링하고 동기화해 주는 방안을 구현하였다. 본 연구를 통하여, 기관간 공유하고자 하는 데이터가 실시간으로 유통되었으며 데이터의 정확성이 유지되어 업무 프로세스의 획기적인 개선이 이루어졌다.

  • PDF

Design and Implementation of Modeling Tool for e-Logistics Collaboration Process Definition (물류 협업 프로세스 정의를 위한 모델링 도구)

  • 채정숙;최성환;김인수;김혜규
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2002.10d
    • /
    • pp.79-81
    • /
    • 2002
  • 인터넷을 이용한 기업간 전자상거래를 위해 기업 내부의 업무 흐름을 관리하는 워크플로우에 관한 관심이 높아지고 있다. 워크플로우 엔진을 구동시키기 위해 먼저 고려되어야 하는 것이 기업 내부의 업무 프로세스를 정의하고 정의된 프로세스를 validation할 수 있는 모델링 도구가 필요하다. 이에 본 논문에서는 물류 협업 프로세스를 정의하고 모델링하기 위한 EJB 기반의 Business Process Modeling Tool(BPMT)를 설계 및 구현하다. BPMT는 WPDL을 지원하는 다 기종의 워크플로우 엔진에서도 협력 체제를 구축할 수 있도록 설계되었으며, 프로세스를 수행시키기 위한 Activity, Transition, Process, Organization, Application, RelevantData DataType으로 구성 되는 일련의 업무 흐름을 정의하며, 범용적인 의미의 Process 설계 도구로서 사용자가 편리하게 작업할 수 있도록 Integrated UI를 지 원한다. 또한 기본적인 물류 영역의 업무 프로세스를 라이브러리화하여 제공함으로써 사용자로 하여금 새로운 물류 프로세스 정의를 쉽게 한다.

  • PDF

Analysis and Design of Arch Bridge based on BIM (BIM기반 아치교량에 대한 구조해석 및 설계 연구)

  • Lee, Heon-Min;Oh, Seock-Jin;Chen, Ju-Hyun;Shin, Hyun-Mock
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.521-524
    • /
    • 2010
  • 현재 국내에서는 상품 생산을 위한 각 공정의 업무를 통합관리 해 줄 수 있는 PLM(Product Life-cycle Management)시스템을 건설업에 도입하려는 움직임이 있으며 실제 건설 구조물에 대한 통합환경 시스템인 CPLM(Construction Product Lifecycle Management) 관련 연구를 진행 중에 있다. 통합 시스템 내에서 건설 구조물 생산을 위한 각 업무분야에서는 시스템이 추구하는 업무진행의 흐름에 맞추어 작업을 수행 할 수 있도록 하는 각자의 프로세스를 개발해야 한다. 이 연구에서는 토목구조물을 대상으로 협업환경 내에서 활용 가능한 3D 정보모델인 BIM기반의 해석 및 설계 프로세스를 구축하고 국내외 토목건설산업 분야에서 차세대 설계프로세스로 유력한 BIM기반의 구조해석 및 설계 프로세스의 실용화를 위한 기초자료를 제공함을 목적으로 하며 해석 및 설계 대상 구조물로 아치교량을 선정하여 연구를 진행하였다.

  • PDF