• Title/Summary/Keyword: 설계변경

Search Result 2,454, Processing Time 0.028 seconds

3D Virtual Building Technic using Pattern (패턴을 이용한 3D 가상 건축 기술)

  • Han, Jung-Soo;Kim, Gui-Jung
    • The Journal of the Korea Contents Association
    • /
    • v.10 no.8
    • /
    • pp.66-72
    • /
    • 2010
  • This paper is focus on 3D virtual building design technic that construction materials are showed by components and these components are part of patterns, and building design using pattern is possible. To use this technique in process of construction, design, analysis, change, assembly, etc, we will develop flexible building design system that it supports efficient building change and low cost by construction design simulation. Specially also the designer and the user use a pattern and easily will be able to change the building and according to change pattern information of the materials, design of the buildings which are changed creates automatic. Also we will implement knowledge retrieval engine which is necessary to personal skill or visualization.

Cost Scaling Factor according to Power Plant Capacity Change (발전소 용량변경에 따른 비용보정계수)

  • Ha, Gak-Hyeon;Kim, Sung-Hwan
    • Journal of Energy Engineering
    • /
    • v.22 no.3
    • /
    • pp.283-286
    • /
    • 2013
  • The existing nuclear power plants have been often redesigned by increasing or decreasing electrical power without changing design concept by the request of utility, economic factors or other factors. When the cost of power plant equipment redesigned by changing reactor power and electrical power is estimated, if its quotation is not available in the market place, cost scaling factor(CSF) applies to the cost of existing plant equipment and then the new-designed equipment cost can be calculated. In this paper, we review CSFs according to plant capacity change cases in United State DOE, EPRI, ABB, SWEC and introduce the results applied to Korean PWR 1000MWe and 1400MWe.

Design modification of PM synchronous Generator for 2MW Wind turbine (2MW 직접구동형 발전기의 설계 변경)

  • Kim, Taehun;Kim, Geohwa;Won, Junghyun;Lee, Sooho;Kim, Dongeun;Chung, Chinwha;Park, H.C.
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.181.2-181.2
    • /
    • 2010
  • 포항공과대학교 풍력특성화대학원에서는 STX Windpower의 풍력발전기 국산화 사업의 일환으로 2MW 직접 구동형 영구자석 동기발전기의 설계를 변경 하였다. 정격 출력 2.3MW급으로 정격 RPM은 16.5, 고정자 내경은 2.1m로 128극을 가지고 있다. 본 설계 발전기는 STX93 모델을 기반으로 하고 있으며, 기존 발전기보다 더 compact하고 더 높은 효율의 발전기로 설계 변경하였다. 본 논문에서는 발전기 물리 설계와 그에 따른 전자기 해석 및 열 분석을 수행하고 손실을 계산한다. 또한, 그 결과와 절차에 대하여 요약하고 기존 발전기와 설계 발전기를 비교 분석한다.

  • PDF

An Application of UI System Design Methodology based on System Formalism for a Large Security System (보안시스템의 개발을 위한 시스템 형식론에 의한 사용자 인터페이스 시스템 표현과 DEVS 모델링)

  • 안영숙;조대호
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2003.11a
    • /
    • pp.207-217
    • /
    • 2003
  • 지능적으로 공격 패턴을 달리하는 많은 공격들에 대응하기 위해 기존의 보안 시스템은 강력한 보안시스템으로 확장되고 있다. 보안 시스템과 같은 규모가 크거나 복잡한 소프트웨어 계발에 있어서 설계 및 구현 과정에서 있는 설계 변경 및 구현상의 변경으로 인한 전체 시스템에 미치는 영향이 크다. 본 논문에서는 규모가 큰 보안시스템 계발에 있어서 전체 시스템의 영향 관계를 체계적으로 정립한 소프트웨어 설계 방법론으로의 적용이다. 소프트웨어 설계 방법론은 시스템 형식론에 의거하여 소프트웨어가 표현되었으므로 논리적 연관관계를 추적하기 쉽다 이는 소프트웨어 설계 또는 설계 변경 후 인터페이스 시스템의 중요한 동적 특성을 미리 파악 할 수 있게 하여 소모적일 수 있는 시간과 노력을 절약 할 수 있다.

  • PDF

A Priority and Impact Factor Analysis of Construction Management Tasks for Decreasing Change Orders and Defect Repairs in Cancer Treatment Center Projects (암센터 의료시설의 설계변경과 하자보수의 감소를 위한 중점 관리공사 분석)

  • Lee, Chijoo;Lee, Ghang;Sim, Jaekyang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.55-64
    • /
    • 2013
  • The complexity of constructing medical institutions is higher than that of general buildings, and many change orders in the design and defect repairs in the construction phase are required due to strict government regulations. The priority control of constructions and impact factors of medical institutions were analyzed in this study, and difficulties in the control in the design and construction phase were identified. First, the priority management factors that were identified were as follows: architecture, facilities, and electricity. Second, 1) priority management in constructions and factors resulting in change orders and 2) priority management in constructions involving defect repair were analyzed. Third, the importance recognized by the construction managers were analyzed. The priority management in constructions and factors that were recognized by the construction manager were deducted as having low importance, although there were many change orders and defects. The work of finishing, wall building, joining, office automation and communication function, and lighting were analyzed in the design phase, and waste, the office automation and communication function, ceilings, contamination control, and plumbing were analyzed in the construction phase. The results showed that there will be a decrease in change orders and defects if the concentration of the manager was elevated and priorities were managed.

(A Process Model to Improve the Requirements Change Management for the Development Methodologies) (개발 방법론의 요구 사항 변경 관리를 개선하기 위한 프로세스 모델)

  • 정규장;신종철;구연설
    • Journal of KIISE:Software and Applications
    • /
    • v.30 no.5_6
    • /
    • pp.503-514
    • /
    • 2003
  • In conventional development methodologies, requirements are considered to be not changing after analysis phase, and requirements specifications are used for the next step system design purpose. But in the real world, requirements can be changed and modified throughout the development life cycle according to end-user's more understanding about the target system, new IT technologies, changes of customer environment and market situation, and so on. So there needs a requirements change management process that can extend requirements management over the entire development life cycle and can support managing changes to the requirements after design phase. In this paper, a requirements change management process that can be integrated into conventional development methodologies is proposed to support the extension of requirements life cycle and managing changes to the requirements after design phase. This process was evaluated through an verification test with a widely used development methodology‘MaRMI’.

Cooling Performance of PC cooling Fan For Various Cooling Fan Blade numbers and Design Shapes (PC용 냉각팬의 형상 및 블레이드의 수 변화에 따른 냉각성능)

  • Park, Won-Keol;Lee, Dong-Ryul
    • Proceedings of the KAIS Fall Conference
    • /
    • 2012.05b
    • /
    • pp.685-689
    • /
    • 2012
  • 본 연구는 PC용 냉각팬의 효율적인 설계를 위하여 냉각팬의 형상 변경 및 블레이드의 수 변화를 통해서 PC 부품 발열체의 온도변화를 수치해석적으로 수행하였다. 기존의 냉각팬 형상을 기준으로 블레이드의 수를 변화시키고 실제 형상을 변경한 냉각팬을 동일한 설계 입력조건를 적용하여 비교 분석하여 냉각성능을 파악하였다. 두 Case를 비교한 결과 기존 형상은 블레이드의 수가 증가 할수록 냉각효과가 커졌고, 형상을 변경한 냉각팬의 경우 Blade 6에서 가장 큰 냉각 효과를 보였다. 그리고 Blade 6과 8을 비교해 봤을 때 두 블레이드 사이에서 온도차이는 미소한차이로 냉각효과를 비교하기 어려웠다. 두 Case에서 제작과정과 비용을 비교해 보았을 때 Case 2의 Blade 6 경우가 더 우수한 것으로 보아 형상을 변경한 블레이드에서 최적설계를 얻을 수가 있었다.

  • PDF

월성 2호기 원자로 안전계통 설계 개선에 관한 고찰

  • Kim, Seok-Nam;Kim, Seong;Han, Hui-Hwan;Han, Sang-Jun;Park, Seok-Jun
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.11a
    • /
    • pp.203-208
    • /
    • 1996
  • 발전소 비정상 상태시 원자로를 신속히 정지시키고 정지후 원자로 내의 열을 효율적으로 제거하며 또한 그러한 상태에서 발생할 수 있는 방사성 물질을 환경으로 누출되는 양을 제한하여 방사성 물질 방출로부터 공중을 보호하기 위한 계통으로, 월성 2호기는 새로운 인허가 요건 사항 변경, 적용 코드 및 기준(Code & Standard) 변경 및 요건 강화, 생산 및 제작 중단에 의한 변경, 기타 월성 1호기에서 운전중 불편하고 개선되어야 할 사항 등 총 84개의 설계 변경을 적용하여 월성 1호기 보다 진보, 개량된 발전소로 설계하여 2호기는 97년 상업 운전 목표로 시운전중에 있다.

  • PDF

국가계약법 회계예규 개정

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.11 s.208
    • /
    • pp.29-40
    • /
    • 2007
  • 국가계약법 시행령이 개정됨에 따라 재정경제부는 공사계약 일반조건, 입찰조건, 입찰유의서 등 회계예규를 개정하고 지난 10월 12일부터 시행에 들어갔다. 개정된 시행규칙은 공사계약일반조건에서 설계서와 물량내역서 등의 범위에 대한 정의규정 보완/손해보험 관련 손해공제 포함/설계변경 관련 조문정리/설계변경 계약금액조정 제한대상 추가 및 입찰금액조정 규정 마련/특정규격의 자재별 가격변동에 따른 계약금액조정 관련 등이 개정되었고, 공사입찰유의서에는 입찰에 관한 서류의 열람 및 교부/입찰무효사유 보완/낙찰자가 부적격자로 판명된 경우 낙찰자 결정 방법 개선/조문정리 등이 개선되었다.

  • PDF

Ageing Assessments of Nuclear Components (원자력발전소 기기의 노화손상 평가)

  • 박인규
    • Journal of the KSME
    • /
    • v.33 no.5
    • /
    • pp.414-420
    • /
    • 1993
  • 원자력 발전소의 운전환경에 따른 노화손상은 발전소 운전 내력에 연류된다. 통상SCC는 40년 또는 40년 이하의 수명을 가정하여 이에 따른 설계 여유도나 안전 계수를 기초로 하여 설계된다. 그러나 설계여유도나 안전계수는 운전중 변경될 수도 있다. 원자력 발전소 기기의 변경될 수도 있다. 원자력 발전소 기기의 수명평가를 위해서는 초기설계치 및 잔여수명이나 실제 설계치의 변화 등을 평가하여야 한다. 주요 물성치 및 손상 매개변수의 실제 변경 상황은 수명기간 설정에 근간이 된다. SSC의 수명평가를 위해 재료의 노화손상은 철저히 파악되어야 한다. 또한 기계적 하중, 열적하중 등의 노화 촉진요인과 정상운전 및 시험도 노화손상에 영향을 미치므로 이들에 대해 상세 평가를 수행하여야 한다. 수명평가는 운전환경 및 노화촉진요인들과 밀접한 관련이 있으므로, SSC의 수명을 평가하기 위해서는 이러한 복잡한 변수들 사이의 연관관계를 구체적 으로 고려하여야 한다. 그러므로 SSC의 수명을 평가하기 위해서는 이러한 복잡한 변수들 사이의 연관관계를 구체적으로 고려하여야 한다. 그러므로 SSC의 설계, 제작, 설치, 시험, 운전상태 및 보수주기 등에 대한 정보파악이 선행되어야 한다.

  • PDF