• Title/Summary/Keyword: 선행굴착방식

Search Result 6, Processing Time 0.018 seconds

Effect of widening excavation in divergence section of a double-deck tunnel on its stability (복층터널 분기구 확폭구간 굴착에 따른 안정성 영향)

  • La, You-Sung;Kim, Yunhee;Lee, Kangil;Kim, Yongseong;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.435-450
    • /
    • 2020
  • The divergence section of a double-deck tunnel can be divided into a 'widening pre-divergence section', a large cross-section with a cap shape and a 'post-divergence section' where the separation between the main and the branch tunnel is made. Since the cross-section of the widening pre-divergence section is considerably larger than that of the post-divergence section, the influence of excavation due to the different sizes and shapes in the cross-section should be considered in the examination of the tunnel stability. In this study, the effect of the preceding excavation, that is the excavation of the widening pre-divergence section, on excavation stability of the post-divergence section was examined by varying the excavation methods and bench lengths through 3D finite element analysis. The results showed that although the effects of the excavation methods and the bench lengths are not significant on the variation of principal stresses, the preceding excavation causes a relatively large variation on the stresses which may have an impact on the stability of the post-divergence section from the comparison of Stress-Strength Ratio (SSR) between the cases with and without the consideration of the preceding excavation effect by 2D finite element analysis.

A Characteristics of the Strength Recovery of the Soil Adjacent to the Pile Depending on the Construction Methods of a Environment-friendly Screw Concrete Pile for a Noise- and Vibration-free Method (무소음·무진동을 위한 환경친화적인 스크류콘크리트말뚝의 시공법에 따른 말뚝 인접 지반의 강도 회복 특성)

  • Kim, Dong-Chul;Choi, Youngkyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.1
    • /
    • pp.71-80
    • /
    • 2013
  • Before and after the test constructions, and after an 11-month hiatus from the pilot pile installations, the in-situ tests (CPT, SPT) were carried out at the ground adjacent to the noise- and vibration-free screw concrete piles installed by 2 kinds of construction methods (i.e., the toe-jetting shoe type, the pre-digging type). In the toe-jetting shoe type construction methods, after construction, the soil strength within 3.5D (where, D = pile diameter) from the pile center decreased greatly by about 46% of the original ground and, after an 11-month hiatus, a strength recovery adjacent to the piles appeared about 71% of the original ground. In the pre-digging type construction methods, a strength recovery adjacent to the piles appeared 100% of the strength of the original ground.

An Analysis on the Vertical Load Bearing Behavior according to Construction Methods of a Environment-friendly Screw Concrete Pile for the Noise and Vibration-free Method (무소음.무진동 공법을 위한 환경친화적인 스크류콘크리트말뚝의 시공방법에 따른 연직하중지지거동 분석)

  • Kim, Dongchul;Choi, Yongkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.6
    • /
    • pp.5-11
    • /
    • 2013
  • Because the regulation for a noise and a vibration in our country has been being reinforced more and more, a more environment-friendly pile construction method than a current low-noise and low-vibration method was needed for the close construction in the downtown area. In this study, the characteristics of a screw concrete pile method for noise and vibration-free method was explained, and it's vertical bearing capacity was studied in the base of the static pile load test data of the screw concrete piles. Constructed by two methody; a pre-digging shoe type construction method and a toe-jetting shoe type construction method. The vertical load bearing capacity of a screw pile constructed by the former was more about 70% than that of a screw pile constructed by the latter.

A study on the excavation cycle by the drill-and-blast method for a room-and-pillar underground structure (주방식 지하구조물의 발파 굴착공정 분석 연구)

  • Lee, Chul-Ho;Hyun, Young-Hwan;Hwang, Je-Don;Choi, Soon-Wook;Kang, Tae-Ho;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.6
    • /
    • pp.511-524
    • /
    • 2016
  • Since a room-and-pillar underground structure is characterized by its grid-type array of room and pillar, its economical efficiency can be governed by excavation sequence. In this study, the construction period by the drill-and-blast method as a excavation method for a room-and-pillar underground structure was examined. In addition, the parallel excavation sequence was considered as the main sequence of a room-and-pillar underground structure. Sequences of mucking and support installation were derived to estimate the total excavation cycle by taking the case of a road tunnel into consideration. From the excavation cycle of room-and-pillar underground structure, the relationship between available maximum and minimum numbers of jumbo drill machines depending on the number of faces in operation was suggested.

Reserch On The Fundamental Technology To Utilization Of Platform To Providing Mobile Underground Geospatial Infomation Map (모바일용 지하공간통합지도 제공 플랫폼 활용을 위한 기반 기술 연구)

  • LEE, Tae-Hyung;KIM, Hyun-Woo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.23 no.4
    • /
    • pp.173-183
    • /
    • 2020
  • In the midst of the aging of underground facilities in urban areas and anxiety about road excavation safety accidents, the Ministry of Land, Infrastructure and Transport began to build Underground Geospatial Infomation Map from 2015 as part of the 「ground subsidence prevention measures」 and efficient use of underground spaces. So, the scope is spreading every year. The current Underground Geospatial Infomation Map information is web-based and is operated in a desktop environment, so it is true that there are some limitations in its use in a field environment such as an excavation construction site. The Underground Geospatial Infomation Map, built and operated in a web-based environment, is a large-scale 3D data. Therefore, in order to service by transmitting data to the field without delay, it is necessary to lighten the Underground Geospatial Infomation Map data. In addition, the current Underground Geospatial Infomation Map is not unified in data formats such as 3DS and COLLADA, and the coordinate system method is also different in relative coordinates and absolute coordinates. In this study, by analyzing domestic and overseas prior research and technical use cases, a mobile Underground Geospatial Infomation Map data format and a lightweight method were presented, and a technology development was conducted to create a mobile underground space integration map in the presented format. In addition, the weight reduction rate was tested by applying 3D data compression technology so that data can be transmitted quickly in the field, and technology was developed that can be used by decompressing 3D data compressed in the field. finally, it aims to supplement the technology experimentally developed in this study and conduct additional research to produce it as software that can be used in the excavation site and use it.

A study on the improvement of the protective shield construction method and explosion-proof tube performance for tunnel blasting (터널 발파에 대한 방호쉴드 공법 및 방폭튜브 성능 개선 연구)

  • Sang-Hwan Kim;Soo-Jin Lee;Jung-Nam Kwon;Dong-gyun Yoo;Yong-Woo Kim;Kwang-Eun Cho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.4
    • /
    • pp.285-303
    • /
    • 2023
  • Interest in building underground spaces is increasing for the creation of downtown infrastructure and efficient space utilization. A representative method of utilizing underground space is a tunnel, and in addition to road tunnels, the construction of utility tunnels such as power conduits and utility conduits is gradually increasing. The current basic tunnel construction method can be divided into NATM (New Austrian Tunnelling Method) and TBM (Tunnel Boring Machine). The NATM is a reliable method, but it is accompanied by vibration and noise due to blasting. In the case of the TBM excavation method, there are disadvantages in terms of construction period and construction cost, but it is possible to improve economic feasibility by introducing appropriate complementary methods. In this study, a blasting method was develop using the NATM after TBM pre-excavation using the protective shield method. This is a method that compensates for the disadvantages of each tunnel construction method, and is expected to reduce construction costs, blasting vibration, and noise. In order to review the performance of the developed method, an experiment was conducted to evaluate the performance of explosion-proof tube to which a protective shield scale model was applied, and the impact of blasting vibration of the protective shield method was analyzed.