• Title/Summary/Keyword: 선박당 하역량

Search Result 3, Processing Time 0.015 seconds

An Empirical Study on Berth-Length Calculation of Container Terminal (컨테이너 터미널 안벽길이 산정에 관한 실증 연구)

  • 송용석;남기찬;연정흠;김정은
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2003.05a
    • /
    • pp.115-120
    • /
    • 2003
  • This study aims at calculating berth length required of the given volume of containers. For this, unlike previous studies assuming 300,000 TEU per berth as the capacity of a berth, this study attempts to apply more realistic situation such as the distribution of vessel size, lifts per vessel, berth time by vessel size, and average berth occupancy ratio. the result are compared with that of Pusan New port planning.

  • PDF

Assessing Greenhouse and Noxious Gas Emissions from Stevedoring Work at the Port of Incheon (인천항 육상하역 작업에 따른 온실가스 및 유해가스 발생 추정)

  • Roh, Younghoon;Chang, Young-Tae
    • Journal of Korea Port Economic Association
    • /
    • v.31 no.4
    • /
    • pp.133-150
    • /
    • 2015
  • This study estimates greenhouse and noxious gas emissions caused by cargo-handling equipment at the Port of Incheon in 2013 by applying the NONROAD Model (U.S. EPA). The port emitted 838.4 tons of NOx and 82,747 tons of CO2. The estimates are 2.4 times higher for NOx and 1.3 times higher for CO2 than those of the Port of Los Angeles. Emissions from general cargo-handling equipment are five times more than those from container cargo-handling equipment. Among the three ports comprising the Port of Incheon, the emissions at the North Port, which handles raw materials for industry are relatively higher than those at the other ports. Compared to the study conducted by Chang et al. (2013, 2014), this study finds that CO2 and NOx emissions per cargo-handling equipment are 10 times higher than the corresponding amounts per ship.

An Empirical Study on Berth-Length Calculation of Container Terminal (컨테이너 터미널 선석길이 산정에 관한 실증 연구)

  • Song, Yong-Seok;Nam, Ki-Chan;Yeon, Jeong-Hum;Kim, Jeong-Eun
    • Journal of Navigation and Port Research
    • /
    • v.27 no.2
    • /
    • pp.179-184
    • /
    • 2003
  • In order to mitigate the overcapacity of Busan port, Busan new port has been developed as transshipment port which is capable of handling 8,000 TEU containership. Generally, design of transshipment port has to reflect the capacity of feeder because both mother vessels and feeders enter the planned port at the same time. However, the existing plan of Busan new port capacity needs to be reexamined since the adopted capacity of each berth at new port, 300,000 TEU, does not seem to be enough to handle both mother vessels and feeders. Therefore, in this study we calculated the required number of berth and berth length by considering cargo handling capacity in terms of the ship size and this study makes some implications in relation with the terminal development plan.