• Title/Summary/Keyword: 생애주기 에너지 분석

Search Result 51, Processing Time 0.027 seconds

Evaluation of Life Cycle Energy Consumption and CO2 Emission of Elementary School of Buildings (초등학교 건축물의 생애주기 에너지사용량 및 이산화탄소 배출량 평가)

  • Ji, Changyoon;Hong, Taehoon;Jeong, Jaewook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.52-60
    • /
    • 2016
  • This study investigates and analyzes the total amount of energy consumption and $CO_2$ emission during the material manufacturing, transportation, construction, operation, and disposal phases of eight elementary school buildings in South Korea. Toward this ends, the hybrid LCA model is proposed. The life cycle energy consumption and $CO_2$ emission of eight case buildings are assessed using the hybrid LCA model with an assumption that the operation period is 40 years. As a result, the embodied(sum of the energy consumption in the material manufacturing, transportation and construction phases), operational and disposal energy were 2,279, 11,182, $228Mcal/m^2$, respectively, on average. The average embodied, operational, and disposal $CO_2$ emission were 604, 2,708, 60 kg-$CO_2/m^2$, respectively, on average. This result indicates that about 17% of life cycle energy (or $CO_2$ emission) is consumed in the material manufacturing, transportation and construction phases. Thus, it is necessary to consider the embodied energy and $CO_2$ emission to reduce the life cycle energy and $CO_2$ emission of school buildings. In addition, while the insulation standard of building have been provided based on the climate zone, energy consumption in operation phase still varied depending on the regions in this study. Thus, the insulation standard of building needs to be improved through considering the climate of regions in detail.

Comparison of Relative Weights of Cost for Road-bed Construction and Energy on Life Cycle Cost of Railroad -in Case of Seoul-pusan High Speed Rail (철도노선의 생애주기비용에서 노반건설비와 에너지비용의 상대적 비중 분석 - 경부고속철도 사례를 중심으로)

  • Suh, Sunduck;Kim, Jeong Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.4
    • /
    • pp.1261-1267
    • /
    • 2014
  • It is generally recognize that the weight of energy cost for railroad alignment in the life cycle cost is higher than that for roadway. This study analyzed the relative weights of railroad road-bed construction cost and energy cost in the case of Seoul-Pusan High Speed Rail. Recently, the optimization of railroad alignment with computerized methodology has been studies. The optimization is supposed to aim the minimization of life cycle cost including the energy cost as well as the minimization of the construction cost. The operation period of the Seoul-Pusan High Speed Rail is limited to ten years, then various future operation scenario were developed for the next 20 years. The weight of energy cost is estimated 10~30% of the construction cost by scenario, and it is lower than the figure generally expected. It may be meaningful to provide the method to include the energy cost in the railroad alignment optimization.

Life cycle determination of water distribution system using life cycle energy analysis (생애주기 에너지 분석을 이용한 상수관망의 생애주기 결정)

  • Lee, Seung-Yub;Yoo, Do-Guen;Kim, Joong-Hoon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.1
    • /
    • pp.11-21
    • /
    • 2015
  • When designing Water Distribution System (WDS), determination of life cycle for WDS needs to be preceded. And designer should conduct comprehensive design including maintenance and management strategies based on the determined life cycle. However, there are only a few studies carried out until now, and criteria to determine life cycle of WDS are insufficient. Therefore, methodology to determine life cycle of WDS is introduced in this study by using Life Cycle Energy Analysis (LCEA). LCEA adapts energy as an environmental impact criterion and calculates all required energy through the whole life cycle. The model is build up based on the LCEA methodology and model itself can simulate the aging and breakage of pipes through the target life cycle. In addition the hydraulic analysis program EPANET2.0 is linked to developed model to analyze hydraulic factors. Developed model is applied to two WDSs which are A WDS and B WDS. Model runs for 1yr to maximum 100yr target life cycle for both WDSs to check the energy tendency as well as to determine optimal life cycle. Results show that 40yr and 54yr as optimal life cycle for each WDS, and tendency shows the effective energy is keep changing according to the target life cycle. Introduced methodology is expected to use as an alternative option for determining life cycle of WDS.

Scenario-based Design and Life Cycle Cost Analysis of Energy Supply System for Transportation Sector (도로운송부문용 에너지 공급 시스템 설계 및 경제성평가)

  • Han, Seulki;Kim, Jiyong
    • Korean Chemical Engineering Research
    • /
    • v.53 no.2
    • /
    • pp.164-173
    • /
    • 2015
  • This study aims to design energy supply systems from various energy sources for transportation sectors and comparatively analyze the life cycle cost of different scenario-based systems. For components of the proposed energy supply system, we consider a typical oil refinery, byproduct hydrogen system, renewable energy source (RES)-based electric generation system and existing electricity grid. We also include three types of vehicles in transportation sector such as internal combustion engine vehicle (ICEV), electric vehicle (EV), fuel cell vehicle (FCV). We then develop various energy supply scenarios which consist of such components and evaluate the economic performance of different systems from the viewpoint of life cycle cost. Finally we illustrate the applicability of the proposed framework by conducting the design problem of energy supply systems of Jeju, Korea. As the results of life cycle cost analysis, EV fueled by electricity from grid is the most economically feasible. In addition, we identify key parameters to contribute the total life cycle cost such as fuel cost, vehicle cost, infra cost and maintenance cost using sensitivity analysis.

Optimal Life Cycle design of Water Pipe System using Genetic Algorithm (상수관망 최적 생애주기 설계를 위한 유전알고리즘의 적용)

  • Lee, Seungyub;Yoo, Do Guen;Jung, Donghwi;Kim, Joong Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4216-4227
    • /
    • 2015
  • In this study, a model is developed based on Life Cycle Energy Analysis (LCEA) method with Genetic Algorithm (GA) to determine optimal diameter of Water Distribution System (WDS). For hydraulic analysis the EPANET2.0 program is linked with developed model, pipe-aging equation and pipe-breakage equation are built in to developed model to simulate pipe change through life cycle. The model is then applied to two sample WDSs for optimal energy design. After determining optimal diameter for each WDS, the total cost is calculated based on determined diameter and compared with well-known optimal diameter set of each WDS. Results show that optimal energy design of WDSs through the developed model can be an alternative option for optimal design of WDSs for reducing energy with lower in cost.

A Comparison Analysis of Life Cycle Cost (LCC) of Pumps - In the Focus on Comparison of Excellent and General Products in Water Industry - (Pump의 생애주기 비용(LCC) 비교 분석 - 물산업 우수제품과 일반제품의 비교를 중심으로 -)

  • Park, Woopyung;Choi, Yong;Jeon, Si Young;Kim, Jinho;Kang, Seongmi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.66-73
    • /
    • 2022
  • In order to induce users to purchase excellent products in the water industry that satisfy the technical standards of excellent products, in this study, it is to present the advantages of the cost aspect of the pumps as the objective basis. It will be to promote technology development of domestic water companies and to create a virtuous cycle structure in the water industry. In order to present an objective basis for the merits in terms of cost, an economic evaluation was conducted through life cycle cost analysis. For the LCC analysis, initial cost (pump cost and installation cost), operation cost (energy cost and maintenance cost) and demolition cost (disposal cost and residual value) are searched and calculated. As the results of comparison on two capacity of pumps, the energy cost of the excellent pump is 212 million KRW lower than the that of general pump in the large pump. The cost of excellent pump was 17 million KRW lower than that of general pump in small capacity pump. As the results of sensibility test, if the product is developed in the direction of improving pump efficiency and increasing the replacement cycle of consumables, it is predicted that the effect on LCC will be large.

특집:에너지플랜트 및 핵심기자재 기술 - 위험도 기반 플랜트 안전 설계 기술

  • Choe, Byeong-Il;Kim, Myeong-Bae;Han, Yong-Sik
    • 기계와재료
    • /
    • v.24 no.1
    • /
    • pp.72-79
    • /
    • 2012
  • 최근 미국 멕시코만에서의 대형 오일 누출 사고에서 보듯이 에너지플랜트에서의 사고는 막대한 인명피해, 경제적 피해를 유발한다. 최근 플랜트 설계의 주요 관심사는 플랜트의 생애주기에서 사고에 의한 위험도(RISK)를 적정 수준 아래로 제어하는 것이다. 이를 위해 플랜트 설계 단계에서 필요한 정량적 위험도 분석(Qualitative Risk Assessment) 방법론을 개괄하였다. 아울러 QRA의 핵심이 되는 플랜트 기기 고장률 DB 구축의 필요성을 논하였다.

  • PDF

Economic Evaluation of ATES Heat Pump System (ATES 열펌프 시스템의 경제성 평가)

  • Kim, Namtae;Choi, Jong Min
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.199-199
    • /
    • 2011
  • ATES(Aquifer Thermal Energy Storage) 열펌프 시스템은 기존의 다양한 열원 적용 시스템 대비 효율이 우수한 것으로 알려져 유럽과 미국에서 건물 냉난방 시스템으로 적용되고 있다. 특히, ATES 시스템은 기존의 냉난방 시스템 대비 경제성이 우수한 것으로 알려져 있으나 국내에서는 이에 대한 연구 결과는 전무한 실정이다. 본 연구에서는 ATES 열펌프 시스템의 실증 성능 결과를 분석하였으며, LNG 보일러와 에어컨을 사용하는 기존의 냉난방 시스템을 비교시스템으로 ATES 열펌프 시스템의 경제성 평가를 수행하였다. ATES 시스템의 연간 실증 성능 실험결과 ATES 시스템은 외기온도와 무관하게 연중 안정적인 성능을 나타내었다. 경제성 평가시에 생애주기법(Life Cycle Cost)을 적용하여 ATES 열펌프 시스템의 설치 및 운전에 필요한 총 소요비용을 산정하고, 이 결과를 바탕으로 투자회수기간법을 통해 ATES 시스템의 투자회수 기간을 산정하였다. 생애주기법 적용 시에 현재가치법을 사용하였으며, 현재가치법은 수명주기에 발생하는 모든 투자비용과 절감액을 일정한 시점을 기준으로 등가환산하는 방법을 의미한다. 현재가치법에 사용되는 현재가치는 초기비용과 현재가치계수의 곱으로 나타나는데, 여기에서 현재가치계수는 임의의 이자율로 일정기간 동안 정기적인 할부금액이 적립될 때의 현재금액을 구하기 위해 사용하는 계수를 의미한다. 전기와 LNG는 각각 2009년 7월의 (주)한국전력공사와 (주)한국가스공사의 고시요금을 적용하였다. 본 시스템은 실증 설비용량인 20RT를 대상 건물로 가정하였고, 초기투자비는 크게 공사비와 냉난방 설비 구입비로 구성되어 있으며, 기본적인 물가지표는 (사)한국물가정보(KPI)의 고시 데이터를 참조하였다. 각 시스템의 초기투자비는 ATES 시스템이 비교대상 기존 냉난방 시스템 대비 5.7배 높게 나타났다. 일일 8시간 사용기준으로 계절별 전력요금을 고려한 연간운전 비용은 ATES 시스템이 기존 시스템 대비 냉난방 시에 각각 77%와 16%를 나타내어 운전비용이 연간 절감되었고, 난방 운전 시 절감 비율이 냉방시보다 크게 나타났다. 두 시스템에 대한 생애주기비용을 산정하기 위하여 에어컨과 보일러의 기존시스템과 ATES 시스템의 가용연수를 모두 20년으로 설정하였고, 유지보수 비용은 초기투자비용의 2%로 설정하고, 할인율은 은행 예금이자를 기준으로 5%로 설정하였다. 전기와 LNG의 요금 상승률은 (사)한국물가정보를 바탕으로 각각 2%와 8%로 가정하였다. 이러한 조건에서 생애주기법을 이용한 경제성평가는 ATES 시스템의 경우 생애운전비용이 초기투자비용보다 작게 나타났으며, 기존 냉난방 시스템은 생애운전비용이 초기투자비용에 비하여 높게 나타났다. 본 연구 대상 ATES 열펌프 시스템의 실증 성능 데이터와 기존 문헌으로부터 얻은 냉난방 시스템의 성능 결과를 이용하여 생애주기 비용을 적용한 결과 ATES 시스템의 기존 시스템 대비 투자회수 기간은 6.62년으로 나타났다. 특히, 본 연구에서는 ATES 시스템이 국내 최초로 적용됨에 따라 스크린 등의 부품을 다소 고가의 제품으로 시스템에 적용하였으므로 ATES 시스템의 신뢰성과 안정성이 확보되면 초기 투자비 감소가 가능할 것으로 예상되며, 기존 시스템 대비 투자회수 기간은 더욱 감소될 수 있을 것으로 예상된다.

  • PDF

Economic Analysis of Geothermal Energy Facilities Applied to Public Buildings (공공 건축물 지열에너지설비 적용에 따른 경제성 분석)

  • Jang, Young Jun;Kim, Sangyong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.423-432
    • /
    • 2014
  • The aim of this study to propose an efficient method in selecting the type of new and renewable energy applied in at the planning phase of buildings. This study applied geothermal energy facilities with high adaptability to buildings. This study considered the energy reduction and reduced cost by comparing the values with the energy consumption before applying of geothermal energy facilities. In order to propose more reliable criteria of economic evaluation, maintenance costs reflecting the replacement cycles and initial construction costs by drawings and specifications for installation facilities for practical geothermal energy based on construction statement for life-cycle cost analysis. The results will help to effectively select economic types of facilities for new and renewable energy of the planning phase of buildings.

A Study of renewable energy optimal design using the LCC analysis (LCC분석 기법을 활용한 신재생에너지 최적 설계 방안 연구)

  • Song, Ho-Yeol;Kim, Jeong-Uk
    • Journal of Energy Engineering
    • /
    • v.24 no.2
    • /
    • pp.45-50
    • /
    • 2015
  • In Korea ranking sixth out of The world's greenhouse gas emissions, all Korean public buildings have to implement obligatorily renewable energy systems for energy production to reduce the greenhouse gas emissions from the energy consumed in operation, maintenance and management of buildings. The optimum combination and application rates for each energy source emerge from analyzing the trend of previous studies and the energy consumption is simulated by using a dynamic energy simulation program and the initial investment costs, the energy costs, the maintenance costs, the replacement costs emerge based on the calculated result. The result show that the total life cycle cost of 100% gerthermal is the lowest with \ 2,105,974,344 on the analysis results.