• Title/Summary/Keyword: 생애주기평가

Search Result 208, Processing Time 0.027 seconds

VE/LCC Analysis Models of Breakwaters by Fuzzy Reliability Approach (퍼지 신뢰성 이론에 의한 방파제의 VE/LCC 분석모델)

  • Ahn, Jong-Pil;Park, Ju-Won;Yu, Deog-Chan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.159-167
    • /
    • 2007
  • In this study, the concepts of integrated VE analysis assessment is introduced in order to achieve "Design for Deterioration performance" in design VE phase. For this purpose, a framework for fuzzy reliability based LCC and value analysis model using fuzzy logic based approach for breakwaters Projects is suggested. It is anticipated that the methodology Proposed in this paper can also be utilized in the design and maintenance phase of other facilities where decision making is made for the fuzzy reliability based life cycle cost and value analysis.

Scenario-based Design and Life Cycle Cost Analysis of Energy Supply System for Transportation Sector (도로운송부문용 에너지 공급 시스템 설계 및 경제성평가)

  • Han, Seulki;Kim, Jiyong
    • Korean Chemical Engineering Research
    • /
    • v.53 no.2
    • /
    • pp.164-173
    • /
    • 2015
  • This study aims to design energy supply systems from various energy sources for transportation sectors and comparatively analyze the life cycle cost of different scenario-based systems. For components of the proposed energy supply system, we consider a typical oil refinery, byproduct hydrogen system, renewable energy source (RES)-based electric generation system and existing electricity grid. We also include three types of vehicles in transportation sector such as internal combustion engine vehicle (ICEV), electric vehicle (EV), fuel cell vehicle (FCV). We then develop various energy supply scenarios which consist of such components and evaluate the economic performance of different systems from the viewpoint of life cycle cost. Finally we illustrate the applicability of the proposed framework by conducting the design problem of energy supply systems of Jeju, Korea. As the results of life cycle cost analysis, EV fueled by electricity from grid is the most economically feasible. In addition, we identify key parameters to contribute the total life cycle cost such as fuel cost, vehicle cost, infra cost and maintenance cost using sensitivity analysis.

Economic Analysis of Reinforced Concrete Bridges Considering Performance Evalution (성능평가를 고려한 철근콘크리트교의 경제성 분석)

  • 손용우;정영채;김종길
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.17 no.2
    • /
    • pp.141-150
    • /
    • 2004
  • Recently, it is really concerned about corrosion and aging of reinforced concrete bridges. Corrosional steel reinforcing in concrete affects not only safety of bridges structure but also bending strength of reinforced concrete's member. Rate of corrosion, characteristic of bending strength, and economical evaluation aren't clear in reinforced concrete, considering performance evaluation. The purpose of study is as follows. It studies about ability of resistance's strength and cost of life cycle according to reduction of steel reinforcing's corrosion. Moreover, it shows calculating formula of bending strength with corrosion of current rate and exactly evaluates about the rest life at corrosional reinforced concrete bridges.

An exploratory study for designing research security framework (연구보안 관리체계 설계를 위한 탐색적 연구)

  • Na, Onechul;Chang, Hangbae
    • Convergence Security Journal
    • /
    • v.16 no.2
    • /
    • pp.55-62
    • /
    • 2016
  • Recently, research outcome is frequently leaked in the process of progressing domestic R&D. Security system such as research security law and manual is implemented to prepare these leakage. However piecemeal solutions, simply technological measures, have a limit. Consequently, this study organizes a integrated research security framework by designing multidimensional security measures based on the R&D life cycle perspective. Concretely, this study constructs various control items predicated on law, moreover reviews the applicability of research security assessment items.

Evaluation and Selection of Building Materials based on Life Cycle Cost Prediction (생애주기비용 예측 기반 건물재료 경제성 평가 및 선정)

  • Ahn, Junghwan;Lim, Jinkang;Oh, Minho;Lee, Jaewook
    • Journal of KIBIM
    • /
    • v.5 no.2
    • /
    • pp.34-45
    • /
    • 2015
  • As buildings become larger and more complicated, construction costs have increased with a considerable effect on buildings' Life Cycle Cost (LCC). However, there has been little consideration on economic aspects in the selection of construction materials due to limited information on the materials and dependency in architects' experience and inefficiency in cost estimation, causing design changes, increase in maintenance cost, difficulty in budgeting, and decrease in building performance. To solve these problems, this study proposed a BIM-based material selection model which reflects the comprehensive economic efficiency of building materials. Our cost prediction model can estimates the material-related cost during the entire building life cycle. Furthermore, we implemented the proposed model in connection with BIM, which can analyze and compare LCC by material. Through the validation of the model, we could confirm the necessity of LCC-based material selection in comparison with the conventional cost-centered material selection.

An Uncertainty Analysis of Calculating Life Cycle Maintenance and Energy Costs for Technical Proposals (기술제안입찰을 위한 유지관리 및 에너지 비용 산출방식의 불확실성 분석)

  • Chung, Sung Young;Kim, Sean Hay
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.3-9
    • /
    • 2018
  • Although Life Cycle Cost (LCC) must be evaluated by experts, sometimes it may not allow a sufficient time for even the experienced LCC expert to make rational decisions. Therefore, it often ends with relatively comparing the final numbers. We have broken down 110 technical proposals that are actually bade and accepted for large construction projects, and then have analyzed the uncertainty of Maintenance and Energy (M&E) cost during building life cycle, which turns out be the most volatile factor in uncertainty of LCC. Also we suggest "Value Engineering Index (VEI)" - the reduced M&E cost that is normalized by the reduced first cost. It is analyzed that the most uncertain factors of the M&E cost include repair and replacement term differing from each project, duplicated repair and replacement, non-standard repair items, and site-specific energy cost. Eventually we propose a VEI population with a mean of 1.38 and a standard deviation of 1.19, which is obtained by individually and exclusively applying the uncertain factors of the M&E cost to the 35 standard sample of technical proposals. The LCC evaluators may be able to use the VEI population as the benchmark to select the technical proposal with the most reasonable LCC among many others in two suggested manners; the one is to deterministically calculate the probability of single VEIs, and the other is to stochastically calculate the probability of the VEIs where uncertainty is quantified.

Lifecycle cost assessment of best management practices for diffuse pollution control in Han River Basin (한강수계 비점오염원 저감시설의 생애주기비용 평가)

  • Lee, Soyoung;Maniquiz-Redillas, Marla C.;Lee, Jeong Yong;Mun, Hyunsaing;Kim, Lee-Hyung
    • Journal of Wetlands Research
    • /
    • v.18 no.4
    • /
    • pp.448-455
    • /
    • 2016
  • Diffuse pollution management in Korea initiated by the Ministry of Environment (MOE) resulted to the construction of pilot facilities termed Best Management Practices (BMPs). Twelve BMPs installed for the diffuse pollution management in the Kyung-An Stream were monitored since 2006. Data on the mass loading, removal efficiency, maintenance activities, etc. were gathered and utilized to conduct the evaluation of long-term performance of BMPs. The financial data such as actual construction, design and maintenance cost were also collected to evaluate the lifecycle cost (LCC) of BMPs. In this study, most of the maintenance activity was focused in the aesthetic maintenance that resulted to the annual maintenance cost of the four BMP types was closely similar ranging from 8,483 $/yr for retention pond to 8,888 $/yr infiltration system. The highest LCC were observed in constructed wetland ($418,324) while vegetated system had the lowest LCC ($210,418). LCC of BMPs was not so high as compared with the conventional treatment facility and sewage treatment plant. On the other hand, the relationship of removal efficiency on unit cost for TSS and TN was significant. This study will be used to design the cost effective BMP for diffuse pollution management and become models for LCC analysis.

Safety Management Framework for Information Handover Effectiveness in the Construction Industry (건설 안전관리 개념적 틀 및 정보이양 효율성 분석)

  • JIN, Zhenhui;JUNG, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.50-61
    • /
    • 2020
  • Safety management has been one of the most critical issues in the construction industry for a long time. Despite continuous efforts, it still shows a higher accident rate than other sectors. To reduce the accident rate, a lot of studies have been performed, mostly focused on contractors or construction phase. Although the initial stage of the construction project has the most significant impact on construction safety and decision-makers at the initial stage play an important role, the safety management system throughout the project entire life-cycle is still insufficient. In addition, although a great deal of information is generated in the construction project and the value is increasing, while it shows an inefficient aspect. This is believed to be due to insufficient information exchange and a lack of standards. In this context, this study aims to analyze the efficiency of information handover in construction safety. For this purpose, a safety management framework for systematically and efficiently managing and utilizing for construction safety information is referred to as 'safety business functions', 'project life-cycle', and 'industrial hierarchy'. The 'safety business functions' are classified into three levels. And then, in order to analyze the efficiency of safety information handover, 'importance of safety business function' and 'efficiency of safety information handover' were evaluated by interviewing with experts. This study can be used as reference data for implementing systematical and efficient safety management, and can also increase construction safety competency.

The European Paradigm of Health Investment: Focusing on the Model and Policy Content, and Their Transformation (유럽의 건강투자 패러다임: 모델과 정책 콘텐츠 및 그것의 전환을 중심으로)

  • Park, Seung-Min
    • The Journal of the Korea Contents Association
    • /
    • v.22 no.10
    • /
    • pp.83-92
    • /
    • 2022
  • The purpose of this research is to analyze the European paradigm of health investment and its implication. Conventional content analysis of WHO/EU(/EC)/European countries' policy data, and articles shows that the European paradigm of health investment is consist of the basic and extended models, twelve life-course-based health investment policies, and SROI evaluation method. The analyses and discussion points provide policy implications for making virtuous cycle of Korean sustainable healthcare system with economic development in the post Covid-19 era.

The Research on the Curve of Maintenance Cost from Newly Constructed Steel Box Girder Bridge (최근 가설된 강상자형 교량의 보수.보강 공사비곡선 추정에 관한 연구)

  • Kim, Young-Woo;Shin, Yung-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.553-556
    • /
    • 2009
  • 최근 우리나라의 건설 분야에서는 생애주기비용(Life Cycle Cost;이하 LCC)/가치공학(Value Engineering; 이하 VE)을 적용한 구조물 설계가 실시되고 있다. 이는, 건설교통부에서 공공건설사업의 효율성을 제고하기 위하여 실시하고 있으며, 대통령령에 따라 "건설기술관리법시행령"을 제정하여 공공사업분 수행 절차와 기준을 법제화 하였으며 이후 시행령 38조 13의 "설계의 경제성등 검토" 실시를 의무화하는 시행지침을 작성하여 수행하고 있다. 이러한, LCC/VE의 검토에서 보수 보강 공사비 산정은 유지보수공사 프로파일링을 통한 보수 보강 시기를 산정(건설교통부, 2003)하여 교량 구성요소별 보수 교체 주기를 산정(건설교통부, 2001)에서 제시한 기간을 적용하여 LCC/VE를 평가하고 있다. 하지만, 이러한 보수 보강 공사비의 적용은 일괄적인 적용이며, 예전 국내의 교량 건설기술이 현재와 같이 발전된 상태에서의 현황이 아니므로 본 연구에서는 현재 고속국도에 완공되어 운용중인 교량 구조물을 시설물의 안전관리에 관한 특별법 시행령(2008)에 따른 "시설물의 안전점검 및 정밀안전진단 지침"에 의한 교량의 초기점검, 정밀점검 및 정밀안전진단 자료를 조사 분석하여 보수 보강 공사비 곡선을 추정하려 한다.

  • PDF