• Title/Summary/Keyword: 생산체계

Search Result 2,586, Processing Time 0.032 seconds

A Study on Determining the periodic inspection for Anti-Ship Missile by using Reliability Analysis Model (신뢰도 분석모델을 이용한 대함유도탄 검사주기 결정에 관한 연구)

  • Kim, Dae-Ik;Jeon, Geon-Wook
    • Journal of the military operations research society of Korea
    • /
    • v.32 no.2
    • /
    • pp.92-113
    • /
    • 2006
  • The main purpose of this study is to determine the optimal periodic inspection for Anti-Ship-Missile(Harpoon Block 1) fielding on Korea Navy Ship. In order to perform this study, the data from the Korea Navy (Harpoon maintenance & storage reliability) were collected from 1984 to 2004. Storage failure rate & MTBF for Harpoon block 1 were analysed by using mathematical model & reliability analysis software(Relex) and finally determined optimal periodic inspection. The suggested methodology will be used to determine and reevaluate the periodic inspection of Anti-Ship-Missiles for the Korea Navy.

A Study on the Development of Evaluation Scheme of the National Geographic Information System Policy (국가GIS정책 평가체계 개발방안에 관한 연구)

  • 김태진
    • Spatial Information Research
    • /
    • v.10 no.1
    • /
    • pp.15-27
    • /
    • 2002
  • GIS has recognized as the Social Overhead Capital to improve national competition and to heighterl the productivity of adminstration in 1990's in Korea. As the size and the scope of the NGIS policy have drastically expanded, evaluation has become a critical process. Thus NGIS driving committee has adopted the GIS project evaluation scheme in NGIS law since 2000. But the HGIS evaluation scheme is not sufficient for the comprehensive appraisal on the GIS project in the Second National GIS Master Plan (2001-2005). This research aims to explore an the improved evaluation scheme of NGIS policy.

  • PDF

A Study on How to Improve Local Government Ordinances to Promote Korean Heritage Information Management : Focusing on the relation aspect of Korean Heritage laws and ordinances (국가유산 정보 관리 활성화를 위한 광역자치단체 조례의 개선 방향 연구 : 국가유산 관련 법과 조례의 관계적 성격을 중심으로)

  • GANG Bobae;JOO Sanghun
    • Korean Journal of Heritage: History & Science
    • /
    • v.57 no.3
    • /
    • pp.140-160
    • /
    • 2024
  • The implementation of the "Basic Law on Korean Heritage" on May 17, 2024, brought about significant changes in the operation of Korean heritage-related ordinances in 17 local governments. This study specifically analyzes the production, collection, and information transfer of Korean heritage information between the Korean Heritage Service and local governments, focusing on the provisions of the law. Finally, in order to achieve the goal of revitalizing the management of Korean heritage information, the study suggests five directions for improvement of the local government ordinance from three perspectives. Firstly, in order to systematize the production of Korean heritage information, it is necessary to specify the entities that produce and manage information in Korean heritage, and to select important Korean heritage information from the information produced and manage it strategically. In today's complex Korean heritage management environment, it is impossible to manage all the Korean heritage information produced by various stakeholders. Secondly, in order to systematize the delivery of Korean heritage information, detailed procedures related to the information to be delivered to the Korean Heritage Service should be specified, and a clear plan for information delivery and management between local and basic local governments should be defined. In the Korean heritage information delivery system, local governments play various roles as direct information providers, managers, consumers, and transmitters. Therefore, it is necessary to specify the provisions of the ordinance so that local governments can systematically fulfill their various roles in the Korean heritage information delivery system. Thirdly, in order to activate the production of Korean heritage information, local governments should review the provisions of the Act to ensure that important Korean heritage information generated from directory provisions and non-mandatory provisions, in addition to the mandatory provisions of the Korean Heritage Act, is not omitted. In particular, Korean heritage information is not just administrative information, but also includes specialized information for the maintenance of the current state of Korean heritage. Therefore, if certain Korean heritage information is partially missing, there may be a gap in intergovernmental communication for Korean heritage management.

Decision Making Model for Application of Manufacturing Production System in Construction Project (건설 구조물의 공장생산방식 적용 의사결정모델에 관한 연구)

  • Jin Eui-jae;Park Sang-hyuk;Chae Myung-jin;Han Seung-hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.515-520
    • /
    • 2004
  • Manufacturing Production System (MPS) has been widely accepted in construction area for the productivity improvement. However, the MPS does not always provide cost and time saving. It often caused more delays and increased project cost. Therefore the use of the MPS technique, systematic decision-making process is needed by reviewing various project parameters such as cost and time. This study includes extensive literature reviews and case studies on MPS. As a result, a decision-making model is proposed. The decision-making flowchart and decision-making model are developed in three steps: (1) identification and categorization of decision-making factors; (2) calculations of benefits, cost, and duration in accordance with the location and the production capacity of the factory; (3) comparisons of MPS and on-site assembly by varying the locations and sizes of the factory

  • PDF

Analysis on the Factors Influencing Construction Productivity for Management of Construction Productivity Information (건설 생산성 정보 관리를 위한 생산성 영향요인 분석)

  • Moon, Woo-Kyoung;Han, Sung-Hun;Kim, Yea-Sang;Kim, Young-Suk;Kim, Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.422-426
    • /
    • 2006
  • Productivity is one of the very important index that measures efficiency of production activities in industry, enterprises and the building industry as well. None the less, the concept of construction productivity is not so clear that productivity management in the building industry have been performed by experience or intuition, productivity related data have not been analyzed through effective productivity management, because structured definition and classification of factors influencing construction productivity did not exist so that it has not been known what information explain each of them. In order to solve this problem, at first construction productivity and factors influencing construction productivity are defined and classified into three groups; (1)Project factors influencing construction productivity (2)Management factors influencing construction productivity (3)Activity factors influencing construction productivity. To find out relation between construction productivity and factors influencing construction productivity, a questionnaire survey for construction managers in the building industry has been conducted.

  • PDF

A Study on Structuring the Hybrid Production System of MRP, JIT and OPT (MRP, JIT그리고 OPT의 Hybrid생산시스템 구현에 관한 연구)

  • 조성훈;안동규;임명준
    • Journal of the Korea Society of Computer and Information
    • /
    • v.4 no.1
    • /
    • pp.54-61
    • /
    • 1999
  • The MRP, OPT and JIT systems have the respective limitations to become the suitable production management systems of the future. Therefore it is highly requested to develop an integrated production management system by the hybridization of those production systems. Accordingly, this study has focused its hybrid model using MRP, JIT and OPT. There has been many efforts in comparing and analyzing the usefulness and the limitations of those production systems and applying the usefulness to the maximum which improving and supplementing the weakpoints of respective systems. In this respect, this study develop the hybrid simulation model, and this hybrid model are evaluated and compared with MRP(Push system) and JIT(Pull system) by using a simulation.

  • PDF

Manufacturing Progress with Embodied Technological Change

  • Shin, Dong-Wook
    • Journal of Technology Innovation
    • /
    • v.1 no.1
    • /
    • pp.84-99
    • /
    • 1993
  • 오래도록 생산성향상곡선 (또는 학습곡선), 생산함수, 그리고 대체곡선 등은, 서로 관련이 없는 별개의, 그리고 순전히 경험적인 (empirical) 현상들인 것들로서 이해되어 왔었다. 그러나 1980년대 중반에 발표된 Muth 교수의 탐색이론 (Search Theory)의 생산성향상곡선에서 관찰된 제반현상들을 모두 설명함으로써 이들 현상은 하나의 통합이론체계에 의하여 일관되게 설명되게 되었다. 이 이론의 초기형태는 그 보편성을 구속하는 네 가지 가설 위에 설립되었었으나 점차적으로 이들 가설들이 완화되면서 (relaxed) 이 이론은 또한 해독 력에서 뿐만 아니라 일반성에 있어서도 계속 강화되어 왔다. 본 논문의 목적은, 이들 네 가지 가설들 중 유일하게 아직 완화되지 못하고 있는, 실제 현상과 다분히 유리된, 두 번째 가설, 즉$\ulcorner$생산성향상을 위한 탐색과정에서 새로이 발견된 개량 신기술 (또는 생산방식) 은 즉각적으로 채택될 것$\lrcorner$이라는 가설을 완화함으로써, 보다 현실에 대한 해석력과 일반성 면에서 개선된 모델을 제시하는 데 있다. 이를 위하여 제시된 모델은 Muth 교수의 탐색이론모델에 두가지 변수를 더함으로써 확장하여 만든 모델이다. 이 두 변수는 신기술의 채택 (또는 획득)을 위하여 지불하여야 하는 투자비변수와 탐색과정을 통하여 발견은 되었으나 아직 채택은 되지 않은, 유보상태 신기술의 운영비용 변수(또는 수익성변수)등이다. 이 모델의 내용은, 생산성향상은 신기술이 구현된 (embodied) 장비 (equipment)를 사용함으로써 실현되며, 따라서 창의적 활동의 이득은 이들 장비에 대한 투자행위로서 실현된다는 것이다. 이 모델은 보다 나은 신기술이 또 발견될 것이라는 기대 하에, 현재 발견된 최신기술을 채택하지 않는 투자지연현상을 예측.설명해 주며 따라서 이로 인한 기술적 비효율성의 존재이유를 제시한다. 또한 이 모델은 생산성 향상곡선의 초기굴곡현상, 정체현상, 그리고 도약현상 등을 모두 설명해 준다.

  • PDF

소 체외수정란 생산효율에 미치는 체외성숙 용기와 계절적 영향

  • 서영일;조수진;전세진;이영호;이효상;최유진;윤희준;조성균;공일근
    • Proceedings of the KSAR Conference
    • /
    • 2004.06a
    • /
    • pp.286-286
    • /
    • 2004
  • 본 연구는 체외배양 system에서 체외성숙시 경제적인 수정란 생산체계를 검토하고자 체외성숙 배양 용기와 체외수정란생산 계절에 따른 효율을 비교조사하였다. 우선 저가의 국산 Petri dish (35×12 ㎜; SPL, Korea)와 고가의 4-well dish (Nunc, Denmark)를 체외성숙 용기로 사용하였다. 4-well dish 처리구에는 well 당 500 ㎍ 체외성숙 배양액에 50개의 난자를 배양하였고, Petri dish 처리구에서는 3 ㎖의 체외성숙 배양액에 300개 정도의 oocytes를 넣어 24시간 체외성숙을 유도하였다. (중략)

  • PDF

FMS 투자 타당성 검토 기법에 대한 고찰

  • 이국철
    • Korean Management Science Review
    • /
    • v.4
    • /
    • pp.42-53
    • /
    • 1987
  • FMS는 개별적인 자동화 체계와 기술이 하나의 생산시스템 내에서 통합된 것이므로, 이는 다품종 소량생산 방식에 있어 높은 생산성과 융통성을 동시에 달성하고자 하는 제조시스템이다. FMS와 같은 신제조 기술에 바탕을 둔 공장자동화 시스템을 설치, 운영함에 있어 고유한 생산관리상의 제문제가 발생하며, 특히 막대한 투자비 소요로 인한 경제적 타당성 평가 문제가 FMS 도입상 선결과제로 대두되고 있다. 본 연구는 지금까지 발표된 FMS투자 타당성 검토와 관련된 종합적인 문헌 조사를 행한 후, 이를 크게 "계량요인 위주기법"과 "비계량요인 포함 기법"으로 구분하고, 각 구분에 속한 제 평가 방법들의 특성 및 한계점을 파악하고자 한다. 아울러 FMS 투자타당성 검토 대안으로서 시간적 차원을 달리하는 3단계적 평가 방법을 제시하고자 한다.단계적 평가 방법을 제시하고자 한다.

  • PDF

일주일 양잠과 다회육

  • 양성열
    • Journal of Sericultural and Entomological Science
    • /
    • v.34 no.2
    • /
    • pp.71-74
    • /
    • 1992
  • 우리나라 양잠의 안정적 성장 발전을 위해서는 생산기반의 재정비 및 호당 양잠 규모의 확대가 필요하다고 하는 것은 누구나 다 아는 사실이다. 따라서 이를 위한 생산체계의 획기적인 탈바꿈의 하나로 애누에 공동육을 함으로써 농가에서 누에의 사육기간을 단축하는 것이 시급히 요청된다고 림은 "잠사업이 국제 경쟁력 제고를 위한 기술적 대응방안"에서 주장한 바가 있었다. 1. 전제조건 1) 애누에 공동육이 꼭 이루어져야 한다. 2) 뽕밭 생산성이 저해 받아서는 안 된다. 3) 성력 기계기구 개발 및 지원이 이루어져야 한다. 4) 가장 중요한 것은 잠작안정이다. 5) 각 잠기별 표준관리된 잠종이 공급되어야 한다. 6) 각 수견 시기에 맞추어 고치공판이 이루어져야한다. 2. 누에 사육시간 선정 1) 뽕나무 생리를 감안한 가지뽕 수확법에 따른 누에 사육기간은 춘잠기는 5월 하순부터 6월 중순까지이고 추잠기는 9월 초순부터 하순까지이다. 2) 병충해 방제관리상으로는 하잠 및 초추잠만이 문제점이 있다. 3) 잠작에 따른 사육기간은 춘잠기는 5월 하순부터 6월 중순까지이며 추잠기는 9월 초순부터 중순까지잠작이 양호하다.(중략)

  • PDF