• Title/Summary/Keyword: 사업성 위험요소 평가

Search Result 45, Processing Time 0.027 seconds

A Study on the Optimization Methods of Security Risk Analysis and Management (경비위험 분석 및 관리의 최적화 방안에 관한 연구)

  • Lee, Doo-Suck
    • Korean Security Journal
    • /
    • no.10
    • /
    • pp.189-213
    • /
    • 2005
  • Risk management should be controlled systematically by effectively evaluating and suggesting countermeasures against the various risks which are followed by the change of the society and environment. These days, enterprise risk management became a new trend in the field. The first step in risk analysis is to recognize the risk factors, that is to verify the vulnerabilities of loss in the security facilities. The second step is to consider the probability of loss in assessing the risk factors. And the third step is to evaluate the criticality of loss. The security manager will determine the assessment grades and then the risk levels of each risk factor, on the basis of the result of risk analysis which includes the assessment of vulnerability, the provability of loss and the criticality. It is of great importance to put the result of risk analysis in mathematical statement for a scientific approach to risk management. Using the risk levels gained from the risk analysis, the security manager can develop a comprehensive and supplementary security plan. In planning the risk management measures to prepare against and minimize the loss, insurance is one of the best loss-prevention programs. However, insurance in and of itself is no longer able to meet the security challenges faced by major corporations. The security manager have to consider the cost-effectiveness, to suggest the productive risk management alternatives by using the security files which contains every information about the security matters. Also he/she have to reinforce the company regulations on security and safety, and to execute education repeatedly on security and risk management. Risk management makes the most efficient before-the-loss arrangement for and after-the-loss continuation of a business. So it is very much important to suggest a best cost-effective and realistic alternatives for optimizing risk management above all, and this function should by maintained and developed continuously and repeatedly.

  • PDF

Development of Comprehensive Diagnostic System for Disaster in Decline Areas (쇠퇴지역 재난재해 종합진단 시스템 프로토타입 개발)

  • Shin, Yonghyeon;Lee, Sangmin;Yang, Dongmin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.479-479
    • /
    • 2021
  • 최근 기상이변으로 인한 자연재해 발생이 증가하고 있고, 그에 따라 도시의 재난 대응력 강화가 국내에서는 물론 국제적으로도 중요한 이슈가 되고 있다. 특히 쇠퇴지역은 재난재해 발생 시 인적·물적 피해가 일반 지역 보다 상대적으로 크며, 복구에도 많은 시간과 예산이 소요되므로 대응책 마련을 위한 도시재생지역의 정밀한 재난재해의 위험성 분석 기술이 필요하다. 이에 본 연구에서는 도시재생사업 대상지(311개)에 대한 재난재해 유형별 위험성 및 회복성을 종합적으로 분석하는 종합진단 기법을 개발하고, 이를 적용한 프로토타입 시스템을 개발하였다. 재난재해의 범위는 「재난 및 안전관리 기본법」을 준용하여 이에 도시재생사업 시행에 영향을 받아 재난재해 발생에 따른 위험정도가 변화할 가능성이 높은 자연재해 (폭우, 폭염, 폭설, 강풍, 지진)5종과 사회재난 (화재, 붕괴, 폭발) 3종 총 8종으로 정의하였다. 종합진단 기법은 기후변화에 관한 정부간 협의체(IPCC) 위험도 평가 방법을 준용하여 위험요소 (위해성·취약성·노출성)와 대비·대응요소 (회복성)로 구분하고, 전문가 자문회의를 거쳐 재난재해에 특히 취약한 쇠퇴지역의 특성을 반영할 수 있는 종합진단지수 산정식을 개발하였다. 또한 쇠퇴지역 재난재해 종합진단 시스템은 도시재생 업무를 수행하는 사용자가 신속히 정보를 분석하고 활용에 용이하도록 Web-GIS 기반으로 설계하였으며, 종합진단 기법에 의해 산정된 분석결과를 100m × 100m 격자 단위의 등급으로 가시화한다. 분석 결과는 지속적인 연구 개발을 통해 최적의 도시재생사업 의사결정 지원 서비스를 위한 기초 분석 자료로 연계하여 활용되며, 분석 DB는 클라우드 서비스 기반의 도시재생 데이터 플랫폼을 통해 공유된다.

  • PDF

Risk-based Safety Impact Assessment for Construction Projects (위험도 접근방법에 의한 건설사업 안전영향평가방안에 관한 연구)

  • Choi Hyun-Ho;Jung Pyung-Ki;Seo Jong-Won;Choi Ook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.504-509
    • /
    • 2004
  • Safety assessment of construction projects may be affected by various factors such as types and scale of projects, construction methods, procedure, climactic, and site conditions etc. Presently, in planning and design phases, designers are still often uncertain of their responsibilities, l3i]I information and training of safety. Therefore, designers are still failing to exploit the potential that have to eliminate and reduce risks on site. In this study, the concepts of safety impact assessment is introduced in order to derive the performing design for safety in design phase. For this purpose, a framework for safety impact assessment model using risk-based approach for construction projects is suggested. The suggested model includes of information survey and scenarios, classification of safety impact factors occurred by design and construction, and quantitative estimation of magnitude and frequency. Moreover, the checklist which is enable to identify relationship between safety impact factors and design factors is developed and the methodology of safety impact assessment model using risk-based approach is also proposed.

  • PDF

Improvement for Technology Readiness Assessment with Weighting Method for Defense Acquisition Project (가중치 산출방법을 활용한 획득방안 분석단계의 기술성숙도평가 개선방안)

  • Kim, Mi-Seon;Noh, Eun-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.4
    • /
    • pp.538-544
    • /
    • 2021
  • Technology readiness assessment is a procedure for managing defense project risk factors based on the preemptive identification of technical risks. Under current regulations, technology readiness is determined based on considerations of the ratings of factors itemized on a checklist, whether unsatisfied factors have a fatal impact on the project, and whether countermeasures for unsatisfied factors have been established. However, objective criteria for assessing the impact of unsatisfied factors have not been presented, and thus, at present, the results of technology readiness level determinations are largely subjective. In addition, the importance of questions on the checklist is dependent on individual project characteristics and this is not considered during the assessment process. In this paper, we propose an improved technology readiness assessment procedure that considers the characteristics of each project. Using the proposed procedure, we quantitatively determined the importance of each checklist item using a weighting method. We found the devised procedure improved the reliability and objectivity of technology readiness assessment results. A case analysis of a complex weapons system is presented to demonstrate these improvements.

Study on the Priority of Defense R&D Project for Verifying Weapon Systems Requirement (전력소요 통합검증을 위한 국방 R&D사업 우선순위 선정에 관한 연구)

  • Lee, Ho-Jin;Ahn, Nam-Su
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.5
    • /
    • pp.153-159
    • /
    • 2018
  • In recent years, the development of weapons systems in the field of defense research and development has become increasingly large, complex, and long-term, and so have budgets and the time spans involved. In order to improve this, the Weapon Systems Requirement Verification Committee, which benchmarked the preliminary feasibility of the private sector, was established to verify the appropriateness of requirements, and the necessity and priority of the projects. This research proposes a methodology for analyzing and prioritizing proposed weapons systems for effective and strategic allocation of defense budget funding. First, the evaluation factors that can be used in the defense sector were assessed by analyzing the related fields. We set the weighting of items by using the analytical hierarchy process for technical risk assessment and technical profitability evaluation. After that, we applied the methodology to 32 weapons systems and analyzed the results. In conclusion, through this study, it was possible to analyze profitability dimensions overlooked in the existing methodology.

A case study of wind park development and commercial operation (풍력발전단지 조성 및 운영 사레 연구)

  • Byun, Hyo-In;Cho, Joo-Suk;Ryu, Ji-Yoon;Kim, Doo-Hoon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.292-295
    • /
    • 2006
  • 2005년 말 현재, 국내의 상업운전 중인 풍력발전기는 93.5MW(KPX 2005)에 불과하여 민간의 풍력에너지 개발 참여를 위한 사업타당성 조사에서 상업운전에 이르는 풍력발전단지 개발절차에 대한 사례 연구가 미비하다. 최근 신재생에너지 보급을 위한 정부의 강력한 의지와 맞물려 민간의 대규모 풍력발전단지 개발 계획이 속속 진행되고 있는 여건에서, 국내 최초의 대단위 상업용 풍력발전단지인 영덕풍력발전의 개발 및 운영사례를 통해 국내 풍력발전단지 개발 시 고려사항과 발생 가능한 문제점 및 해결방안을 제시한다.

  • PDF

A Study on the Application of Safety Design based on the Risk of Construction Process (건설공정 위험성 기반 설계안전성 활용 방안 연구)

  • Lee, Hyeon-Sung
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.4
    • /
    • pp.493-501
    • /
    • 2019
  • Purpose: The purpose of this study is to prevent construction safety accidents, and the design safety systems were reviewed. This paper aims to establish as an effective system by looking at the implementation procedures and contents of the design safety review system. Method: We reviewed the purpose and content of the law, accident statistics, etc. for the study. In addition, we looked at the implementation plans for actual construction sites using the 'design safety' assessment process as defined by the Act. Results: We divided it into the data review phase, the risk factor elicitation and alternative setup phase, and the design safety assessment report preparation stage. Conclusion: it is necessary to derive risk factors that take into account the diversity of construction sites. However, the effectiveness of other reports is questioned as they are often copied and written. Therefore, it is necessary to strengthen external verification procedures attended by construction safety experts.

Workflow Procedures and Applications in BIM-based Design for Safety (DfS) (BIM 기반 설계안전성검토의 업무 절차와 활용 방안에 관한 연구)

  • Jaewoong Hwang;Heetaek Yoon;Junhyun Bae;Youngkon Park
    • Land and Housing Review
    • /
    • v.15 no.2
    • /
    • pp.125-137
    • /
    • 2024
  • A conventional Design for Safety (DfS), introduced to eliminate potential hazards in the design phase proactively, has encountered persistent challenges, such as perfunctory risk assessments and hazard identifications based on 2D drawings and inefficient workflow processes. This study proposes a BIM-based approach to Design for Safety (DfS) to address the limitations of conventional methods, aiming to enhance efficiency and achieve practical safety management benefits. The proposed workflow process for BIM-based DfS has been refined and validated for on-site applicability through various case studies, including risk assessments during the design phase and field applications for safety management activities during the construction phase. Specifically, the critical process of risk assessment within the DfS methodology has also been transitioned to a BIM-based approach. This BIM-based risk assessment process has been evaluated through case studies, encompassing safety reviews for structural design, construction equipment operation, and construction methodology with sequence in design projects. Additionally, the proposed BIM-based DfS has demonstrated exceptional on-site applicability and efficiency, as validated by the application of a BIM deliverable embedded in DfS information for CDE-based daily activity briefing, VR-based safety training, AR-based mitigation measures inspections, and other safety management activities in the construction phase.

Improvement and evaluation of flood control safety utilizing a flood risk map - Yeong-Seomjin River Basin - (홍수위험지도를 활용한 치수안전도 방법 개선 및 평가 - 영·섬진강 유역중심으로 -)

  • Eo, Gyu;Lee, Sung Hyun;Lim In Gyu;Lee, Gyu Won;Kim, Ji Sung
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.1
    • /
    • pp.21-33
    • /
    • 2024
  • Recently, the patterns of climate change-induced disasters have become more diverse and extensive. To develop an effective flood control plan, Korea has incorporated the concept of Potential Flood Damage (PFD) into the Long-Term Comprehensive Water Resources Plan to assess flood risk. However, concerns regarding the PFD have prompted numerous studies. Previous research primarily focused on modifying and augmenting the PFD index or introducing new indices. This study aims to enhance the existing flood control safety evaluation method by utilizing a flood risk map that incorporates risk indices, specifically focusing on the Yeong-Seomjin river basin. The study introduces three main evaluation approaches: risk and potential analysis, PFD and flood management level analysis, and flood control safety evaluation. The proposed improved evaluation method is expected to be instrumental in evaluating various flood control safety measures and formulating flood control plans.

The Analysis of Risk Factors for Apartment Remodeling Feasibility Study (공동주택 리모델링 사업성 평가를 위한 위험요소 분석)

  • Lee Teck-Wn;Kim Kyoon-Tai;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.84-92
    • /
    • 2002
  • Recently, apartment-remodeling project is booming since various reconstruction controls are tightened. However, the project has difficulties because management systems used for apartment-remodeling projects are not available. Identifying and analyzing risk factors that are required for risk management, this paper suggests the risk level through paired comparison performed by AHP method and probability assessment for risk level analysis. It is expected that this research will be utilized to minimize the risk of apartment remodeling project and for basic materials to perform the project and helpful to change newly build-oriented construction into sustainable industries. Hereafter using the risk factor analysis data of this paper for this research project, risk management model is considered to be constructed.