• Title/Summary/Keyword: 사업성과관리

Search Result 1,095, Processing Time 0.024 seconds

Research on Performance Measurement of Construction Projects Using Balanced Scorecard (BSC) (균형성과표를 이용한 건설사업 성과측정 구축방향에 관한 연구)

  • Kim Dae-Yeon;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.494-499
    • /
    • 2004
  • The competitiveness of the domestic construction industry is faced with a serious crisis due to the decrease of domestic demands, and is below par with that of developed countries as well as of competing nations. There is a pressing need for a way to overcome this problem and restore competitiveness of the domestic construction industry. Therefore, this research, through real case studies, suggested a method of evaluating construction performance, which eliminates waste factors in each construction phase and maximizes cost saving effects.

  • PDF

A Study on the relation of Risk Management, Partnerships, Business Performance in Supply Chain Management (SCM의 위험관리, 파트너십, 사업성과의 관계 연구)

  • Kim, Chang-Bong;Kwon, Seung-Ha
    • International Commerce and Information Review
    • /
    • v.13 no.3
    • /
    • pp.203-228
    • /
    • 2011
  • In one global industry after another, supply chains are reaching across continents farther and deeper than they have ever been. As a result, global companies are confronting new and more formidable supply chain risks which insurance policies alone cannot overcome. This is especially true in the Korean manufacturing industry, where the integration of Supply Chain Management and Risk Management has become critical among Korean export manufactures. One of the most effective ways to manage supply chain risks is to prevent them from occurrence. First, however, supply chain managers must have the knowledge to identify potential causes of supply chain risks. This paper attempts to contribute to such knowledge by examining the relationships between Risk Management, Business Partnership, and Business Performance among Korean export manufacturers. Our study analysed 105 cases in Korean supply chain management and then developed a structural equation model. From our model we found that Supply Chain Risk Management affects both Business Performance and Business Partnerships among Korean export manufacturers. Our model also revealed that the practice of Risk Management within the Supply Chain of Korean export manufacturing industry is impeded by certain constraints and limitations.

  • PDF

PFI법을 적용한 일본의 ESCO사업

  • 에너지절약전문기업협회
    • The Magazine for Energy Service Companies
    • /
    • s.29
    • /
    • pp.48-61
    • /
    • 2004
  • 최근 일본에서는 ESCO사업에 PFI법을 새로이 적용하고 있다. 성과배분제, 성과보증제에 이어 이 제도를 적용할 경우, 국가 및 공공기관을 대상으로 하는 ESCO사업의 확대 및 자금조달이 한층 유리해질 전망이다. 지난 99년 제정된 PFI(Private Finance Initiative)법(민간자금 등의 활용에 의한 공공시설 등의 정비 등의 촉진에 관한 법률)에 근거한 사업은 ''공공시설 등''에 있어서 건설, 유지관리 운영 등을 민간의 자금, 경영능력 및 기술적 능력을 활용하는 사업방법으로 사업 전체의 리스크관리가 효율적으로 행해지는 것과 설게$\cdot$시공$\cdot$유지관리$\cdot$운영의 전부 또는 일부를 일체적으로 취급하는 것에 의해 사업비용의 절감이 기대되며 질 높은 서비스의 제공이 가능한 제도이다. 이것과 매우 유사한 개념을 가지고 있는 것이 성과보증제에 의한 ESCO사업이다. 민간사업자인 ESCO사업자가 자금을 조달하고 에너지절약 개수공사에 따른 설계$\cdot$시공$\cdot$, 운전$\cdot$유지관리, 계측$\cdot$검증, 에너지절감 보증 등의 서비스를 제공하며, 광열수도비 및 운전$\cdot$유지관리비의 절감분으로 모든 투자와 ESCO사업자의 경비를 지불한다. 또 에너지절감 및 공공의 이익보증을 포함한 퍼포먼스계약이라고 하는 형태를 취하는 것으로 공공 이익의 최대화를 도모함과 동시에 금융기관의 투자 리스크에 관한 우려를 회피할 수도 있다. 또 PFI법 특유의 법제상, 재정상의 조치와 재정상 및 금융상의 지원이라는 배려에 있다. 예를 들면, 국고채무부담행위의 설정, 행정재산 사용료의 무상화 또는 감면, 프로젝트 파이낸싱 등에 의한 자금조달을 고려할 경우에 있어서 담보권의 설정 등에 관한 제도를 합리적으로 정비하는 것이 가능하게 된다. 그 내용의 대강을 살펴본다.

  • PDF

Development of R&D Performance Management System in Disaster and Safety based on the PMS (프로젝트 관리체계 기반 재난안전 R&D 성과관리 체계 구축)

  • Jang, Kwang-Jin;Song, Young-Karb
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.7
    • /
    • pp.153-163
    • /
    • 2018
  • There is insufficient effective management systems to achieve project goalsin disaster and safety R&D. Therefore, to develop an R&D performance management system, this paper develops a R&D performance management matrix based on PMBOK to systematize a process and to enhance efficiency of performance management. Also, this paper identified vulnerable procedures in disaster management by analyzing related laws, work process and performance. Analysis results found that the performance management matrix in disaster management R&D consists of 5 process groups, 7 knowledge areas and 47 processes. Also, the performance of the diffusion knowledge process was evaluated as weak in the present management system. This study defined ITO and developed a data flow diagram for applicationto related work. The suggestions of this study include the related work to enhance R&D performance, contribute to improving diffusion of R&D performance, and enhance the utilization of developed technologies.

SE, CM, EVM 통합을 통한 사업 관리 향상 방안

  • Seok, Yeon-Suk;Gang, Seong-Jin;Park, In-Gyeong;Gwon, Yong-Su
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.1023-1029
    • /
    • 2007
  • 우리는 국가 경쟁력의 한 분야인 사업관리에 있어 계획, 수행, 성과관리, 개선에 최적의 프로세스 보유가 요구된다. 그러나 Project관리체계의 현 실태는 일정관리, 범위관리, 비용관리에 초점을 맞춘 일정관리체계, WBS(Work Breakdown Structure) 및 OBS(Organizational Breakdown Structure)관리, 비용관리체계의 부분 통합 혹은 서로의 연계 정도이다. 본 연구는 최적의 사업관리를 위하여 계약관리에 체계공학을 연계하여 계약 전에 WBS, IMP/IMS(Integrated Master Plan)/(Integratcd Master Schedule), TPM(Technical Performance Measurement) 등의 SEP(Systems Engineering Plan)와 계약 후의 이행을 검증 할 수 있는 과정의 Guideline을 제시하고, IEEE 1220, ANSI/EIA 632 순기 의거 개념설계부터 통합시험에 이르는 체계공학 순기에 따른 비용예측이 가능한 USC(University of Southern CalIfornia) 대학의 COSYSMO (Constructive Systems Engineering Cost ModeI)를 소개하고 적용 가능성을 고찰하며, Project의 전순기에 걸쳐 TPM 혹은 Quality를 비용과 일정에 통합하여 관리하는 PBEV(Performance Based Earned Value)모델을 소개하고 적용 가능성을 제시한다. Project 관리에 있어 System 차원을 강조한 SE(Systems Engineering), 비용예측의 CM(Cost Management), 성과관리를 위한 EVM(Earned Value Management)의 통합은 사업 관리에 역량을 강화하며 경쟁력을 향상 시킬 수 있는 적절한 접근으로 사료된다.

  • PDF

The Structural Relationships of Farm Village Leader's Leadership, Conflict Management between Villagers and Farm Village Business Performance (농촌마을지도자의 리더역량과 주민 간 갈등관리 및 농촌마을 사업성과 간의 구조적 관계)

  • Ahn, Dong-Seop;Lee, Byung-Jun;Jeong, Ahn-Seong
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.3
    • /
    • pp.356-369
    • /
    • 2020
  • Farm village business performance may be influenced by village leader's leadership and conflict management between villagers, so the objective of this study is to analyze the relationships among farm village leader's leadership, conflict management between villagers and farm village business performance. The questionnaire was performed for 376 villagers in Jeollabuk-do Province. The collected data was analyzed by structural equation model and Sobel test. The result shows that farm village leader's leadership such as human-relationship ability, management ability, communication skills, and industrial knowledge ability have statistically significant positive effects on the conflict management between villagers. The conflict management between villagers also showed a statistically significant positive effects on the social and economic performance. The farm village leader's leadership such as human-relationship ability, sensibility·awareness ability, management ability, communication skills, industrial knowledge ability showed no statistically significant effects on the social and economic performance. But, they showed a statistically significant effects on the farm village business performance in indirect manner with the mediating effect of the conflict management between villagers. It is worthwhile that in this study, the effect of village leader's leadership on the conflict management between villagers and farm village business performance was verified, and then, it is meaningful to present the role and importance of farm village leader's leadership.

Analysis on Performance Assessment Framework of Construction Phase for Road Construction Projects (도로건설사업 시공단계 성과평가 프레임워크 연구)

  • Mun, Junbu;Lee, Kangwook;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.801-809
    • /
    • 2023
  • Road construction projects have a long duration so cost overruns and schedule delays are occurred. However, performance assessment system that can manage and prepare for this in advance is insufficient. In addition, road construction are affected by many factors during under construction. Therefore it is necessary to conduct performance assessment considering the characteristics of roads and prepare for similar projects in the future. The purpose of this study is to provide a framework to evaluate construction phase performance and present a performance management plan using road construction information. Also, This study conducted time adjustment between the start and the finish of the project and developed performance metrics based on absolute and relative indicator. This study analyzed the cost, schedule, and changes of the road project construction process, showing the possibility of advancement of performance assessment and how to use it when planning new road construction projects.

The Process Development and Application of the Contingency Management by the Performance Analysis (성과분석을 통한 건설공사 예비비 관리 프로세스 및 적용)

  • Lee, Man-Hee;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.84-92
    • /
    • 2007
  • To reduce uncertainties and make rational plans, the presumption of contingency against a failure of projects and an occurrence of unpredictable risks is important with accurate estimations as the work progressing. Therefore, if the presumption of contingency reflecting uncertainties carries out at a decision making point of time, be able to prepare for risks. The purpose of this paper is to present a management process of contingency through the performance analysis of project. In the cost planning phase, this study offers a process which is predictable contingency and predicts the range of fluctuation of the cost, laking an advantage of EVM in construction phase. With reflecting the results from this procedure, this study presents a process, rationally manageable contingency.

A Study on the Construction of the Effective Management and Service of the National R&D Outcome Information (국가 R&D 성과정보의 효율적인 관리 및 유통체제 구축에 관한 연구)

  • You, Beom-Jong
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.37 no.4
    • /
    • pp.223-240
    • /
    • 2003
  • The process of managing the results of national R&D projects, which are aimed at strengthening national competitiveness has been ineffective so far. The existing structure for managing the results of national R&D projects have largely been relying on just strong and managing the result of each project and not on the utilization and expansion of the results for further application. We aim at developing a system that would exceed the current system which heavily relies on a passive paradigm of management and circulation of technology. Through the newly developed system, we look forward to achieve the major goals of R&D, such as cutting down the expenses, increasing the margin improving the technology and expanding the influence of the research to other areas from through improving the system as well as the process for managing R&D projects.