• Title/Summary/Keyword: 사업선정절차

Search Result 115, Processing Time 0.028 seconds

The Activation and Participation Intention Factors for the Citizen Participation Budgeting System -Focused on the Citizen Participation Budget Committee Survey- (주민참여예산제도 활성화 및 참여의사에 미치는 영향요인 -주민참여예산제도 참여위원의 인식조사를 중심으로-)

  • Kim, Kyung-Bum;Hyun, Sung-Wook
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.6
    • /
    • pp.589-600
    • /
    • 2016
  • The purpose of this study was to identify the influence factors on understanding the financial structure and activating of citizen participation budgeting system, which is implemented local governments. And Identify the factors that will influence participation intention of citizen participation budgeting system The activating citizen participation factors previously classified as sub-factors in the Edbon & Flanklin's(2006) design of the budget process was constituted independent variables to accomplish research purpose. the results were as follows in summary. First, The significant affecting variables for activating the citizen participation budgeting system were found to the policy perception, the committee representation, the fairness of the selection process, the budget project adequacy for regional development, the methods of budget allocation. Second, The significant affecting variables for understanding financial structure were found to the policy perception, the committee representation, the fairness of the selection process, the guidelines given by the local government. Finally, The Activating citizen participation budgeting system and understanding financial structure also showed the significant variables to the participation intention. However, It was the Limitation of this study that it's results did't represent all regions because of operating citizen participation budgeting system in Jeju.

A Method of Sampling and Validation for Source Selection and Technical Evaluation Indicators in Public Sector (공공IT제안서 기술 평가지표의 추출 및 검증 기법)

  • Kim, Jung-Kyu;Kim, Sang-Il;Rhew, Sung-Yul
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2011.01a
    • /
    • pp.203-206
    • /
    • 2011
  • 공개 경쟁에 의한 제안 업체 선정과 객관적이고 공정한 제안서의 평가는 공공IT 부문에 있어서 성공적인 사업 수행을 위한 필수요소이다. '소프트웨어 기술성 평가기준 적용 가이드'에서는 소프트웨어 기술성 평가기준을 적용하는데 필요한 절차와 단계별 적용방법 및 세부내용 해설과 평가척도 예시를 제시하여 활용이 가능하도록 하였다. 그러나 기술성을 평가하기 위한 평가부문별 평가항목 및 평가기준에 대한 부분이 구체적이지 않아 경쟁력 있는 제안 업체의 기술성을 정확하고 공정하게 평가하는데 어려움이 있다. 따라서 본 연구에서는 제안 업체의 기술성을 정확하게 평가하기 위하여 평가요소 중에서 기술 평가요소에 대한 부분을 평가지표로 선정하고 통계 기법으로 평가지표를 검증하는 방법을 제시하고자 한다.

  • PDF

소음. 진동 피해진단 기술 정립방향

  • 백용진;이중선;배동명
    • Journal of KSNVE
    • /
    • v.7 no.2
    • /
    • pp.189-198
    • /
    • 1997
  • 현재 행해지고 있는 환경 기술자에 의한 공해성 환경영향평가와 택지조성사업, 터널공사, 각종 도로공사, 건물 해체 작업시 이루어지는 발파 기술자에 의한 발파 영향평가 및 토목. 건축 기술자들에 의해 시공현장에서 주로 행해지는 기타 건설 소음. 진동 영향평가는 진단 개념에서 볼 때, 측정목적과 측정대상에 따른 각종 기준적용과 측정방법 및 분석절차 상에서 몇가지 문제점을 안고 있으며 실제 현장 계측시에도 측정위치 선정, 센서부착 방법, 측정 횟수 및 측정 모드 선정 등에서 상당한 오류를 범하는 것을 종종 볼 수 있다. 따라서 본 연구에서는 각종 소음. 진동 영향평가의 현실태 및 피해 대상물에 대한 진단시 우려되는 기준 적용, 측정 및 분석상의 문제점들을 조사하고 개선방안을 살펴봄으로써 소음. 진동 피해진단 기술을 정립하고 향후과제에 대해 논의하고자 한다.

  • PDF

Value Management of Private Finance Initiative Projects (민간투자사업을 위한 VE 적용방안)

  • Lim, Jong-Kwon;Kim, Seoung-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.123-130
    • /
    • 2006
  • Recently, Korean government promotes BTL(Build-Transfer-Lease) for their public construction project to apply private sector's experience and finance initiatives. Many of public buildings and civil infrastructure projects were planned to be delivered by BTL and it helps to continue public projects under tight budget conditions. Since the characteristics of BTL projects, creative ideas for the project function, performance and its LCC (Life Cycle Cost) become more important than usual public work project. This paper introduces the systematic "VE job Plan" application techniques for BTL project and shows the process. This study shows the application of "VE job Plan" for BTL project to help decision making and value improvement. Also, Project cost was estimated by LCC (Life Cycle Cost) analysis. Technical "FAST diagram"was developed and used to find major functions of the project. So, it helps to improve performance of functions and make creative ideas. FAST diagram also help to find relationships between functions and cost. A case study (Daegu Art Gallery BTL Project) was conducted using proposed "VE job Plan. Study demonstrates how value management helps save money and increase functional performance. Researcher found that project can save cost and improve performance of functions significantly by using appropriate VE analysis process at appropriate time.

  • PDF

Implementation Strategy of Integrated Information Management System of University Financial Support Project

  • Lee, Hae-Gun;Shin, Seong-Yoon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.10
    • /
    • pp.243-249
    • /
    • 2019
  • In this paper, we proposes a comprehensive analysis of the characteristics, selection procedures, and management perspectives of each university's financial support project, and derivation of a plan to integrate the information system of the university's financial support project. To this end, we analyze the current status of business operations before and after restructuring university financial support projects, and identified the characteristics, commonalities, and differences of each project. Individual projects are promoted segmentally, evaluation indicators and evaluation methods are different for each business, standardization is difficult, and in the absence of integrated governance, sympathy and will of the system integration of the government and the managing agency cannot be found. In order to integrate the system, the business management process must be integrated and standardized, and the system equipment such as budget category adjustment must be complemented, and a stable budget for system integration must be secured.

A Study on Trend of Technology Development for Part Localization of Weapon System through Patent Information (특허정보를 이용한 무기체계 부품국산화 개발기술 동향조사 및 분석)

  • Kim, Sung-Kyu;Choi, Chung-Seok;Choi, Yoon-Hyeok;Kim, Jin-Ha
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.6
    • /
    • pp.524-533
    • /
    • 2021
  • Recently, due to the increasing necessity of developing core parts for weapons systems, the project for localization of parts for weapons systems is expanding. In order to apply the developed core parts to the domestic weapon system and advance into the overseas market, it is necessary to plan a project that reflects the technology trends in advance. This study derived trend of technology development through conducting the patent research and analysis. Also, suggested plan for applying the analysis results when project planning and selecting. As a detailed method, patents related to the 2019 year selection project were investigated. The number of patent applications by year and number of applicants from the time of the first application to the present were analyzed. And the growth stage of the technology market was derived. The comprehensive result was derieved through the portfolio analysis by arranging the parts localization technology in each area of the matrix consisting of market growth stage and the criteria for the selection of parts localization project. This research suggested the applying plan for improving project selection process. we expect the promotion of defense industry and the effective task planning.

The Analysis of the Importance of Influencing Factors in the Planning Stage of the Long-Term Public Rental Housing of Remodeling Project (장기공공임대주택 리모델링 사업의 기획단계 영향요인 중요도 분석)

  • Jung, Yong-Chan;Jin, Zheng-Xun;Hyun, Chang-Taek;Lee, Sanghoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.3-16
    • /
    • 2024
  • The government announced the Housing Welfare Roadmap (November 2017), to expand the supply of public rental housing by reconstructing aged long-term public rental complexes. Also, remodeling projects for complexes with low business feasibility of reconstruction projects are recognized as an alternative to supplying public rental housing in urban area. This study analyzed influence factors by dividing them into project feasibility, architectural plan, urban & residential environment plan, and legal system groups in order to establish a plan for long-term public rental housing remodeling project. Futhermore, this work conducted the principal component analysis to get the principal component factors among the influence factors of each group, and the weight analysis to calculate weighting of them. In addition, major influence factors were derived by calculating the relative importance score (RIS) of each factor. Lastly this paper validated the major influence factors and applicability of the procedure to select 3 complexes that can be reviewed for remolding project among 33 long-term public rental housing complexes located in Seoul. The results of this study are expected to be useful when establishing a remodeling project plan for long-term public rental housing.

Improvement of NIMBY Facilities Route Planning Considering Social Conflict (사회적 갈등을 고려한 비선호시설 노선 선정 개선 연구)

  • Choi, Younguk;Lee, Changjun;Han, Seung Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.3
    • /
    • pp.487-496
    • /
    • 2018
  • In route selection process of NIMBY facilities, many conflicts occur due to route selection procedure and NIMBY syndrome. Especially, the social conflicts surrounding the site selection and operation are frequent enough to account for 70% of the total conflict cases, causing significant losses. To resolve the conflict in route selection, social conflicts are considered. Therefore, this study proposes an improved process of selecting route considering social conflicts in the power transmission line. First, the analysis of previous research trends and interviews with experts revealed the improved exclusion zone criteria, the factors and priorities of NIMBY facilities. After selecting the candidate routes, the optimal route is selected by using Fuzzy-TOPSIS. Hence, 83.3% of six experts have verified that this model minimizes conflicts and has sufficient applicability. The proposed model is expected to be used as a tool to minimize social conflict in the selection process of the power transmission line in the early stage of the project.

A Study on the Application of District Unit Planning Techniques to Activate Efficient Urban Regeneration (효율적 도시재생 활성화를 위한 지구단위계획기법 적용에 관한 연구)

  • Kang, Tae-Ho;Yang, Jeong-Cheol;Hwang, Kyung-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.3
    • /
    • pp.545-555
    • /
    • 2020
  • The purpose of this study is to derive the linkage between urban regeneration and district unit planning, in order to supplement the limitations of the spread of the effects of individual urban regeneration projects. To this end, institutional changes and previous studies with theoretical backgrounds were reviewed, the urban regeneration strategic plan and district unit plan cases in the spatial scope of Jeju Island were analyzed, and a unified administrative procedure to strengthen linkages was proposed. In addition, when selecting priorities for active regions, we reviewed how to use the indicators of involvement of residents, which enabled the project to be performed smoothly by grasping the participation of residents and the elements of complaints. Also a hypothetical target site was set up and suggested how to establish a district unit plan by type. Depending on the circumstances and environment of the site, the use of the land use plan and the regulation and mitigation of the district unit plan may be appropriately used to expect the inhabitants to expand their participation and revitalization. This study suggests ways to revitalize decayed areas beyond systematic urban planning in connection with systematic plans, to improve administrative procedures, and to promote bottom-up projects.

A Study on Production and Digitalization of Thematic Maps (주제도 수치지도 제작방법에 관한 연구)

  • 김영표;조윤숙
    • Spatial Information Research
    • /
    • v.6 no.1
    • /
    • pp.103-120
    • /
    • 1998
  • "The Plan for the Development of the National Geographic Information System" designates the following six major thematic maps as the main subject of digital mapping project: topographic-cadastral maps; administrative boundary maps; land use maps; road network maps; national land zoning maps; and urban planning maps. Carrying out the digital mapping project requires standards and guidelines for digitizing process. However, there is neither standards nor guidelines with regard to thematic map production. This study describes the steps involved in producing thematic maps and provides the best procedural alternative for the production of thematic maps. Based on procedural alternative suggested by this study, actual digital maps have been experimentally produced for the selected area, Anyang-Si Dongan-Gu. The results of this experimental work have been utilized to government for not only making the guidelines but also initiating plans for the development of thematic map production.roduction.

  • PDF