• Title/Summary/Keyword: 사업비관리

Search Result 1,144, Processing Time 0.026 seconds

An Empirical Study on the Effect of public Construction Industry by Expansion of New Budget System (계속비 사업 확대로 인한 공공건설사업 파급효과 분석)

  • Kim, Sang-Bum;Lee, Jeong-Dae;Cho, Ji-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.153-163
    • /
    • 2008
  • Domestic construction industry accounts about 15% of Gross Domestic Product(GDP) and Korean government spends approximately 50 trillion won per year for public infrastructure projects. Effective management of public construction projects would result in cost saving and enhance financial stability of the government. In doing so, the government promoted a new budgeting system, Continual Budget Method(CBM) as a part of public project performance enhancement program published in 1999. This research mainly attempted to investigate and analyze the impact of new budgeting in term of cost and schedule performance. Based on the analysis result of n2 projects. The new budgeting system could save project cost by 9.83y. Due to the saving of indirect costs from reduction. Although limited government budget cannot allow all the projects to be excuted with the new budgeting system, the new budgeting system should be more-widely utilized in the public sector because of its proven benefits from this research.

A Study on the Knowledge Base Construction of Expert System for S/W Project Management (소프트웨어 사업관리 지원용 전문가시스템의 지식베이스 구축에 관한 연구)

  • 김화수;최병권
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2000.11a
    • /
    • pp.397-406
    • /
    • 2000
  • 대부분의 국방정보시스템의 소프트웨어는 높은 가용성, 신뢰성, 신속성, 정확성 등을 요구하는 대규모이면서 복잡한 실시간 시스템이다. 이러한 국방정보시스템의 소프트웨어 개발사업에 있어서 저비용 고효율의 미개국방경영 건설을 위하고 강한 전투력을 육성하기 위해서는 국방정보시스템의 효율적인 소프트웨어 개발사법이 요구된다. 따라서, 국방정보시스템의 소프트웨어 사업관리자가 개발사업을 관리하고 감독하는데 있어서 개발자와 사용자간의 조정 및 통제 기능을 수행하고 해당 국방정보시스템의 특성을 파악하여 성공적인 사업수행을 할 수 있도록 기술적인 사업관리 측면에서 구체적이고 상세화된 방안/지침을 제공하기 위한 전문가시스템의 지식베이스 도메인 지식개발에 관한 연구이다. 기존의 국방정보시스템의 사업관리자가 경험을 동해 축적해 온 기술, 정책, 아이디어, 노하우 등에 대한 지식을 습득하고 사업 관련자료에서 제시한 소프트웨어 생명주기 단계별 방안이나 지침 등을 바탕으로 하여 식별된 사실이나 내용을 지식베이스로 구축하여 국방정보시스템의 사업관리자가 필요로 할 때 설명모듈을 거쳐 임무 및 세부활동사항을 게시하여 줌으로써 사업관리 경험이 부족하거나 사업관리자가 교체되었을 때 사업관리자들이 업무를 지속적으로 연계시켜 임무수행이 가능하도록 기초/기반 여건을 제공하고자 한다. 본 논문은 국방정보시스템의 소프트웨어 개발사업에서 소프트웨어 생명주기 단계별 사업관리자의 임무 및 세부활동사항 지원용 전문가시스템을 개발할 때 이용할 수 있도록 도메인 지식을 개발하는 것이며 논문의 결과를 활용시 기대되는 효과는 본문을 참고 바란다.의 장점을 취합하여 설계되었다. 본 시스템은 기존의 UN/EDIFACT표준을 사용하고 있는 EDI환경과 기존 VAN 방식의 EDI 중계 시스템과 연동되며, 향후 관세청의 XML/EDI 표준 시행을 미리 대비하는 선도연구로서 자리매김이 된다. 본 연구에서는 개발된 XML/EDI 통관시스템은 향후, 서비스의 최대 걸림돌이 되어왔던 값비싼 EDI 사용료의 부담에서 벗어날 수 있게 할 것이며, 저렴한 EDI구축/운영 비용으로 전자문서교환의 활성화와 XML이 인터넷 기반의 문서유통 표준으로 자리매김할 수 있는 중요한 계기가 될 것이다.재무/비재무적 지표를 고려한 인공신경망기법의 예측적중률이 높은 것으로 나타났다. 즉, 로지스틱회귀 분석의 재무적 지표모형은 훈련, 시험용이 84.45%, 85.10%인 반면, 재무/비재무적 지표모형은 84.45%, 85.08%로서 거의 동일한 예측적중률을 가졌으나 인공신경망기법 분석에서는 재무적 지표모형이 92.23%, 85.10%인 반면, 재무/비재무적 지표모형에서는 91.12%, 88.06%로서 향상된 예측적중률을 나타내었다.ting LMS according to increasing the step-size parameter $\mu$ in the experimentally computed. learning curve. Also we find that convergence speed of proposed algorithm is increased by (B+1) time proportional to B which B is

  • PDF

ITROI Case Of Ministry of Maritime Affairs and Fisheries (해양수산부 IT투자성과관리체계 구축 사례)

  • Kang, Jea-Hwa;Lee, Mun-Gyu
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.91-96
    • /
    • 2006
  • 최근 몇 년 사이 정부 내의 정보화 사업규모는 기하급수적으로 증가하고 있다. 국민의 정부시절 약 2,400억 규모의 정보화 예산이 참여정부에서는 약 9500억으로 증가한 사실이 이를 반증하는 증거이다. 그러나, 이러한 정보화 사업에 대한 투자규모에 비하여, 막대한 예산을 들여 진행되는 사업에 대한 지속적인 성과관리는 체계적으로 진행되지 않은 현실이다. 오히려 성과관리라는 것이 사업의 추진을 방해하는 부정적인 요소로 인식되기도 한다. 하지만, 정보화 사업에 대한 성과관리의 부재는 장기적으로 조직의 전략목표와 정보서비스와의 GAP을 심화시켰고, 결과적으로 막대학 IT 투자 전체에 대한 회의감만을 대두시키는 결과를 가져 왔다. 2006년 IT최대의 화두인 IT거버넌스 개념 역시 IT와 비즈니스의 GAP을 줄여 IT 서비스가 조직의 목표와 전략을 올바르게 지원하도록 IT운영을 하자는 것이 핵심사상이다. 이러한 IT거버넌스 실현의 중심에 IT 투자성과관리체계가 있다. 해양수산부는 IT투자성과관리체계구축을 통하여 정보화사업 전체 프로세스를 지원하며, 각 단계별 이력관리를 통해 매년 사업 담당자가 바뀌는 상황에서도 안정적인 사업의 추진이 가능하도록 하였으며, 각 사업에 대한 평가지표개발 및 평가체계 구축을 통해 사업계획, 시행, 종료 단계에서 과학적인 정보화 사업의 투자성과평가를 지원하는 체계를 마련하였다. 이러한 IT투자성과관리체계는 기 구축된 ITA, ITAMS, IT자산관리체계와 연동하여 해양수산부 IT거버넌스 실현에 이바지 할 것으로 기대된다.

  • PDF

Approximate Estimating Model Using the Case Based Reasoning - PSC BEAM Bridge - (사례기반추론을 이용한 개략공사비 산정모델 개발 - PSC BEAM교를 중심으로 -)

  • Kang, Chan-Sung;Lee, Geon-Hee;Kim, Kyoung-Min;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.445-448
    • /
    • 2008
  • This study attempts to estimate approximate cost on construction of PSC BEAM Bridge using Case-Based Reasoning and suggests approximate estimation model at the planning and design stage. This paper suggests phased influence factors on construction cost and approximate estimation model for integrated project cost management.

  • PDF

Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project - (건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 -)

  • Kim, Soo-Min;Cho, Jae-Ho;Lee, Jong-Sik;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.212-215
    • /
    • 2008
  • When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.

  • PDF

Configuration Management System for Multi-Component Development (다품종부품 개발을 위한 형상관리 체계)

  • Kim, Sung-Chan;Oh, Hae-Soon;Lee, Sang-Wook
    • Proceedings of the KAIS Fall Conference
    • /
    • 2011.12b
    • /
    • pp.499-502
    • /
    • 2011
  • 중형급 회전익 항공기는 약 5,000여종의 주요기능 부품이 사용된다. 이들 주요 기능부품은 항공기에 장착되기 위해 최적화설계로 목표중량을 달성하고, 요구성능을 상회하여야 한다. 따라서 항공기 기능부품은 개발비를 제외하고도, 동종의 자동차 부품에 비해 약 100배 이상의 양산 단가 구조과 막대한 개발비가 소요된다. 이와 같은 구성품 개발에 있어 개발비를 절감하는 기술관리 수단중 하나가 형상관리이며, 형상관리 체계의 수립은 사업의 성패에 중요요인으로 작용하고, 군사규격에 의거 항공분야 개발사업의 형상관리체계 수립이 요구된다. 본 연구에서는 다양한 민군겸용 구성품 국산화 개발에 적합한 형상관리 체계를 제안하고, 제안된 형상관리 체제를 구축 운용하여, 성공적인 민군겸용 구성품 형상관리가 수행되었음을 확인하였다.

  • PDF

A Development of the Design modification function for road construction project Cost management (도로분야 공사비정보 관리를 위한 설계변경 기능 개발)

  • Moon, Jin-Seok;Yoon, Hoi-Su;Kim, Sung-Jin;Han, Choong-Han
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2012.06b
    • /
    • pp.16-17
    • /
    • 2012
  • 국토해양부는 지방국토관리청의 도로공사와 관련하여 발생하는 공사비 정보의 교환 및 공유를 목적으로 작업분류체계 기반의 공사비 관리 항목을 추가하여 전자설계도서 작성 납품 지침을 개정하였다. 이를 반영하고 문제점 개선 및 활성화를 위하여 5개 지방국토관리청에서 관리중인 10개 도로건설공사를 시범적용 사업으로 지정하여 발생하는 공사비 정보를 디지털 수량산출정보로 관리하고 있다. 시범사업을 진행하면서 건설공사에 발생하는 설계변경 업무를 전자화하여 관리하는 기능을 개발하고 추가 적용하였다. 이를 통해 건설사에서 생성한 설계변경 정보를 건설사와 발주처가 동일한 형태로 공사비 정보를 공유 및 관리 가능하도록 하였다.

Construction present state managerial system specification and implementation based on the WBIS (WBIS를 이용한 건설공사현황관리시스템 설계 및 구현)

  • 김남곤;강의석;서명배
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.10b
    • /
    • pp.397-399
    • /
    • 2003
  • 각 관공서나 공공기관에서 발생되는 각종 공사현황정보와 기술정보를 시설물 전체 수명주기동안 제대로 활용하기 위해서는 시설공사관리 업무를 전자처리체계로 전환하는 것이 시급하며, 사업계획에서 준공까지 일련의 과정에서 발생하는 문서들의 보관이 비체계적이므로 이를 잘 보관하고 재 사용하기 위한 관리체계가 필요하다. 따라서 본 연구는 공공건설분야를 담당하고 있는 지방국토관리청을 대상으로 사업단위별로 업무를 7가지로 세분화하고. 그 중에서도 핵심부분인 공공건설사업에 대한 체계적이고 효과적인 관리체계를 유지할 수 있는 웹 기반의 공사현황 정보시스템을 제안한다.

  • PDF

Risk Analysis of Highway Investment by Private Sectors (민자유치대상고속도로 투자의 위험도분석)

  • 이용택;김상범;원제무
    • Journal of Korean Society of Transportation
    • /
    • v.17 no.5
    • /
    • pp.33-42
    • /
    • 1999
  • 본 논문은 도로투자 사업성분석시 사업주체의 현금흐름을 결정하는 항목들을 고정값(Deterministic Value)이 아닌 확률적으로 추정함으로써, 사업의 재무적 변동으로 인한 위험도를 민간사업자의 견지에서 사업성분석과정에 내재화하는 모형을 개발하는 것이다. 즉, 확률적 비용추정기법으로 국소적으로 활용되던 위험도분석을 재무모형에 내재화함으로써 사업의 재무적 변동을 보다 포괄적으로 분석할 수 있는 틀을 제공한다. 본 연구에서는 몬테카를로 시뮬레이션기법을 이용한 위험도분석(Risk Analysis)을 적용하여 사업성 평가지표와 비용의 확률밀도함수(Probability Density Function : PDF), 누적확률분포함수(Cumulative Distribution Function : CDF)를 산출하고, 그 결과로 해당 사업의 위험도를 고려하여 사업성을 평가한다. 이 모형은 사업의 모든 변동요인을 복합적으로 추정하여 사업기간 내 사업주체의 현금흐름을 분석할 수 있다. 따라서 사업주체는 효용에 따라 합리적인 위험도 관리 목표값(Target Value)을 선정하고, 사업의 위험도를 고려하여 건설비, 예비비를 결정할 수 있다. 본 연구에서 정립된 모형을 서울외곽순환고속도로(일산-퇴계원 구간)와 대전당진고속도로를 대상으로 사례분석을 수행하였다. 그 결과, 대전당진고속도로의 경우 사업성이 없으며, 서울외곽순환고속도로의 경우, 일부 위험도 발생변수를 합리적으로 관리한다면, 사업성이 충분한 것으로 분석되었다. 본 사례분석은 사업의 위험도를 반영한 사업성분석 방법으로 우리나라 민자유치대상고속도로의 사업성분석의 하나의 지침이 될 것이다.

  • PDF