• Title/Summary/Keyword: 사업관리체계

Search Result 1,537, Processing Time 0.028 seconds

형상관리

  • Kim, Han-Gyeong;An, Yu-Hwan;No, Jang-Rae
    • ETRI Journal
    • /
    • v.8 no.2
    • /
    • pp.124-134
    • /
    • 1986
  • TDX의 연구개발, 생산 및 운용중에 적용되는 형상관리 체계 확립은 요구 사항의 제기와 그 적용에 이르기까지의 정보 흐름이 복잡하기 때문에 시스팀 제품관리와 사업관리 관점에서의 많은 문제 해결을 전제로 한다. 본고는 TDX형상관리에 필요한 사항을 제시하고, TDX형상관리를 적합하게 구성하는 방식으로 서술한다.

  • PDF

Standardization of the Work Classification System in Spatial Data Construction - Laying Stress on the Basic Surveying - (공간데이터 구축의 공종분류체계 표준화 - 기본측량을 중심으로 -)

  • Choi, Byoung-Gil;Cho, Kwang-Hee;Kim, Sung-Soo
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.2 s.36
    • /
    • pp.69-75
    • /
    • 2006
  • This study aims to standardize the work classification system in spatial data. It is the base frame to classify the general information systematically in spatial data construction process. Work process of the surveying firm and rules for basic surveying which is being accomplished in the NGII(National Geographic Information Institute) are investigated and analysed. Therefore, types, individual process, and results of surveying work is standardized. If the work classification system from this study is adopted as the national standard and is also advanced by construction methodology, the spatial data will be managed futuristically and systematically.

  • PDF

Safety Management Framework for Information Handover Effectiveness in the Construction Industry (건설 안전관리 개념적 틀 및 정보이양 효율성 분석)

  • JIN, Zhenhui;JUNG, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.50-61
    • /
    • 2020
  • Safety management has been one of the most critical issues in the construction industry for a long time. Despite continuous efforts, it still shows a higher accident rate than other sectors. To reduce the accident rate, a lot of studies have been performed, mostly focused on contractors or construction phase. Although the initial stage of the construction project has the most significant impact on construction safety and decision-makers at the initial stage play an important role, the safety management system throughout the project entire life-cycle is still insufficient. In addition, although a great deal of information is generated in the construction project and the value is increasing, while it shows an inefficient aspect. This is believed to be due to insufficient information exchange and a lack of standards. In this context, this study aims to analyze the efficiency of information handover in construction safety. For this purpose, a safety management framework for systematically and efficiently managing and utilizing for construction safety information is referred to as 'safety business functions', 'project life-cycle', and 'industrial hierarchy'. The 'safety business functions' are classified into three levels. And then, in order to analyze the efficiency of safety information handover, 'importance of safety business function' and 'efficiency of safety information handover' were evaluated by interviewing with experts. This study can be used as reference data for implementing systematical and efficient safety management, and can also increase construction safety competency.

A Case Study of Improving EA Updating by Connecting PMS (PMS 연계를 통한 EA 현행화 개선 사례 연구: 국토해양부 정보화프로젝트 관리시스템을 중심으로)

  • Kang, Jae-Hwa;Kim, Seung-Kwan
    • Journal of Information Technology and Architecture
    • /
    • v.9 no.4
    • /
    • pp.423-432
    • /
    • 2012
  • EA (Enterprise Architecture) is an SI (System Integration) approach, i.e., a comprehensive plan for SI, which shows the elements of SI and the relationships among them. Since EA can be utilized in every stages of SI, the more large-scaled and complicated SI projects are, the more important EA is. Although many central government agencies and wide local governments implemented EA, the current level of EA utilization is still low. One of the reasons is the low level of EA updating. Some reasons of the low level of EA updating are the low frequency of EA updating, and the shortage of workers, as well. In order to improve the frequency of EA updating and alleviate the workloads of SI officers, MLTM (Ministry of land, transport, and maritime affairs) standardized the processes and documents for SI projects, and implemented PMS (Project Management System) that can support the unifying management of SI projects and be connected with EA system. We expect that EA information are updated efficiently, the level of EA utilization is boosted, and the qualities of SI products are improved, by the implementation of the PMS connected with EA system.

A Study on the Application of Construction Management Delivery System by Characteristics of Facility (건설사업관리 발주방식의 시설물 특성에 따른 적용방안에 관한 연구)

  • Gee, Hyoung-Kwon;Kang, Hyun-Wook;No, Jae-Deuk;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.449-454
    • /
    • 2008
  • The purpose of this study is to analyze, applications of the construction management delivery systems according to characteristics of facilities. The adapted research method is to selected four mall in the capital region and then divided them into two groups: CM for Fee or CM at Risk. After analyze each applications and administrations, it could propose proper applications of CM for fee according to CM at Risk. The results of this study are as follows: 1) the CM for Fee was suitable for the projects focused on completing on time and constructing the effective business plan of quality control, and 2) the CM at Risk was suitable for the projects concentrated on the cost reduction through shorten the construction time and the related businesses on quality control.

  • PDF

Establishment of Room Based Database for Configuration Management in Nuclear Power Plant - Focusing on the Design Requirement and Facility Configuration Information - (원자력발전소의 형상관리를 위한 실(Room)기반 데이터베이스 구축에 관한 연구 - 설계요건 및 형상정보를 중심으로 -)

  • Shin, Jaeseop
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.34-45
    • /
    • 2018
  • Nuclear power plant(NPP) is a large-sacle national infrastructure with total project cost of 77 billion dollars and period of 10 years or more. Moreover, since it is operated over 60 years, NPP is a facility closely related to national economy and public safety. Therefore, accurate information and consistent physical configuration should be maintained to enable accurate and economical decision making in NPP project process such as design, construction, operation, and decommission. Since NPP industry is more complicate and regulated than other industries, the importance of configuration management(CM) has been widely recognized in the early days. However, there were limitations in implementing systematic CM due to unclear purpose and subject. Therefore, this paper suggests a room-based database for CM in NPP reflects design requirements and facility configuration information.

Establish of Evaluation level in Public Management System using Policy Evaluation Framework in Urban Renewal Project (정책평가 틀을 이용한 도시정비사업 내 공공관리자제도의 평가기준 수립에 관한 연구)

  • Lee, Jeong Jae;Lee, Joo-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.5955-5967
    • /
    • 2015
  • This study targets to recognize needs of adopting public management system in Urban Renewal Project. and to establish evaluation level of public management system using policy evaluation framework for establishing perspective and systemic level. Also, this study constructed basic principles as expanded concept like Public, expertise, participation, rationality, and sustainability based on previous studies and expert opinion. AHP analysis results are following. In case of upper level, post management and continuity are important factors. Also in case of under level, making stable economic system, honest operating system, reducing development costs, local development with self-sufficiency were important factors. through empirical results, the implications are following. First, public management system needs to develop a consistent principle from planning step to post management. Second, it is essential point that continuous retraining between involved people and drawing residents participate in progress activity. Third, when evaluating public management system, it is need that emphasize non-physical factor like conflict issue between stakeholder.

An Establishment of Technology Innovation System for Sports R&D (전주기 개념의 스포츠산업 기술혁신체계 구축 방안)

  • Rim, Myung-Hwan;Koh, Soon-Ju
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2015.05a
    • /
    • pp.193-194
    • /
    • 2015
  • 스포츠에 과학기술 적용이 확산되고 경기력 향상과 경쟁력 확보를 위한 기술개발사업이 추진되고 있으나, 우리나라의 스포츠산업 기술혁신체계는 단계별 연계성 부족, 전담기관 부재 등 취약한 실정이다. 본 연구는 사전 기술기획으로 스포츠산업 기술정책비전, 메가트렌드 및 기술수준격차 분석 등을 수행하는 기술기회탐색과정을 추가하고 기술기획, 선정평가, 수행관리, 결과평가, 활용관리에 이르는 전주기 개념의 기술혁신체계 구축 방안을 제시하고 있다.

  • PDF

A Study oil the Application of EVMS in Defense R&D Programs (국방연구개발 사업에 EVMS 적응방안 연구)

  • Choi Seok-Cheol;Kim Jong-Pil
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.8 no.1 s.20
    • /
    • pp.62-68
    • /
    • 2005
  • In this paper, we review the general technique of Earned Value Management System(EVMS) which is the integrated management for cost, schedule and performance, and suggest an application of the integrated management of cost and schedule in the research and development(R&D) programs for defense acquisition.