Design and Implementation of Sensibilities Lighting LED Controller using Modbus for a Ship (Modbus를 이용한 선박용 감성조명 LED 제어기의 설계 및 구현)

  • Jeong, Jeong-Soo;Lee, Sang-Bae
    • Journal of Navigation and Port Research
    • /
    • v.39 no.4
    • /
    • pp.299-305
    • /
    • 2015
  • Modbus is a serial communications protocol, it has since become a practically standard communication protocol, and it is now a commonly available means of connecting industrial electronic devices. Therefore, it can be connected with all devices using Modbus protocol to the measurement and remote control on the ships, buildings, trains, airplanes and etc.. In this paper, we add the Modbus communication protocol to the existing lighting controller sensitivity to enable verification and remote control by external environmental factors, and also introduces a fuzzy inference system was configured by external environmental factors to control LED lighting. External environmental factors of temperature, humidity, illuminance value represented by the LED through a fuzzy control algorithm, the values accepted by the controller through the sensor. Modbus is using the RS485 Serial communication with other devices connected to the temperature, humidity, illumination and LED output status check is possible. In addition, the remote user is changed to enable it is possible to change the RGB values in the desired color change. Produced was confirmed that the LED controller output is based on the temperature, humidity and illumination.

Development of 3-Dimensional Rebar Detail Design and Placing Drawing System (3차원 배근설계 및 배근시공도 작성 자동화 시스템 개발)

  • Choi, Hyun-Chul;Lee, Yunjae;Lee, Si Eun;Kim, Chee Kyeong
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.4
    • /
    • pp.289-296
    • /
    • 2014
  • The rebar detailing is an important work influencing the final performance and quality of RC structures. But it is one of the most irrational and illogical activity in construction site. Many groups of workers, including main contractors, structural engineers, shop drawers, rebar fabricators, and etc., participate in this activity. A loosely-organized process for this activity is apt to produce a big amount of rebar loss or even degraded structures. A 3-dimensional rebar auto-placing system, called as Rebar Hub, has been designed and implemented in this research. Rebar Hub provides a totally integrated service from 3D structural modeling of buildings to rebar auto-placing considering anchorage, splice, and the length of ordered rebar. In addition, Rebar Hub can recognize the 2D drawing CAD files and then build 3D structural models which are used for the start point of 3D rebar auto-placing. After rebar auto-placing, each members of the 3D structural model have rebar information belonging to them. It means that the rebar information can be used for the afterward works such as quantity-survey, manufacturing and fabrication of rebars. Rebar Hub is showing outstanding performance while applying to practical projects. It has almost five times productivity and reduces the rebar loss up to 3~8% of the initially-surveyed amount of rebar.

Case Study on Economical Fabrication and Erection of Steel Structure and Reduction in Field Erection Time (경제적 철골제작$\cdot$설치 및 공기단축 사례분석연구)

  • Ahn Jae-Bong;Choi Yoon ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.183-192
    • /
    • 2004
  • Even in Korea the number of steel structure buildings that allow internal space and easy change of their layouts in accordance with the purpose of buildings and box-type steel bridges constructed with thick plates with thickness in a rage just from a few $\beta$AE to \$100\beta$AE is increasing these days and therefore, domestic fabrication and processing technology of members for steel structures is being improved at a pace faster than in the past to meet the growing requirements of consumers for high reliability on quality control on the related steel structures. However, most domestic fabricators os steel structures who are turning out their steel products in accordance with the designs prepared by engineering companies in their respective works for the sake of cost cut more than anything else, hesitating to introduce any advanced new technology into themselves. In the case of the steel structure design application for small and mid-size buildings in particular, it is quite meaningful not only for those who are involved in steel structure business, but also for the people working at construction work fields to review the result of the study on the connections of steel structure members deigned to obtain superb quality of steel structures within short period for steel fabrication and erection at fields in economical ways, as there is a glowing tendency seeking standardization of connection of steel structure members as well as whole structure together with the development on design of construction system of buildings including their exterior and interior decoration materials, manufacture of the related members and fabrication technique structure. This paper has been prepared with the aim to review the peculiar characteristics of buildings constructed with the main frames of steel structures and actual cases of the change made ing the connections between steel structure columns and between columns and girder members in order to reduce the work period necessary for fabrication and erection of steel structures at the maximum as well as the some examples of steel structures fabricated through automatic welding by robots for box-type columns in addition to the description of the problems found in the course of fabricating those steel structures, suggesting possible counter-measures to solve them.