• Title/Summary/Keyword: 빌딩모델정보

Search Result 89, Processing Time 0.031 seconds

Framework of Conceptual Estimation Model for BIM based Internal Finishes of High-rise Building Project (BIM기반의 초고층 빌딩 내부마감 개략견적 코스트모델 개발)

  • Chung, Suwan;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.53-61
    • /
    • 2014
  • Previous studies reveal the need for a tool to cost estimation of building design in early design stages. This paper proposes an internal finishes cost model tool to address this need. The tool allows users to evaluate the functionality, economics and quality of finishes concurrently with high-rise building design. Lack of information in the early stages of the project enables a relatively accurate estimates of work to raise up. Measurements are automatically extracted from simple design information and profile driven estimates are revised in real-time. The data model uses a flexible unit rate system that can easily be extended to other estimate dimensions such as mix-use building surcharge rate estimation. The approach illustrated in this paper is applicable to BIM tool conceptual estimation that support for massing purposes other than the one chosen for this study.

Difference Factors Analysis of between Quantity Take-off Using BIM Model and Using 2D Drawings in Reinforced Concrete Building Frame (건물 골조수량 산출 시 BIM모델 기반 수량과 2D도면 기반 수량 차이 요인 분석)

  • Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.651-662
    • /
    • 2023
  • Recently, research on the use of Building Information Modeling(BIM) for various construction management activities is being actively conducted, and interest in 3D model-based estimation is increasing because it has the advantage of being able to be automatically performed using the attribute information of the 3D model. Therefore, this study aimed that the difference in the quantities is calculated the quantity based on the 2D drawing of a building and is extracted from the 3D model created by the Revit software was compared and tried to find out the cause. The difference in the quantity calculated by the two methods was the largest in the formwork, followed by the smallest in the order of the quantity of rebar and concrete. The reason for this difference is that there is a part where the quantity extraction in the 3D model is not suitable for the quantity calculation standard, and in particular, in the case of formwork, it was difficult to separate only the quantity of the necessary part. In addition, since the quantity of rebar was not separated by member, it was impossible to accurately compare the quantity and identify the cause of the difference. Therefore, it is considered to be the most reasonable to use application software that imports only the numerical information necessary for quantity calculation from the 3D model and applies a separate calculation formula.

Suggesting Solutions when Applying Building Information Modeling (BIM) to the Korean Construction Industry through Case Studies (사례 분석을 통한 국내 BIM 적용 문제점 및 대안 도출에 관한 연구)

  • Park, Jung-Wook;Kim, Sang-Chul;Lee, Sang-Soo;Song, Ha-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.93-102
    • /
    • 2009
  • When faced with new projects, such as high-rise, complex, free-formed, and sustainable buildings, numerous participants in the building Industry use Building Information Modeling (BIM) technology. In 2009, the use of BIM spread to more contractors than eyer before. This paper aims to study the definition and characteristics of BIM, and to analyze Korean BIM application problems. Solutions for the application of BIM to the Korean Construction Industry suggested, by studying cases from developed counties and from Korea.

Smart elevator operation management mobile application design using clustering techniques (클러스터링 기법을 이용한 스마트 엘리베이터 운영관리 모바일 어플리케이션 설계)

  • Park, Hung-Bog;Son, Gwan-yeong;Choi, Geum-kang;Hwang, You-kyung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.10a
    • /
    • pp.661-662
    • /
    • 2016
  • It's being a trend that contemporary buildings are getting higher. And in line with this, we suggest the smart elevator operation management mobile application which is designed using clustering techniques to improve user's elevator access control and convenience. This clustering technique using the elevator's calling data make it possible to find its best position, and know the state of it using a smart phone as well. With this, not only the users' waiting time can be decreased, but also their convenience can be improved with the remote control system that got efficient a lot.

  • PDF

Design and Implementation of Virtual Environment for Team-based Firefighter Training (소방관 팀 훈련을 위한 가상환경의 설계 및 구현)

  • Lee, JaiKyung;Cha, Moohyun;Choi, Byungil;Kim, Taesung
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2010.11a
    • /
    • pp.818-819
    • /
    • 2010
  • 고층빌딩, 지하역사와 같은 대형 복합건물은 건물 자체의 복합도 증가와 더불어 이에 따른 위험요소(hazard)의 증가를 가져오고 위험상황에 대처해야 할 소방관들의 대응기술 및 훈련도 고도화되어야 한다. 실제 화재현장, 특히 대형 복합건물에 대한 훈련은 비용, 시간뿐만 아니라 소방관 안전 확보라는 차원에서 불가능하며 반복적인 훈련이나 그 평가가 어렵다는 점에서 가상환경을 이용한 훈련 시스템이 필요하다. 본 논문에서는 복합건물에 대한 소방관 팀 훈련 시스템 구현을 위한 가상환경의 설계 및 구현을 소개하고자 한다. 가상환경은 소방관의 훈련 및 평가, 팀 단위훈련을 제공하고 현실감 있는 훈련을 위하여 가상현실, 증강현실, 물리체험 모듈을 이용한 사용자 인터페이스를 제공한다. 가상환경 구축을 위하여 대상 건축물에 대한 3 차원 모델을 구축하고 도출된 발생 가능한 화재 시나리오에 대한 수치적 모델링을 수행하고 그 결과를 가상환경 및 훈련 시나리오에 반영하였다.

Establishment of Integrated Design Bases Management System of APR1400 Using BIM based Algorithm (BIM기반 Algorithm을 활용한 APR1400 설계기준 통합관리 체계 구축)

  • Shin, Jaeseop;Choi, Jaepil
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.52-60
    • /
    • 2019
  • The APR1400 is a 1400MWe nuclear power plant developed through national technology development project over a period about 10years. Approximately 65,000 design drawings are produced for APR1400 construction. In order to maintain consistency among numerous drawings, the highest level of design bases drawings (DBDs) are created according to design bases and this is used in the subsequent design. However, DBDs are produced and managed on a document basis and they are managed various field, it was difficult to accurately reflect the design bases information in the subsequent design. Therefore, this study recognizes limitations of the document based DBDs and develops a system that can accurately reflect the design bases information to subsequent design by adopting BIM based design bases integrated information system. Especially, by introducing DBIL(Design Bases Information Layer) concept, DBIL was created and analyzed based on five design bases(Physical protection, Fire protection, Internal missile protection, Internal flood protection, Radiation protection) applied to APR1400. In the final result DBIL set and Datasheet are integrated of room, design bases information, building data(wall, slab, door, window, penetrations). So it can be used for subsequent design automation and design verification. Furthermore, it is expected that APR1400 DBILs data can be used extensively in constructability and design economics analysis through comparison with next generation nuclear power plant.

Strategy and Technology for Digital Transformation of Design and Construction of RC Structures (철근콘크리트골조 설계와 현장관리 디지털전환 전략과 기술개발)

  • Chee Kyeong Kim
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.4
    • /
    • pp.265-272
    • /
    • 2023
  • This paper presents a conceptual strategy and technologies for the digital transformation of design and construction of reinforced concrete (RC) structures. The development of an automated detail design strategy for RC structures is described. Integrated digital platform based on 5D BIM concept is proposed for the replacement of the current technology environment-based 2D CAD. Generally, the detail design development is labor-intensive and iterative. Effective automation of relevant aspects can dramatically improve productivity and accuracy. The proposed solutions for the automated BIM modeling based on the rebar and formwork detail design automation achieves the productivity and accuracy sufficient for site application. The platform integrates and manages the information flow between each solution or application and provides it to all participants of the project. Finally, it is expected that the proposed strategy and technologies can be further enhanced to achieve the productivity and accuracy needed for widespread site application and digital transformation.

Accuracy Evaluation and Terrain Model Creation of Urban Space using Unmanned Aerial Vehicle System (무인항공시스템을 이용한 도시공간 지형모델 생성 및 정확도 평가)

  • Do, Myung-Sik;Lim, Eon-taek;Chae, Jung-hwan;Kim, Sung-hun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.17 no.5
    • /
    • pp.117-127
    • /
    • 2018
  • The author tried to propose the orthographic and DTM (digital terrain model) creation and evaluate the accuracy for an university campus using UAV (unmanned aerial vehicle) system. Most previous studies used GPS-based data, but in this paper, the observations of triangulation level measurements was used for comparison of accuracy. Accuracy analysis results showed that the operational requirements for aerial photographic standards are satisfied in all scenaries. The author confirmed availability in aviation photo measurements and applications using UAV (Drone). In order to create a sophisticated DTM and contour, we need to eliminate interference from building, trees, and artificial objects. The results of this study are expected to be used as the basis for future studies in the creation of DTM and the accuracy assessments using Drone.

Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings (오브젝트-파라미터기반 건축마감공사비 개산견적 모델)

  • Koo, Kyo-Jin;Park, Sung-Ho;Park, Sung-Chul;Song, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.175-184
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The prototype-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by parameter and additional work items by users. This research presents the object-parameter based schematic estimation model in the design development stage that can lead to accurately estimate the cost by using historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item. In addition, a case study is performed for the effectiveness as comparing the previous estimating method with the proposed model.

A Study on the Establishment of IT Service Model for the Possibility of Application in Construction Field - Focused on the building facility - (건설분야에 적용가능한 IT 서비스 모델 구축방안 연구 - 빌딩시설물을 대상으로 -)

  • Lee, Woo-Sik;Hong, Chang-Hee
    • Spatial Information Research
    • /
    • v.19 no.6
    • /
    • pp.123-131
    • /
    • 2011
  • The object of this study is to build service model that combines developing IT technology with construction filed. It combines existing traditional construction project with high-tech IT choosingly, diverting construction project from labour-intensive to value-added technology-intensive industry. By doing so, it plans improving productivity and creation of new market. Now most ideal field of combining construction with IT technology is U-City industry that is being emphasized recently. Therefore, For this study, We analyze present condition of several IT technology used in construction and U-City project. Also, determining priority of promising IT technology for requirement analysis of consumer. And it proposes plan for construction of U-City service model through prospect and environment analysis of U-City and IT industry.