• Title/Summary/Keyword: 비용 인자

Search Result 405, Processing Time 0.031 seconds

Research on Groundwater Quality and Economic Expenses for Drinking in Daegu and Gyeongbuk Areas (대구.경북지역 마을상수도용 지하수의 수질과 주민의 경제비용에 대한 조사)

  • Kang, Mee-A;Jeong, Tae-Kyung
    • The Journal of Engineering Geology
    • /
    • v.19 no.3
    • /
    • pp.307-311
    • /
    • 2009
  • Agricultural is recognised as being the leading contributor to groundwater. As a consequence, the consumer have to has bear the high expenses of water supplied to be treated. Importantly, the cost of water supplied is a function of the water quality as well as the scale of drinking water treatments. The relationship between the consumer payment and water quality improvement was affected by the scale of drinking water treatments directly. Hence when we achieve the high quality and low cost in the case of groundwater treatment for drinking, it is needed to consider both water quality and plant scale.

Indicators for identification of urban flood vulnerability (도시홍수취약성 평가 인자 선정)

  • Lee, Gyumin;Jun, Kyung Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.88-88
    • /
    • 2016
  • 최근 우리나라에서 발생한 홍수 중 많은 관심을 불러일으킨 2010년 광화문 일대와 2011년 강남역 일대 홍수의 주요 원인은 하천관리를 통하여 대응해온 지금까지의 홍수와는 달리 도시의 우수배제 기능이 높은 강도의 강우에 대응하지 못한 것으로 분석되고 있다. 도시내부에서 발생한 이 같은 홍수는 도시의 기능에 심각한 영향을 줄 수 있으며, 거주민의 안전과도 밀접하게 연관된다. 본 연구에서는 도시의 기능과 거주민의 안전을 우선적으로 고려한 홍수 취약성평가 인자를 선정하고자 한다. 기존의 여러 홍수취약성 연구들에서는 취약성을 평가함에 있어 피해금액을 기준으로 적용하는 경우가 많이 있다. 장기적인 홍수대응, 완화 정책의 구상에 있어 예상되는 피해금액은 중요한 지표라고 볼 수 있다. 그러나 이 방법으로는 도시에서 발생 가능한 피해를 모두 반영하는데 한계가 있다. 도로, 지하철, 철도 등의 교통수단이 침수되는 경우, 피해회복을 위한 비용뿐만 아니라, 도시기능에 심각한 영향을 주어 도시의 생산성, 안정성에 막대한 피해를 남길 수 있다. 따라서 피해금액의 규모에 대한 접근만으로는 도시에서 발생한 홍수에 의해 피해를 받는 취약요인을 적극적으로 반영할 수 없다. 본 연구에서는 도시홍수 피해양상과 이에 대한 대응 방법 등 홍수의 물리적 위험성 뿐 아니라 홍수와 연관된 사회적인 요인들을 반영한 취약성 평가인자를 구성하기위하여 인자간의 인과관계 등을 고려하여 인자의 범위를 규정하고 델파이 설문조사와 문헌 연구를 통하여 전문가 의견을 수집, 분석하였다. 홍수취약성에 영향을 주는 요인들을 크게 3가지 그룹으로 정리하여 도시구조물, 거주민, 위험요인으로 구분하고 각 항목별로 영향인자을 선정하였다. 결정된 인자는 2011년 홍수피해가 발생한 도림천 유역에 적용하여 홍수취약성 평가를 수행하고자 한다.

  • PDF

Accelerated Weathering Test of Urethane Paint for Heavy Construction Equipment (중장비용 우레탄도료의 내후성 가속시험)

  • 김대용;김영준;여상구
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2002.06a
    • /
    • pp.115-115
    • /
    • 2002
  • 최근 중장비용 도료의 외관 즉 색상 및 광택의 변화는 상품가치를 결정하는 중요한 요소의 하나로 대두되고 있다. 이와 관련 도장 품질향상을 위해서 각종의 신도료가 개발되고 있고 물성 확인은 필수적이다. 특히 검사 항목중 내후성 확인은 Field에서 2년 이상 장시간의 시험기간이 필요하나 검증기간 단축을 위해 시험실에서 Weathering test를 시행하고 있다. 그러나 이러한 Lab. test 결과와 실제 Field data와의 상관관계를 알 수 없어 추정에 그치는 것이 현실이었다. 본 연구에서는 중장비용 우레탄도료의 내후성에 영향을 미치는 인자를 고려, 물성을 대폭 향상시킨 도료에 대해 시험실 Weathering test 결과와 옥외폭로시험 결과, 실제 장비에 적용한 Data를 토대로 중장비용 우레탄 도료의 내후성시험 가속계수를 도출하여 개발도료의 내후성 검증기간을 단축하고자 하였다.

  • PDF

An Analysis of Factors Affecting Environmental Load in Earthwork Type of Road Project (도로건설공사 토공작업부에 대한 환경부하 영향인자 분석)

  • Park, Jin-Young;Im, Je-Gyu;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.52-60
    • /
    • 2018
  • In the construction industry, attempts to evaluate the environmental impact of products through life cycle assessment (LCA) approach has been on the rise. However, the domestic construction industry needs to make rapid decisions due to limited budget and schedule, so it is difficult to carry out a review of the environmental load on all resources. The decision-making process requires information on the major influence factors that should be focused on to reduce environmental load. And this information should be quantified so that it can be linked to environmental impact assessment. In this study, the LCA results of road construction cases were analyzed to provide such information. As a result, diesel, ready-mixed concrete, urethane-based paint, aggregate, and asphalt concrete were found to be the main factors that generated 93.17% of the environmental load in the earthwork type of road project. The total environmental cost caused by these affecting factors when constructing 1 km of earthwork type of road project is 242 million won. The analysis also shows that a 10% reduction in the amount of ready-mixed and asphalt concretes can reduce carbon emissions by 5.02% and 2.28% while reducing environmental costs by 11 million won per kilometer. In order to reduce carbon emissions of the earthwork type of road project, it is necessary to actively develop and introduce new methods and eco-friendly materials to reduce the overall use of ready-mixed concrete and asphalt concrete.

A Color Image Coding by Estimating Spectral Correlation Based on Wavelet Transform (웨이블렛 변환 기반 스펙트럴 상관성 추정에 의한 칼라 영상 부호화)

  • Kwak, No-Yoon;Jeong, Dae-Gwon;Hwang, Byong-Won
    • Journal of the Institute of Electronics Engineers of Korea SP
    • /
    • v.37 no.1
    • /
    • pp.49-58
    • /
    • 2000
  • This paper presents a new color Image coding method which estimates color component Images from luminance image using spectral correlation m wavelet transformed domain More specifically, the wavelet transform is performed to the luminance image(Y), and then, for an efficient quad-tree division to encompass the varying block size, a cost function IS defined using high frequency coefficients generated by wavelet decomposition Next, a scale factor and an offset factor for each the block to minimize the estimation error between luminance image(Y) and R, B Images, are iteratively calculated With respect to the varying block size With associated cost function.

  • PDF

A Methodology for Estimating Reliability and Development Cost of a New Liquid Rocket Engine -focused on Staged Combustion Cycle with LOX/LH2 (액체로켓엔진의 신뢰도 및 개발비용 추정 방법 -LOX/LH2 다단연소 사이클을 중심으로)

  • Kim, Kyungmee O.;Hwang, Junwoo
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.42 no.5
    • /
    • pp.437-443
    • /
    • 2014
  • Engine is one of the most important parts in a rocket for completing its mission successfully. In this paper, we provide a methodology for estimating reliability and development cost of a liquid rocket engine newly developed. To estimate reliability, a baseline engine is selected considering factors whose effects on reliability are unquantifiable. Then reliability of a baseline engine is adjusted to reflect the effect of factors that can be modeled quantitatively. Using the previous Transcost engine cost expressed in terms of mass and the number of hot firing tests, the engine development cost is reexpressed in reliability and thrust requirements. Finally, a numerical example is given to illustrate the application of the methodology to a turbopump rocket engine using staged combustion cycle with LOX/LH2 propellant.

A Study on Improvement of Gravity model Decay Function of Transporting Demand Forecasting Considering Space Syntax (Space Syntax를 이용한 교통수요예측의 중력모형 저항함수의 개선방안)

  • Jang, Jin-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.3
    • /
    • pp.617-631
    • /
    • 2019
  • In the four-step demand model, a gravity mode is used most commonly at the trip distribution stage. The purpose of this study was to develop a new friction factor that can express the accessibility property as a single friction factor to compensate for the variable limits of the gravity model parameters (travel time, travel cost). To derive a new friction factor, a new friction factor was derived using the space syntax that can quantify the characteristics of the urban space structure, deriving the link-unit integration degree and then using the travel time and travel distance relationship. Calibration of the derived friction factor resulted in a similar level to that of the existing friction factor. As a result of verifying the various indicators, the explanatory power was found to be excellent in the short - and long - distance range. Therefore, it is possible to derive and apply the new friction factor using the integration index, which can complement the accessibility beyond the limit of the existing shortest distance, and it is believed to be more advantageous in future utilization.

Image Matching by First Eigenvector and Histogram Analysis (일차 고유벡터와 히스토그램 분석에 의한 영상 정합)

  • Im, Mun-Cheol;Hwang, Seon-Chul;Kim, Woo-Saeng
    • Journal of KIISE:Software and Applications
    • /
    • v.27 no.10
    • /
    • pp.1054-1061
    • /
    • 2000
  • 영상 정합은 물리적으로 유사한 영상 내의 영역들을 기하학적으로 일치시키는 처리이며 지형 정보, 영상검색, 원격탐사, 의료영상 등의 많은 영상처리 응용에서 사용된다. 영상 정합에 관한 연구는 주로 회전, 크기, 위치 등의 인자 추출에 소요되는 시간과 정확성에 중점을 두어 왔다. 본 연구에서는 영상의 특징 점들에 대한 일차 고유벡터의 방향 분포를 히스토그램으로 표현하고 이를 비교 분석함으로써 정합하는 방법을 제안한다. 일차 고유벡터를 이용함으로써 특징 묘사의 단순성을 제공하고. 히스토그램을 이용하여 정합 인자를 미리 추정함으로써 정합 인자 추출 시 목적함수의 연산에 소요되는 비용을 현저하게 줄였다. 본 연구의 결과를 평가하기 위해 제안한 방식을 일반 영상과 ICG(IndoCyanine Green)망막 영상에 적용한 결과를 보여주고 목적함수의 연산횟수와 시간 복잡도를 기존의 방법들과 비교하였다.

  • PDF

Development of a Lifting Type Garlic Harvester(1) - Design Concept and Analysis of Design Factors - (인발식 마늘수확기 개발(1) - 개념설계 및 설계인자 분석 -)

  • 장영창;노광모;박준걸
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 1999.07a
    • /
    • pp.77-82
    • /
    • 1999
  • 현재까지 마늘 생산의 생력기계화 작업체계는 확립되어 있지 않으며, 특히 마늘의 수확은 많은 노동력을 필요로 하여 마늘 생산비에 수확비용이 차지하는 비중은 매우 높다. 따라서 마늘 수확의 생력화를 위해 마늘수확기 개발이 시급한 실정이다. 마늘수확기의 개발을 위해 분석, 구명되어야 할 중요한 인자는 수확기의 소모동력, 작업성능, 메커니즘의 간결성과 편리성, 수확효율 및 수확후 처리 등에 관계되는 모든 인자들이 포함된다. 나아가 마늘수확기에 고려되어야 할 주요 작동부는 동력발생부, 동력전달부, 마늘수확부 및 이송부, 마늘 수확을 위한 전처리부 및 후처리부, 마늘수확기 운행에 필요한 운전부 등으로 나눌 수 있다. (중략)

  • PDF

The Method of Deciding Design Level of Service with Optimal User Cost (사용자비용최적화를 통한 도로 설계서비스수준 산정방안)

  • 장재남;이용택;김호덕;장명순
    • Journal of Korean Society of Transportation
    • /
    • v.18 no.2
    • /
    • pp.17-26
    • /
    • 2000
  • LOS(Level of Service), the qualitative measure describing operational condition of highway, must be evaluated as quantative index in terms of user service. So, This study is focused on developing the user cost function that user cost is measured in the variation of V/C, MOE(Measure of Effectiveness) of LOS in basic Section of highway. The user cost is calculated as the sum of accident cost, operation cost, travel time cost. The data is collected in the four basic section of Singal-Ansan and Jung bu Highway. As the result of user cost function analysis, the user cost is the lowest When V/C is 0.54. Considering the V/C ratio(0.7) of Basic Section in rural highway suggested in KHCM, We find out that the LOS suggested KHCM increase the user cost of highway.

  • PDF