• Title/Summary/Keyword: 비용 리스크 관리

Search Result 98, Processing Time 0.03 seconds

Development of SVM-based Construction Project Document Classification Model to Derive Construction Risk (건설 리스크 도출을 위한 SVM 기반의 건설프로젝트 문서 분류 모델 개발)

  • Kang, Donguk;Cho, Mingeon;Cha, Gichun;Park, Seunghee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.841-849
    • /
    • 2023
  • Construction projects have risks due to various factors such as construction delays and construction accidents. Based on these construction risks, the method of calculating the construction period of the construction project is mainly made by subjective judgment that relies on supervisor experience. In addition, unreasonable shortening construction to meet construction project schedules delayed by construction delays and construction disasters causes negative consequences such as poor construction, and economic losses are caused by the absence of infrastructure due to delayed schedules. Data-based scientific approaches and statistical analysis are needed to solve the risks of such construction projects. Data collected in actual construction projects is stored in unstructured text, so to apply data-based risks, data pre-processing involves a lot of manpower and cost, so basic data through a data classification model using text mining is required. Therefore, in this study, a document-based data generation classification model for risk management was developed through a data classification model based on SVM (Support Vector Machine) by collecting construction project documents and utilizing text mining. Through quantitative analysis through future research results, it is expected that risk management will be possible by being used as efficient and objective basic data for construction project process management.

Analysis of Potential Construction Risk Types in Formal Documents Using Text Mining (텍스트 마이닝을 통한 건설공사 공문 잠재적 리스크 유형 분석)

  • Eom, Sae Ho;Cha, Gichun;Park, Sun Kyu;Park, Seunghee;Park, Jongho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.91-98
    • /
    • 2023
  • Since risks occurring in construction projects can have a significant impact on schedules and costs, there have been many studies on this topic. However, risk analysis is often limited to only certain construction situations,and experience-dependent decision-making is therefore mainly performed. Data-based analyses have only been partially applied to safety and contract documents. Therefore, in this study, cluster analysis and a Word2Vec algorithm were applied to formal documents that contain important elements for contractors or clients. An initial classification of document content into six types was performed through cluster analysis, and 157 occurrence types were subdivided through application of the Word2Vec algorithm. The derived terms were re-classified into five categories and reviewed as to whether the terms could develop into potential construction risk factors. Identifying potential construction risk factors will be helpful as basic data for process management in the construction industry.

Study on Risk Priority for TBM Tunnel Collapse based on Bayes Theorem through Case Study (사례분석을 통한 베이즈 정리 기반 TBM 터널 붕괴 리스크 우선순위 도출 연구)

  • Kwon, Kibeom;Kang, Minkyu;Hwang, Byeonghyun;Choi, Hangseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.785-791
    • /
    • 2023
  • Risk management is essential for preventing accidents arising from uncertainties in TBM tunnel projects, especially concerning managing the risk of TBM tunnel collapse, which can cause extensive damage from the tunnel face to the ground surface. In addition, prioritizing risks is necessary to allocate resources efficiently within time and cost constraints. Therefore, this study aimed to establish a TBM risk database through case studies of TBM accidents and determine a risk priority for TBM tunnel collapse using the Bayes theorem. The database consisted of 87 cases, dealing with three accidents and five geological sources. Applying the Bayes theorem to the database, it was found that fault zones and weak ground significantly increased the probability of tunnel collapse, while the other sources showed low correlations with collapse. Therefore, the risk priority for TBM tunnel collapse, considering geological sources, is as follows: 1) Fault zone, 2) Weak ground, 3) Mixed ground, 4) High in-situ stress, and 5) Expansive ground. In practice, the derived risk priority can serve as a valuable reference for risk management, enhancing the safety and efficiency of TBM construction. It provides guidance for developing appropriate countermeasure plans and allocating resources effectively to mitigate the risk of TBM tunnel collapse.

Risk Factor Analysis of Penetrating Fragile States' Construction Market : Focusing on the North Korean Case (취약국가(Fragile State) 건설시장 진입 시 리스크 대응을 위한 요인분석 : 북한 사례를 중심으로)

  • Hong, Eunbin;Yi, June-Seong;Son, JeongWook;Jang, YeEun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.5
    • /
    • pp.17-28
    • /
    • 2021
  • The construction industry has challenges and opportunities for Sustainable Development Goals (SDGs). The task of the construction industry is to improve the quality of construction, which is particularly necessary for the Fragile State. The construction industry's primary role is to provide jobs and maintain and improve the construction environment that affects the quality of life. Using the Delphi method and EFA in this study, [Pre-Execution] and [Execution] were derived as risk areas that require intensive hedge when penetrating the construction market in fragile states. It was concluded that the risk hedge to the master plan for the business conditions and infrastructure is the most important.

A Study on the Estimation of the Contingency by the Regression Analysis on the Apartment (회귀분석을 통한 공동주택 공사예비비 산정에 관한 연구)

  • Lee Man-Hee;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.226-229
    • /
    • 2003
  • Construction manager must consider the possibility on the failure of the project in advance and the contingency to provide against the situation, those of which is a dangerous condition not to predict. If they have a quick decision without understanding the contingency, the over-cost in the total cost would be continuously accumulated, and be a barrier at a project going in progress. A various risk could not be coped with at a time to decide either going or sloping the project until the contingency is applied from the first step to progress the project. But a case to apply the contingency to the construction for the investment or the analysis of the project is a little. The process to evaluate it is also absent. The propose of this paper is the followed ; To establish the total cost including the risk first of all, devide into plus or minus factor of the cost, and then the process to calculate the contingency must be suggested by the regression analysis.

  • PDF

A Study for strategic cooperaton of enterprise security and business (기업보안과 비즈니스의 전략적 협력에 관한 연구)

  • Ryu, Hyung-Chang
    • Korean Security Journal
    • /
    • no.28
    • /
    • pp.103-130
    • /
    • 2011
  • This study is the research of enterprise security for raising the profitability and stability of Korean companies in global business environment and strategic cooperation of business. As the scientific technology gets complicated as day goes by and new competitors appear regardless the border in the modern business environment, the situation happens frequently which the huge company hands over their market to the new one armed with the innovative thinking overnight. To survive such new environment, the answer is the change of paradigm regarding business management method at the new point of view. With the low level of security risk management of Korean companies which stick to old habit, the security management which helps the companies secure profits is not affordable. The global village where the population of 7 billions live in 21st century is facing up to the rapid ecological adaptation. The rapid change of climatic environment creates the hundreds of thousands of sufferers in a moment, and we have been watching the millions of livestock are buried alive due to new contagious disease everyday. Such change encourages the humans in global village to change the basic way of living. The business ecosystem which is the basic root for economic life cannot be an exception. To survive the business environment of 21st century, the security risk management at management level is required and the reporting line of companies should be established newly for raising business competing power through security risk management. The companies should bear in mind that they can be disappeared into our old memories overnight if they are not sensitive to the changing environment. Out of new risks for the modern companies, the field especially Korean companies are dealing easily is the security risk. Not like past, the security risk which's size is much more massive and its propagation velocity is very fast is the one of important business risks which the management should take care. Out of security risks which influence on the modern companies significantly, the brand of companies, protection of their reputation, continuity of production and operation and keeping customer's trust are prior to the others. This study offered the suggestion regarding enterprise security and the strategic cooperation of business to deal with such security risk effectively.

  • PDF

An Introduction of Development for Next Generation Logistics Management System in Construction Project (건설산업의 물류관리 체계 개선을 위한 차세대 지능형 건설 물류관리 시스템 개발 현황)

  • Kwon, Soon-Wook;Chin, Sang-Yoon;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.99-105
    • /
    • 2008
  • For large-scale projects, supply chain management of construction materials is a key to a successful construction project. Inefficient management would cause significant loss in project cost, quality problems (and possible re-work), delayed delivery, claims, etc. On the other hand, efficient supply chain management system can reduce risks even the given project suffers from tricky details and frequent changes thanks to reduced material loss, shortened delivery time, and the quality outcome; this is a win-win situation for both clients and contractors. This paper presents a next-generation intelligent supply chain management system, which is intended to support large-scale construction projects such as urban high-rise buildings, as a strategic vision of the future construction logistics.

  • PDF

A Probabilistic Risk-based Cost Estimation Model for Initial-Stage Decision Making on Apartment Remolding Projects (공동주택 리모델링 초기 단계 의사결정을 위한 확률론적 리스크 기반 비용 예측 모델 개발)

  • Lee, Dong-gun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.70-79
    • /
    • 2016
  • The current remodeling cost estimation process is not only dependent on the historical data of new building construction, but it also has a poor linkage with risk-based estimation approach. As such, there is a high risk of falling short of initial budget. To overcome this, a risk-based estimation approach is necessary by providing a probabilistic estimation in consideration of the potential risk factors in conducting the remodeling projects. In addition, the decision-making process should be linked with the risk-based estimation results in stead of intuitive and/or experience-based estimation. This study provides a probabilistic estimation process for residential remodeling projects by developing a detailed methodology in which a step-by-step approach can be achieved. The new proposed estimation approach can help in decision-making for remodeling projects in terms of whether to proceed or not, by effectively reflecting the potential risk factors in the early stage of the project. In addition, the study can enhance the reliability of the estimation results by developing a sustainable estimation process model where a risk-based evaluation can be accomplished by setting up the cost-risk relationship database structure.

정보시스템 장애요인 분석을 통한 운영 프로세스 개선안 연구

  • Park, Seon-Cheol;Lee, Won-Yeong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2008.10a
    • /
    • pp.136-140
    • /
    • 2008
  • 분산된 아키텍처 구조하에서의 정보시스템 구성은 처리해야 할 정보의 양에 따라 서버의 수가 증가될 수 밖에 없으며, 다수의 하드웨어와 운영체제 그리고 다양한 소프트웨어를 운영하여야 하므로 운영 및 관리의 리스크와 비용은 급격히 증가하게 된다. 이를 해결하기 위하여 그동안 도입 서버의 통합기술, 시스템 이중화 기술 등이 개발되어 적용되었으며, 수년전부터는 ITSM 프레임워크 도입되어 시스템의 운영과 관리의 효율성을 높이고자 하였다. 본 논문에서는 시스템 운영관리의 핵심지표인 가동율에 영향을 미치는 장애현황을 요인별로 분석하여 ITSM 프레임워크하에서 운영되는 정보시스템 운영관리 프로세스의 적용 효과를 측정하고 운영관리프로세스의 바람직한 개선 모델을 제시하고자 한다.

  • PDF

Integrated Support System for Assets and Insolvency Prediction based on Cloud Computing (클라우드 기반 자산 및 부실예측관리 통합 지원시스템)

  • Kim, Jaechun;Chung, Mokdong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2013.05a
    • /
    • pp.846-849
    • /
    • 2013
  • 본 논문은 클라우드 기반 자산 및 부실예측관리 통합 지원 시스템을 제안한다. 제안된 시스템은 자동화된 통합인증 및 접근제어 시스템으로서, 각기 독립된 모듈에서 처리된 데이터를 기초로 거래관리 모듈로 통합하여, 자산 및 부실예측을 평가하고 통합지원 시스템의 데이터 및 기법을 다른 모듈과 공유함으로써 자산 및 부실채권 회수 및 관리의 효율성을 높인다. 또한 제안 시스템은 클라우드 환경에서 운영되므로 정보화를 통한 경영혁신 및 경영정보를 활용한 리스크관리 시스템을 처리하는데 목적을 둔다. 따라서 제안하는 시스템은 고객 및 기업의 전략경영 등의 기능을 강화하여 업무투명성, 비용절감, 고객 접근성이 기존시스템보다 효율적으로 사용될 것으로 기대된다.