• 제목/요약/키워드: 비용 관리

Search Result 5,207, Processing Time 0.048 seconds

A study on the Economic Analysis of Electronic Records & Archival Management in the Public Institutions (공공 전자기록관리의 경제성 분석을 위한 연구)

  • Hyun, Moonsoo
    • The Korean Journal of Archival Studies
    • /
    • no.47
    • /
    • pp.255-286
    • /
    • 2016
  • This study aims to propose a tool for a comparison of public electronic records management in a public institution and a private records management facility and to reveal the considerations prior to decisions on the way of management. For developing a tool, it chooses CoMMPER as a basic model and modifies it after reviewing existing cost models, because only CoMMPER can over public records management. Modified-CoMMPER is added a new cost area[Aquisition], and is modified and extended cost elements and generic cost factors for the comparison. Public institutions which consider whether commission the management of public electronic records can use Modified-CoMMPER for comparing economic impacts in terms of long-term preservation. To make a rational decision on the way of management based on the economic analysis, this study proposed 3 main task. Fist, the scope of the activities has to be defined, second, the cost-effectiveness has to be estimated base on the cost model, for example Modified-CoMMPER, third, policy-making for the management of public electronic records must be proceeded based on the various researches on the cost of records management.

A Study on the Selection of a Bridge Structure Type Using DEA and LCC (DEA기법과 LCC개념을 활용한 교량형식 선정 방법에 관한 연구)

  • Han, Sam-Heui;Kim, Jong-Gil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.4
    • /
    • pp.101-111
    • /
    • 2013
  • In this study, DEA (Data Envelopment Analysis) was carried out on the four bridges, which have the same extension (L=1,615m), in order to select the most superior, economical method of construction using the LCC concept of each bridge structure in the case of the Ulsan-Pohang double track railway which is scheduled to be constructed. DEA models were analyzed with the CCR model, which was designed for the evaluation of relative efficiency of each model. The initial construction costs, maintenance costs, indirect costs (user costs + indirect loss of social costs), and life cycle costs were used as input variables, and average duration was applied as the output variable. LCC was applied to calculate the input variables, and to get the costs of LCC, 100 years of period and 4.83% of real discount rate were applied, and the costs are classified into initial construction, maintenance, user, and indirect loss of social cost. The analysis results showed that the Method 2 and 3 were evaluated as the most efficient, and the other alternatives were evaluated as the following order; Method 1, the default, and Method 4.

A Velocity Based Location Management for Next Generation Mobile Communication Systems (차세대 이동통신 시스템을 위한 속도 기반 위치관리)

  • 황승희;한영희;이보경;양권우
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2001.10c
    • /
    • pp.208-210
    • /
    • 2001
  • 차세대 이동통신 시스템에서 이동단말에 대한 착호를 설정하기 위해서는 위치관리가 필요하다. 기존의 동적 위치관리 기법에서는 시간, 거리, 이동회수와 같은 단편적인 이동 특성을 위치갱신의 기준으로 채택하였다. 이런 기법들은 다양한 이동성을 갖는 이동단말에 대해서 그 위치관리 비용의 편자가 크다. 가장 효율적인 것으로 알려져 있는 거리기반 기법은 이동거리만을 위치관리의 기준으로 택함으로서 이동이 적은 이동단말에 대해서는 갱신비율이 현저히 낮아짐으로서 그 비용이 작지만, 반대로 이동성이 많은 경우에는 갱신비용이 커진다. 따라서 본 논문에서는 위의 거리기반 기법의 이런 단점을 개선하면서 이동단말의 이동성을 이동거리와 시간에 의해 결정되는 속도로 나타내고, 그 속도에 따라 거리 임계값 및 시간 임계값을 조정하여 위치갱신 및 페이징을 수행하는 새로운 위치관리 기법을 제안한다. 세안된 기법의 효율성을 제시하기 위하여 분석적 모델 및 수치적 결과를 통하여 제안하는 기법과 기존의 거리기반 기법의 총 비용을 구하였으며, 그 결과 제안된 기법은 가변적인 속도 변화를 보여주는 이동단말의 이동성에 대하여 효율적임을 보여 준다.

  • PDF

Hybrid Location Updating Sheme in a PCS Network (이동 통신 환경에서 Hybird 방식을 이용한 위치관리기법)

  • 박태준;이구연
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2004.10c
    • /
    • pp.664-666
    • /
    • 2004
  • 본 논문에서는 기존의 이동 기반 위치 갱신 기법과 시간 기반 위지 갱신 기법을 혼합한 새로운 hybrid 위치 관리 갱신 기법을 제안한다. 이동 통신 시스템에서 위치관리는 위치 갱신과 페이징의 두가지 동작으로 관리 된다 기존의 위치 갱신 기법으로 이동기반 위치 갱신, 시간 기반 위치 갱신, 거리 기반 위치 갱신기법이 널리 사용되고 있다. 실용적인 면에서 이동 기반 위치 갱신 기법 혹은 시간 기반 위치 갱신기법이 사용되나 CMR에 따라 각각 장단점을 가지고 있다. 제안된 hybrid 위치 관리 기법에서는 셀 이동 횟수인 이동 임계값 d를 초과한 후 설정된 타이머 간 T를 초과할 때 위치 갱신을 실행하여 기존의 위치 갱신 기법들이 가지고 있는 불필요한 위치 갱신 비용을 줄이고자 한다. 특히 CMR이 작고 갱신 비용이 페이징 비용보다 큰 환경에서 기존의 위치 갱신 기법보다 낮은 비용으로 위치관리를 실행할 수 있다.

  • PDF

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Jung, Do-Young;Baek, Yuong-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.321-325
    • /
    • 2008
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

The Maintenance Cost Estimation Model for Information System Maintenance Based on the Operation, Management and Service Metrics (운영·관리 및 서비스 지표에 기반한 정보시스템 유지보수 비용 추정 모델)

  • Lee, Byoung-Chol;Rhew, SungYul
    • Journal of the Korea Society of Computer and Information
    • /
    • v.18 no.5
    • /
    • pp.77-85
    • /
    • 2013
  • In this paper, we present the cost measurement metrics for the operation management and service improvement besides the general maintenance. The cost measurement metrics of the operation management and service improvement are based on the metrics that are classified and summarized precedent studies and complemented by empirical measuring indicators, and we propose the maintenance cost estimation model based on this metrics. The maintenance costs can be calculated detailedly, because the proposed metrics can be used selectively, depending on the scope of the information system maintenance. The effectiveness of the proposed maintenance cost measurement metrics and cost estimation model is verified by comparison between existing studies and our research.

Location Management & Message Delivery Scheme for Mobile Agent in Multi-region Mobile Agent Computing Environment (다중 지역 이동 에이전트 컴퓨팅 환경에서의 이동 에이전트 위치 관리 및 메시지 전달 기법)

  • 최성진;강인성;백맹순;손진곤;황종선
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.04d
    • /
    • pp.490-492
    • /
    • 2003
  • 다중 지역 이동 에이전트 컴퓨팅 환경을 기반하여 이동 에이전트 시스템을 개발하는데 있어서, 이동 에이전트를 관리하고 이동 에이전트들간의 메시지 전달을 보장하기 위한 위치 관리 및 메시지 전달 기법은 중요한 고려사항이다. 그러나 기존이 관련연구들은 여러 지역으로 구성된 다중 지역 이동 에이전트 컴퓨팅 환경에 적용하기에는 위치 갱신 비용 및 메시지 전달 비용이 상대적으로 증가한다는 단점과 추적문제(Following Problem)를 발생시킨다는 한계를 가지고 있다. 이에 본 논문에서는 기존의 홈 프락시 기법과 블랙보드 기법을 변형ㆍ혼합(Hybird)하는 새로운 이동 에이전트 위치 관리 및 메시지 전달 기법인 HB 프로토콜을 제안하고자 한다. HB 프로토콜은 다중 지역 이동 에이전트 컴퓨팅 환경에서 이동 에이전트의 위치 변경시 발생하는 위치 갱신 비용과 이동 에이전트들간의 메시지 전달 비용을 효과적으로 줄이며, 추적문제를 낮은 통신비용으로 해결한다.

  • PDF

Improved Estimating Guideline for Quality Management Cost (건설공사 품질관리비 신출기준 개선방안)

  • Kim Kyoon-Tai;Ahn Bang-Ryul;Park Hyeong-Geun;Kim Kyong-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.75-83
    • /
    • 2002
  • Korea government established a domestic quality management system under the Law for Construction Technology Management, which was revised in 1997. This Law prescribes that the owner has to assign quality management cost into the construction project budget However, there are some conflicts among internal regulations and prescriptions on the scope of quality management engineer's roles was not specific. In order to overcome these limitations, this research identifies proper scope of quality management engineer's roles and suggests an approach for an improved estimating guideline for construction quality management cost.

A Case Study of maintenance cost estimation for military official residence building in BTL project (BTL사업 군관사 건축물의 유지관리비용 산정에 관한 연구)

  • Kwon, Bum-Joon;Kim, Hyun-Kyu;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.851-854
    • /
    • 2008
  • The purpose of this study is to predict the maintenance cost for military official residence building projects which were ordered for five military official residence building. In conducting this study, the adapted research method was to classify initial investment for each construction of the military official residence building and to estimate maintenance cost. This study was analyzed by studying the estimation of maintenance cost in the apartments and present value analysis method. The results of this research are as follows. 1) The initial investments was analyzed that the total construction cost would be 1,683,286 thousand won ; construction(79%), civil(3%), landscaping(2%), MEP(5%), heating and hot water supply system(5%), and water supply and sanitary system(6%) per square meter. 2) Based on the result analyzed above, the maintenance cost of the apartments was analyzed and then estimated the proper maintenance cost by using maintenance cost estimation method and present a value analysis method.

  • PDF

통화선물시장(通貨先物市場)에서의 거래비용(去來費用)의 측정(測定)과 결정요인(決定要因)에 관(關)한 연구(硏究)

  • Jo, Dae-Woo;Gwon, Taek-Ho
    • The Korean Journal of Financial Management
    • /
    • v.10 no.1
    • /
    • pp.77-96
    • /
    • 1993
  • 본 논문의 연구목적은 통화선물시장(通貨先物市場)을 대상으로 선물거래를 할 경우에 발생하는 거래비용(去來費用)의 측정(測定) 및 결정요인(決定要因)들을 규명하는데 있다. 먼저 선물시장에서 광의의 거래비용을 정의하고 이를 토대로 일별 총거래비용을 추정하였다. 추정된 총거래비용의 결정요인을 추출하기 위해 중회귀분석을 수행한 결과 거래대상통화와 가격표시통화간의 만기까지의 이자의 차이와 선물가격 의 조건부분산(條件附分散)이 총거래비용에 영향을 미치고 있음을 알 수 있었다. 또한 총거래 비용에서 이자의 차이를 제외시킨 순거래비용을 분석한 결과 거래량이 순거래비용과 양(%)의 유의적인 관계가 있음을 확인할 수 있었다. 이러한 관계를 종합해 볼 때 통화선물시장(通貨先物市場)에서의 거래비용(去來費用)은 이자요인(利子要因)과, 위험을 나타내는 조건부분산(條件附分散) 및 거래량(去來量)에 의해 그 크기가 결정된다고 결론지을 수 있었다. 즉 선물거래시의 거래비용의 크기는 이자차이(利子差異)뿐만 아니라, 분산(分散)과 거래량에 의해서도 영향을 받는다고 할 수 있었다. 이같은 본 연구의 결과는 스프레드를 주된 거래비용으로 정의해온 기존의 연구와는 차별적이라는데 그 의의가 있다.

  • PDF