Buried pipe system is subject to leak or rupture due to internal and external defects with age. Especially, if the pipeline is designed for pressurized gas, the leak can wreak a devastating on its surrounding area. The current method of setting up underground gas pipeline is based on OGP criteria of applying one tenth of the inner pipe pressure. The criteria is applied irrespective of their burial depth or pipe's properties. At times, even the whole safety measures are totally ignored. Considering the magnitude of possible damage from a gas leakage, a precise analytical tool for the risk assessment is urgently needed. The study was conducted to assess possible scenarios of gas accidents and to develop a computer model to minimize the damage. The data from ETA was analyzed intensively, and the model was developed. The model is capable of predicting jet fire influence area with comprehensive input parameters, such as burial depth. The model was calibrated and verified by the historic accident data from Edison Township, New Jersey, the United States. The statistical model was also developed to compare the results of the model in this study and the existing OGP model. They were in good agreement with respect to damage predictions, such as radiation heat coming from 10 meters away from the heat source of gas flame.
초광대역 임펄스를 이용한 비파괴 지중 매설물 탐지용 지반 탐사 레이더(Ground penetrating image radar: GPR)를 개발하였다. 최대 탐사 깊이를 고려하여, 900 picosecond(ps) 상승 시간을 갖는 초광대역 임펄스를 설계하였고, 임펄스 발생기의 주파수 특성을 고려하여, 소형 평판형 다이폴 안테나가 설계되었다. 또한, 지중으로부터 반사되는 신호를 수신하기 위해서 고속의 A/D를 사용하였다. 측정은 송수신 안테나의 간격을 고정한 Bistatic 방식을 사용하였으며, 지중 매설물의 영상처리 판별을 위해 마이그레이션(migration) 기법을 사용하였다. 개발된 시스템은 금속 물체와 비금속 물체가 매설된 실증 시험장에서 시험되었고, 평면 해상도 및 깊이에 대한 해상도가 우수함을 보였다.
지중배전관로공사 설계시 고려할 사항은 지중배전관로 공수산정, 적정관로 선정, 매설위치 및 매설깊이, 관재의 선정, 관로의 경간, 관로배열 등이 고려되어야 한다. 관로공사비는 굴착깊이와 굴착폭에 의해 산정되고 이는 관로배열, 굴착지반의 토질에 따른 굴착구배, 용수여부, 도로관리기관의 조례, 다짐정도, 작업환경, 작업시간 등에 의해 변화하게 된다. 이런 현장조건 들은 설계자가 바꿀 수 없는 요소이지만 관로배열을 어떤 형태로 하여 매설할지는 설계자가 정하여야 한다. 본 연구에서는 경제적인 관로배열을 선정하기 위해 관로공수별, 관로유형별 공사비를 산출하여 비교 검토하였고 현장에서의 공사시공성, 케이블의 허용전류 등을 종합적으로 고려하여 최적의 관로배열을 제시하였다.
Song Yoonho;Park Sam Gyu;Seol Soon Jn;Choi Seong-Jun;Chung Seung-Hwan
한국지구물리탐사학회:학술대회논문집
/
2001.09a
/
pp.122-140
/
2001
We have applied the geophysical survey, mainly electric and electromagnetic (EM) methods, to a test site contaminated by hydrocarbon waste disposal and local spill. The multi-frequency, moving source & receiver EM survey along with ground penetrating radar (GPR) showed a fairly good performance in detection of buried metal pipes and objects. Magnetic survey measuring vertical and horizontal gradients were so sensitive to the small metallic objects spread over the surface that it's hard to discriminate the buried pipe. We chose electrical resistivity, EM and GPR survey to examine the soil contamination. Depth slices of resistivity distribution as the results of the inversion of resistivity and EM data coincided each other and closely matched the contaminated area determined by chemical analysis of the soil samples. GPR images did not show the reflection events related with contamination plume since there are no distinct spill in this site. We inferred the contamination using the penetration depth of the GPR energy, which could be used as auxiliary information to the resistivity and EM results. We summarized the applicability of each survey methods based on this results and proposed a desirable survey scheme for the determination of hydrocarbon contaminated site.
Journal of the Korea Academia-Industrial cooperation Society
/
v.13
no.5
/
pp.2368-2373
/
2012
In this research, finite element method was carried out to evaluate the defomation of pipe and surface displacement for backfill of underground ficility. Various conditions for analysis were employer, including two different pipes(PE and concrete pipe), two different excavation depth(60cm and 150cm) and width(1.5D and 2D), a regular sand backfill, and four different flowable backfills. The vertical deformation of 60 cm diameter for PE was measured three times more than that of 30 cm diameter. The measured deformations for regular backfill and four flowable backfills were 0.320mm, and 0.135mm to 0.155mm, respectively. It ratio was around 40%. In case of 30cm diameter of concrete pipe, the measured vertical defomation was around 0.004mm for all the backfill materials. In case of installation depth, the effect of flowable backfill for flexible pipe is better than for rigid pipe. There is little effect on the deformation of concrete pipe with regular sand backfill and flowable backfill.
The safety and structural integrity of buried pipes are usually at risk from constructing loading and compaction of backfill materials. The backfill material should be strong enough to help resistance and redistribute loads so that the buried pipe remains unaffected. Due to the many problems associated with buried pipes, there have been multiple studies on the development of a sustainable backfill material. In this study, a Controlled Low Strength Material made of coal ash was considered as a buried pipe backfill material. To determine the feasibility and performance of this backfill material, a numerical simulation was conducted with the results confirmed by a field test. Results showed maximum settlement to be 2 mm with the elastic strain of the buried pipe to be about 0.006.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.24
no.5
/
pp.37-43
/
2010
When lightning surges with wide frequency spectrum and power converting devices are considered, it is desirable to evaluate grounding system performance by grounding impedances. This paper presents the measured results for frequency-dependent grounding impedance for the vertical grounding electrode and counterpoise on a scale of full size. Grounding impedances of vertical grounding electrodes and counterpoises give capacitive or inductive behaviors according to the length of grounding electrodes and soil resistivity. It is inefficient to extend the length of the grounding electrode in order to decrease the ground resistance, and when designing the grounding system, the consideration of the grounding impedance should be desirable. In order to reduce the grounding impedance of counterpoise, the grounding conductors are jointed at the center of counterpoises. It is effective to reduce the grounding impedance by connecting ground rods to counterpoises in parallel.
본 연구에서는 도로 교통 정보검출을 위하여 사용되는 검지기 가운데 비매설형 차량검지 기술에 대한 분석을 통하여 국내환경에 적합한 검지기술의 기본 기능을 설정하였다. 분석된 검지기는 15개의 국내외 검지시스템으로 검지 성능 분석과 국내 적용시 발생되는 문제점을 파악하여 설계시 필요한 기본 계획을 설정하였다.
Dipole-dipole resistivity and ground penetrating radar(GPR) surveys were performed on an abandoned landfill site filled with asbestos containing material. The main purpose of the study was to estimate spatial extension and volume of the landfill for evaluting the cost for developing appropriate remedial alternatives. Assuming that the bedrock is within 10 m depth, dipole spacings of 2, 2.5 and 5m were set for six survey lines for resistivity measurements. For More detailed information, GPR suvey using 225 Mhz antenna was carried out for twelve survey lines for the shallower information. DC resistivity structures showed few tens ~ hundreds ohm-m for the landfill or alluvial laver, and 1,000~ 5,000 ohm-m for the bedrock. The depth to bedrock is found out to be approximately 5m. GPR survey results represented very clear reflection and/or diffraction events from the boundaries as well as from the blocky construction
wastes. With high-resolution GPR survey, depth of the bedrock was resolved up to 2m, which in turn, could be a good indicator for estimating the volume of the landfill. Those depths of bedrock were confirmed by backhoe excavation data for 13 sites. The total area and volume of the landfill were to be approximately 3,953 .$m^2$ and 4,033 $m^3$, respectively.
Proceedings of the Korea Water Resources Association Conference
/
2007.05a
/
pp.542-545
/
2007
터널의 노면 양쪽에 관로를 설치하여 유입된 지하수를 배출시키는 방법은 일반적인 터널 배수공법이지만 배수관로의 설치를 위한 추가적인 굴착은 공사기간과 공사비의 상승으로 이어지는 실정이다. 이에 터널 내에 별도의 배수관로 굴착 없이 노면 하부에 다열기둥을 일정 간격으로 매설하여 지하수의 흐름방향을 노면 하부로 유도시키는 경제적인 배수시스템이 현재 연구 중이다. 이 터널배수시스템은 추가적 굴착이 없어 기존의 배수시스템보다 경제적이지만 다열기둥의 연속적인 배치를 필요로 하므로 기존의 관로배수방식보다 더 많은 유체의 흐름저항을 받게 된다. 따라서 유체의 흐름에 효율적인 다열기둥 간의 배치간격에 대한 연구가 필요하다. 그래서 본 연구에서는 노면 하부에 다열기둥이 매설된 터널 내로 유입하는 지하수 배출을 목적으로 다열기둥 간의 배치간격에 따른 Manning계수의 변화를 수리실험을 통해 측정 분석하였다. 특히 Manning계수는 개수로에서 유체흐름 저항의 정도를 파악하는 데 이용되는 인자로 이를 활용하여 지하수 배수에 적절한 다열기둥 배치간격을 산정하였다. 본 연구를 통해 얻어진 수리실험 자료는 노면하부에 다열기둥을 매설하는 터널공사의 실제 설계를 위한 기초적인 참고자료로 사용될 것으로 기대된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.