A case study on perforation under Daejeon station building by Front-Jacking method (Front-Jacking공법에 의한 대전역사 하부 관통사례)

  • Kim, Yong-Il;Hwang, Nak-Yeon;Jeong, Du-Seok;Cha, Jong-Hwi;Lee, Nae-Yong
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2006.03a
    • /
    • pp.195-203
    • /
    • 2006
  • The crossing construction under railroad have two methods which are cut and cover and trenchless method. first, cut and cover method is an extremely limited method concerning non-running time. Whereas, trenchless method is free from restriction such as train speed and running time, and has the strong points of safe and rapid construction. Front Jacking method, one of the trenchless methods, is frequently applied recently due to its stability during construction and vantage of assuring schedule reliability. The procedure is that after minimizing interlocking friction with structure and earth pressure due to jacking the small steel tube, pulling the precast box manufactured at the field in the ground using PC strand and hydraulic Jack. This method is able to be applied regardless of section size and length of box and condition of ground. And that is also pro-environmental. This paper presents the case of Daejeon E. W. perforate Road Project applied with the Front Jacking method.

  • PDF

Development of Long-Distance Subsea Cable Uninterrupted Laying Method and Equipment for the Construction of Power System In Island (도서지역 전력계통 구성을 위한 장거리 해저케이블 비개착 포설 공법 및 장비개발)

  • Lee, Jaedeuk;Park, Changyong
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.227-231
    • /
    • 2021
  • 해저케이블 설치시 고비용, 민원발생, 환경오염 논란 등의 이슈가 많은 개착식 공법을 대신하여 현장에서 점차 친환경적 공법으로 자리 잡고 있는 비개착식 공법을 이용한 전력설비 건설이 활발하게 논의되고 있다. 본 논문에서는 이런 새로운 시도를 위해 필수적인 장거리 케이블 포설에 대한 새로운 방법을 현장실증을 통한 Data 확보 및 장비개발로 새롭게 제시하였다. 케이블 포설시 밀어주는 장비인 Pusher, 기존의 윈치와 Pusher 의 속도를 동기화시키는 장치 및 케이블을 꼬임없이 당기기 위한 다도체용회전형풀링아이 등을 개발하여 기존에 설치하였던 해저용특수케이블이 아닌 현재 일반적으로 사용중인 케이블의 포설가능 거리를 증가시켜 도서지역 전력공급 등을 위한 장거리케이블 포설에 비개착식 방식이 적용 가능 토록 새로운 케이블 포설공법을 개발하였다.

A Case Study on Construction of Front-Jacking method in Daejeon E.W. perforate Road Project (대전 동서관통도로 Front-Jacking공법 시공사례)

  • Kim Yong-Il;Hwang Nak-Yeon;Cha Jong-Whi;Jang Sung-Wook;Lee Nai-Yong
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.646-654
    • /
    • 2005
  • The crossing construction under railroad have two methods which are cut and cover and trenchless method. First, cut and cover method is an extremely limited method concerning non-running time. Whereas, trenchless method is free from restriction such as train speed and running time, and has the strong points of safe and rapid construction. Front Jacking method, one of the trenchless methods, is frequently applied recently due to its stability during construction and vantage of assuring schedule reliability. The procedure is that after minimizing interlocking friction with structure and earth pressure due to jacking the small steel tube, pulling the precast box manufactured at the field in the ground using PC strand and hydraulic Jack. This method is able to be applied regardless of section size and length of box and condition of soil. And that is also pro-environmental. This paper presents the case of Daejeon E. W. perforate Road Project applied with the Front Jacking method.

  • PDF

Development of Trenchless Tunneling Method Using Pressurizing Support and Its Field Application (가압식 지보를 이용한 비개착 터널공법 개발 및 현장적용 사례)

  • Kim, Dae-Young;Lee, Hong-Sung;Sim, Bo-Kyoung
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.7
    • /
    • pp.17-30
    • /
    • 2012
  • A new trenchless tunneling method using pressurizing support has been developed. As it overcomes shortcomings of conventional methods, it is applied to the field. The main concept of the new method is the pressurization system which, by means of pressurization bag between outer flange of steel ribs and excavated perimeter, applies the pressure corresponding to the magnitude of the relaxed earth pressure caused by excavation to the ground to prevent ground displacement. The stability of the support members and effect of displacement control of the new method were verified through several ways such as numerical tests and various model tests. The new method was applied to the construction of a 10.7 m wide, 7.9 m high and 85 m long road tunnel that passes under Yeongdong Expressway. By applying the new method, the tunnel construction was successfully completed in 13.5 months. It decreases the construction period to 35% compared to that of conventional methods, and ground displacement was almost negligible.

An Experimental Study on the Trenchless Construction Method For Small Diameter Cable Conduits (소구경 비개착 관로건설 기술연구)

  • Seo, Dong-Seob
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2005.08a
    • /
    • pp.217-221
    • /
    • 2005
  • 도시의 기능이 날로 커져가고 땅속 지하매설물은 포화상태에 이르렀다. 또한 시민들의 의식 수준이 높아가면서 도시에서의 굴착시공은 민원유발과 교통소통장애 문제로 날로 어려워지고 있는 것이 현실이다. KT에서는 무인 및 유인 통신구를 건설할 수 있는 장비를 이미 개발한바 있으며, 본 연구를 통해 도심지에서 보다 효율적으로 통신관로 ${\Phi}50mm,\;{\Phi}150mm,\;{\Phi}300mm$를 시공할 수 있는 장비를 개발하게 되었다. 도시는 복잡하기 때문에 비개착 시공에 있어서 시공 점용면적이 상대적으로 많을 경우 어려움을 겪게된다. 소구경 비개착 장비인 XS-300은 길이 1.45m 폭 0.8m 높이 0.97m 이며 중량은 700kg인 소형장비인 것이 특징이다. XS-300은 도심지에서 통신맨홀 터파기 부분을 압입구로 활용할 수 있으며 경제적인 비용으로 개착식 시공이 불가한 구간에 대한 인입관로 구성과 지하장애물 하월시공, 도로횡단 시공 시에 적합한 장비이다. 특히 타 시설물을 관통한 불량통신시설과 재해에 취약한 통신시설에 대해 안전하고 경제적인 비용으로 이설시공을 할 수 있으며 통신인프라 기초시설 안정화 및 품질고도화에 기여할 수 있을 것이다.

  • PDF

Seismic analysis and dynamic behavior characterization of rib-reinforced pre-cast tunnels (리브 보강 프리캐스트 터널의 내진 해석 및 동적거동 특성 파악)

  • Song, Ki-Il;Jung, Sung-Hoon;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.3
    • /
    • pp.287-301
    • /
    • 2009
  • The novel cut-and-cover tunnel construction method using rib-reinforced pre-cast arch segments has been recently developed and applied for practice to secure a structural stability of high covering and wide width section tunnels. Cut-and-cover tunnels are usually damaged by the seismic behavior of backfill grounds in case of a low covering condition. Seismic analyses are performed in this study to characterize the dynamic behavior of rib-reinforced pre-cast arch cut-and-cover tunnels. Seismic analyzes for 2 lane cast-in-place and rib-reinforced pre-cast arch cut-and-cover tunnels are carried out by using the commercial FDM program (FLAC2D) considering various field conditions such as the covering height embankment slope and excavation slope. It can be concluded that the amplification of seismic wave is reduced due to an increase in the structural stiffness induced by rib-reinforcement. The results show that the rib-reinforced pre-cast arch cut-and-cover tunnels are more effective against the seismic loading, compared to the cast-in-place cut-and-cover tunnels.

Restoration Efficiency Analysis of Expansive Material Implemented Trenchless Underground Cavity Restoration Method Varying Number and Location of Bore Holes (팽창재료를 이용한 지하 공동 비개착 복구공법에서 천공 개수 및 위치에 따른 복구효율 분석)

  • Choi, Byeong-Hyun;Lee, Kicheol;Lee, Junwon;Kim, Dongwook
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.4
    • /
    • pp.25-37
    • /
    • 2019
  • The conventional representative underground cavity restoration methods, which are mainly open-cut methods, require high cost and long period of time for the restoration. Therefore, various trenchless restoration methods have been proposed to improve these disadvantages. The underground cavity restoration method using the expansive material proposed in this paper is one of the trenchless methods. This method fills the underground cavity with high quality backfill soils through the small hole(s) at asphalt layer and compacts backfill soils by insertion of the expansive material within the cavity. In this study, the restoration method using expansive material was constructed in acrylic chamber. The restoration efficiency of the method was analyzed by the fill ratio and degree of relative compaction according to the location and number of bore holes. As a result of the experiment, the restoration efficiency and the optimum construction location were found to be irrelevant.