• Title/Summary/Keyword: 붕괴방지

Search Result 239, Processing Time 0.026 seconds

A Study on Stability of Levee Revetment in Meandering Channel (만곡수로 내의 호안 안정성 연구)

  • Kim, Sooyoung;Yoon, Kwang Seok;Kim, Hyung-Jun
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.12
    • /
    • pp.1077-1087
    • /
    • 2015
  • The levee protect lifes, houses, and properties by blocking overflow of river. The revetment is forced to be covered on the slope of levee in order to prevent erosion. The stability of revetment is very important enough to directly connected to the stability of levee. In this study, the weak points of revetment on meandering channel were found by movable revetment experiment and the velocity and the water surface elevation (WSE) were measured at main points. The 3-D numerical simulations were performed under same conditions with experiment. And unclear flow characteristics by the limit of measuring instruments were analyzed through numerical simulation. Consequently, the section of large wall shear stress and the failure section are almost the same. Despite of small wall shear stress, the revetments located at right bank were carried away because of circulation zone due to secondary flow by meandering. With existing riprap design formula, the sizes of riprap determined using maximum local velocity were 1.5~4.7 times greater than them using mean velocity. As a result of this study, it is necessary to calculate the size of riprap in other ways for meandering and straight channel. At a later study, if the weighted value considered the radius of curvature and shape of hydraulic structure is applied to riprap design formula, it is expected that the size of revetment was evaluated rationally and accurately.

Performance Factors for Delaying Slope Failure through Hydraulic Experiments of Dam Overtopping (댐 월류 수리실험을 통한 사면붕괴지연 성능인자 도출)

  • Sung Woo, Lee;Dong Hyun Kim;Seung Oh Lee
    • Journal of Korean Society of Disaster and Security
    • /
    • v.17 no.2
    • /
    • pp.1-11
    • /
    • 2024
  • Most reservoirs in South Korea are earthen dams, mainly because they are cost-effective and easy to construct. However, earthen dams are highly vulnerable to seepage and overtopping, making them prone to sudden failure during excessive flooding. Such sudden failures can lead to a rapid increase in flood discharge, causing significant damage to downstream rivers and inhabited areas. This study investigates the effect of riprap placement on the slopes of earthen dams in delaying dam failure. Delaying the failure time is crucial as it allows more time for evacuation, significantly reducing potential casualties, which is essential from a disaster response perspective. Hydraulic experiments were conducted in a straight channel, using two different sizes of riprap for protection. Unlike previous studies, these experiments were performed under unsteady flow conditions to reflect the impact of rising water levels inside the dam. The target dam for the study was a cofferdam installed in a diversion tunnel. Experimental results indicated that the presence of riprap protection effectively prevented slope failure under the tested conditions. Without riprap protection, increasing the size of the riprap delayed the failure time. This delay can reduce peak discharge, mitigating damage downstream of the dam. Furthermore, these findings can serve as critical reference material for establishing emergency action plans (EAP) for reservoir failure.

Improvement of Seismic Performance Evaluation Method for Concrete Dam Piers by Applying Collapse-Level Earthquake(CLE) (붕괴방지수준(CLE)을 적용한 콘크리트 댐 피어부 내진성능평가 방안 개선)

  • Jeong-Keun Oh;Yeong-Seok Jeong;Min-Ho Kwon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.1
    • /
    • pp.1-11
    • /
    • 2024
  • The purpose of this paper is to suggest a method for applying a reasonable dam axial seismic load loading method and load-bearing capacity evaluation method in the dynamic analysis of the pier part of a concrete dam to which the seismic force of the collapse prevention level is applied. To this end, the pier part of a concrete dam was selected as a target facility, and the characteristics of the dynamic behavior in the axial direction of the weir dam were analyzed through dynamic analysis applying various weir widths, and 'U.S. The load-bearing capacity evaluation was performed by applying the RC hydraulic structure evaluation technique suggested by the Army Corps, 2007'. As a result of the study, when applying seismic force in the axial direction of the pier part, it is more realistic to assume that the axial direction of the weir part dam behaves as a rigid body and 'U.S. Army Corps, 2007' suggested that the method of reviewing the load-bearing capacity for moment and shear was considered reasonable, so it was concluded that improvement of the current evaluation method was necessary. If the improvement of the research result is applied, it will have the effect of deriving more reasonable evaluation results than the current seismic performance evaluation method using CLE. It is judged that additional research is needed in the future on the torsional moment occurring in the pier part.

Evaluation of Structural Performance for High Strength Rockfall Protection Fence according Reinforcement of H-Beam using Numerical Analysis (수치해석을 통한 지주 보강에 따른 고강도 낙석 방지울타리 구조성능 평가)

  • Hyunwoo Jin;Sanghoon Seo;Duho Lee;Youngcheol Hwang
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.1
    • /
    • pp.25-36
    • /
    • 2023
  • In Korea, the rockfall prevention fence is designed with 50kJ of rockfall kinetic energy in order to prevent damages such as falling rocks and landslides. In the case of rockfall kinetic energy, it is highly dependent on the shape of the slope on which it occurs. As a previous study, a fence performance evaluation was conducted for 100kJ rockfall impact energy using ETAG 27. However, previous studies have focused on newly installed rockfall prevention fences. In this study, a reinforcing materials was installed on the existing rockfall prevention fence through numerical analysis, and the structural performance of the high-strength rockfall prevention fence capable of defending against 120kJ of rockfall kinetic energy was evaluated.

A Special Purpose FE Program for the Collapse Strength Analysis of Bulk Carrier Corrugated Bulkheads Subject to Accidental Flooding (침수시 산적화물선 파형 횡격벽 붕괴강도해석 전용 유한요소 프로그램 개발)

  • Jeom-Kee Paik;Sung-Geun Kim
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.35 no.2
    • /
    • pp.63-73
    • /
    • 1998
  • Due to the collapse of corrugated bulkheads subject to accidental flooding which is thought to be a primary cause of bulk carrier losses International Maritime Organization(IMO), the International Association of Classification Societies(IACS) and the leading classification societies are taking a growing concern for the structural safety of corrugated bulkheads of bulk carriers. To prevent progressive collapse of corrugated bulkhead in flooded condition particularly of forward cargo ho1d they try to make rules which require reinforcement of corrugated bulkhead structure. However, we are still confronted with the urgent problem of more accurate and efficient ultimate strength assessment for corrugated bulkheads. This paper develops a special purpose nonlinear FE program for analyzing progressive collapse behavior of corrugated bulkheads subject to lateral pressure loads. As verification examples, the program is applied to collapse strength analysis of steel corrugated bulkhead test model.

  • PDF

A Study of Real Scale Experiment on Protection Technique of Levee Overflow Failure Using Mixed Bio-Polymer and Riprap (피마자유기반 바이오폴리머와 골재를 혼합한 제방월류 보강제 실규모 실험연구)

  • Joongu, Kang;Hong-Kyu, Ahn
    • Ecology and Resilient Infrastructure
    • /
    • v.10 no.1
    • /
    • pp.1-10
    • /
    • 2023
  • Developmental technique is mixed bio-polymer and riprap to protect the breaking of a levee. Purpose of new technique is restraint from scour and failure of bankside. Technique of this research can apply shore protection and embankment overflow reinforcement works. Because This technique is easy for construction. In order to apply the technique in fields, It is need to conduct the test-bed or real scale experiment study for stability-guaranteed. In case of embankment overflow reinforcement works, It is difficult to conduct test bed in the field. Real scale experiment was conducted in River Experiment Center. Purpose of real scale experiment is to reappear disaster scene by embankment overflow and verify restraint from scour and failure about the technique. In this experiment results, We can find the strength effect of mixed bio-polymer and riprap.

Study on Risk Priority for TBM Tunnel Collapse based on Bayes Theorem through Case Study (사례분석을 통한 베이즈 정리 기반 TBM 터널 붕괴 리스크 우선순위 도출 연구)

  • Kwon, Kibeom;Kang, Minkyu;Hwang, Byeonghyun;Choi, Hangseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.785-791
    • /
    • 2023
  • Risk management is essential for preventing accidents arising from uncertainties in TBM tunnel projects, especially concerning managing the risk of TBM tunnel collapse, which can cause extensive damage from the tunnel face to the ground surface. In addition, prioritizing risks is necessary to allocate resources efficiently within time and cost constraints. Therefore, this study aimed to establish a TBM risk database through case studies of TBM accidents and determine a risk priority for TBM tunnel collapse using the Bayes theorem. The database consisted of 87 cases, dealing with three accidents and five geological sources. Applying the Bayes theorem to the database, it was found that fault zones and weak ground significantly increased the probability of tunnel collapse, while the other sources showed low correlations with collapse. Therefore, the risk priority for TBM tunnel collapse, considering geological sources, is as follows: 1) Fault zone, 2) Weak ground, 3) Mixed ground, 4) High in-situ stress, and 5) Expansive ground. In practice, the derived risk priority can serve as a valuable reference for risk management, enhancing the safety and efficiency of TBM construction. It provides guidance for developing appropriate countermeasure plans and allocating resources effectively to mitigate the risk of TBM tunnel collapse.

Seismic performance evaluation of middle-slab vibration damping rubber bearings in multi-layer tunnel through full-scale shaking table (실대형 진동대 시험을 통한 복층터널 중간 슬래브 진동 감쇠 고무받침 내진성능 평가)

  • Jang, Dongin;Park, Innjoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.337-346
    • /
    • 2020
  • Traffic jam and congestion in urban areas has caused the need to improve the utility of underground space. In response, research on underground structures is increasingly being conducted. Notably, a double-deck tunnel is one of the most widely used of all those underground structures. This double-deck tunnel is separated by the middle slab into the upper and lower roadways. Both vehicle load and earthquake load cause the middle slab to exhibit dynamic behavior. Earthquake-related response characteristics, in particular, are highly complex and difficult to interpret in a theoretical context, and thus experimental research is required. The aim of the present study is to assess the stability of a double-deck tunnel's middle slab of the Collapse Prevention Level and Seismic Category 1 with regard to the presence of vibration-damping Rubber Bearings. In vibration table tests, the ratio of similitude was set to 1/4. Linings and vibrating platforms were fixed during scaled model tests to represent the integrated behavior of the ground and the applied models. In doing so, it was possible to minimize relative behavior. The standard TBM cross-section for the virtual double-deck tunnel was selected as a test subject. The level of ground motion exerted on the bedrock was set to 0.154 g (artificial seismic wave, Collapse Prevention Level and Seismic Category 1). A seismic wave with the maximum acceleration of 0.154 g was applied to the vibration table input (bedrock) to analyze resultant amplification in the models. As a result, the seismic stability of the middle slab was evaluated and analyzed with respect to the presence of vibration-damping rubber bearings. It was confirmed that the presence of vibration-damping rubber bearings improved its earthquake acceleration damping performance by up to 40%.

안전관리 - "재해! 사전대비가 최선" 장마철.혹서기 건설현장 안전보건 관리대책

  • 한국산업안전보건공단
    • 월간 기계설비
    • /
    • s.228
    • /
    • pp.64-73
    • /
    • 2009
  • 건설현장의 안전사고는 안전불감증과 허술한 재난관리시스템으로 인한 인재(人災)가 대부분이다. 따라서 여름 장마철과 혹서기에 대비, 현장의 감전사고 및 침수 붕괴재해 예방, 그 밖의 수해방지대책 등을 수립해 현장근로자에게 사전교육을 철저히 하는 것이 재해예방의 첫걸음이다. 특히 재난관리시스템 및 매뉴얼을 구축한 뒤 재난 유형과 상활별 시나리오를 구성, 이를 바탕으로 사전교육과 모의훈련을 통해 긴급조치 및 대피계획을 수립 실시하는 등 구체적인 재해대책 요령을 숙지하면 재해를 줄일 수 있다. 본지는 회원사의 공사안전에 참고가 되도록 한국산업안전보건공단에서 제공한 장마철 혹서기 건설 현장 안전지침을 게재한다.

  • PDF

채종원관리도로 성력화를 위한 연구 -친환경적 횡단목배수로의 적용 가능성에 대한 검토-

  • 이성기;김종한;이갑연;이성규;김태구
    • Proceedings of the Korean Environmental Sciences Society Conference
    • /
    • 2004.05a
    • /
    • pp.137-140
    • /
    • 2004
  • 채종원관리를 효율적으로 관리하기 위하여 시설되는 저 규격도로는 대부분 비포장상태로 이용되는 경우 많다. 이는 강우에 의한 침식붕괴로 하류의 산림식생환경 및 수질환경 오염으로 연결될 위험성이 내포되어 있어 적절한 방법으로 사전에 방지할 필요가 있다. 본 연구에서는 환경과 친화적인 재료를 최대한 이용하여 개발된 목배수로를 내구성 강화를 검토하였던바 섬유질 포의 조절과 고무질의 성능 조절에 의한 검토로 현장에의 적용이 가능하였다.

  • PDF