• Title/Summary/Keyword: 불확실성 관리

Search Result 834, Processing Time 0.049 seconds

Stochastic Disaggregation and Aggregation of Localized Uncertainty in Pavement Deterioration Process (포장파손과정의 지역적 불확실성에 대한 확률적 분해와 조합)

  • Han, Daeseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1651-1664
    • /
    • 2013
  • Precise analysis on deterioration processes of road pavements is not so simple matter due to severe uncertainty originated from a lot of explanatory variables engaged in. For those reasons, most analytical models for pavement deterioration prediction have often preferred to probabilistic approaches than deterministic models. However, the general probabilistic approaches that treat overall characteristics of population or entire sample would not be suitable for providing detail or localized information on their changing process. Considering the aspects, this paper aimed to suggest a stochastic disaggregation method to analyze the localized deterioration speeds and its variances changed by time and condition states. In addition, life expectancies and their uncertainty were estimated by probabilistic algorithm using the disaggregated stochastic process. For an empirical study, pavement inspection data (crack) accumulated from 2003 to 2010 from Korean national highway network was applied. This study can contribute to securing reliability of life cycle cost analysis, which is one of the primary analyses in road asset management, with much advanced deterioration forecasting functions. In addition, it would be meaningful trials as fundamental research for preventive maintenance strategy that demands essential understanding on changing process of the deterioration speed of pavement.

Parameter Optimization and Uncertainty Analysis of the Rainfall-Runoff Model Coupled with Hierarchical Bayesian Inference Scheme (Hierarchical Bayesian 기법을 통한 강우-유출모형 매개변수의 최적화 및 불확실성 분석)

  • Mun, Yeong-Il;Gwon, Hyeon-Han
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.1752-1756
    • /
    • 2007
  • 정교한 강우-유출 모의를 위해서는 적절한 매개변수의 추정이 필수적이며, 매개변수 추정 방법은 시행착오(trial and error)에 의한 수동보정법과 최적화방법을 사용한 자동보정법으로 구분할 수 있다. 모형의 매개변수의 수가 많은 경우 수동보정법에 의한 매개변수 추정은 매우 어렵다. 자동 보정법에 사용되는 최적화방법은 Rosenbrock 알고리즘, patten search, 컴플렉스(complex) 방법, Powell 방법 등과 같은 지역최적화 방법과 전역최적화 방법으로 나눌 수 있다. 그러나 기존 방법론들은 매개변수의 최적화를 추적하기 위한 알고리즘이 대부분이며 이들 매개변수에 관련된 불확실성을 평가하는데는 미흡한 단접이 있다. 이러한 점에서 본 연구에서는 강우-유출모형의 매개변수 추정에 있어서 불확실성을 평가할 수 있는 새로운 방법론을 검토하고자 한다. 매개변수와 관련된 불확실성을 평가하기 위한 방법은 여러 가지가 있으나 통계적으로 매우 우수한 능력을 보이는 Hierarchical Bayesian 알고리즘을 Probability-Distributed 강우-유출 모형에 적용하였다. 본 방법론은 최적화와 동시에 각 매개변수에 관련된 사후분포(posterior distribution)의 추정이 가능하므로 모형이 갖는 불확실성을 효과적으로 평가할 수 있다. 따라서, 수자원 관리에 있어서 불확실성을 고려할 수 있으므로 보다 수리수문학적 위험도를 저감할 수 있을 것으로 판단된다.

  • PDF

A Study on the Implementation of Direct Load Control Resource (직접부하제어자원의 활용방안에 대한 연구)

  • Kim, Jin-Ho;Park, Jong-Bae;Park, Jong-Keun
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.606-608
    • /
    • 2003
  • 경쟁적인 전력시장에서의 전력 가격은 전력에 대한 수요(Demand)와 공급(Supply)에 의한 시장원리에 의해 결정되기 때문에, 매 시각의 전력가격은 정해져 있지 않고 시장에 의해 결정된다. 이와 같이 전력가격이 가지는 가변성 및 불확실성(Volatility) 때문에 향후 전력 시장에 참여하는 사업자의 수입(Revenue) 및 수익 규모의 불확실성이 커지는 한편, 전력을 사용하는 소비자의 에너지비용도 그 불확실성이 매우 크게 증가하게 마련이다. 이러한 전력가격의 가변성(Volatility)과 불확실성(Uncertainty)이 대두됨에 따라, 외국의 경우, 가정용 부하와 같은 소규모 전력소비자를 제외한 대부분의 대규모 소비자(산업용, 상업용, 일반용 전력소비자)들은 전력가격이나 자신이 사용하고 있는 전력의 소비패턴과 같은 정보(Information)와 전략(Strategy)이 없는 경우, 예전에 비해 상당히 높은 전기요금을 지불해야 하는 상황에 처하게 되었다. 본 논문에서는 이러한 경쟁적 환경에서 직접부하제어자원을 활용하여 비용 및 위험을 관리하는 해외사례를 집중적으로 분석하고자 한다.

  • PDF

A Study on the Uncertainty of Radar Rainfall Estimation (레이더 강우추정의 불확실성에 대한 고찰)

  • Noh, Huiseong;Lee, Dong-ryul;Jang, Bong-joo;Han, Myeong-sun;Hwang, Seok Hwan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.220-220
    • /
    • 2016
  • 최근 국지적 기상변화에 따른 도시 산악지역의 돌발홍수 발생빈도가 증가함에 따라 위험기상 관측 및 홍수의 사전감지 대응에 대한 관심과 필요성이 증대되고 있다. 이에 발맞춰 국토교통부 및 기상청 등에서는 이중편파레이더를 설치 운영 중에 있으며, 이를 이용한 정량적 레이더강수량 추정 및 예측에 대한 연구가 활발히 진행 중이다. 레이더를 이용한 정량적 강우추정을 위해서는 레이더관측, 신호처리, 품질관리(QC), 강우추정 알고리즘 적용, 보정 등 일련의 과정을 거치게 되며, 이러한 과정 속에서 다양한 불확실성 요소가 존재하기 때문에 레이더자료의 정확도에 대한 평가가 요구되고 있다. 그러나 레이더강우량의 불확실성이 어느 정도 수준인지 정량적으로 제시하기는 어려우며, 그 기준 또한 모호하다. 따라서, 본 연구에서는 총 25개 강우사상(2012 ~ 2014년)을 대상으로 비슬산강우레이더 관측자료와 관측영역 내 지상강우자료를 이용하여, 누적강우량, 평균차, 상대분산, 변동계수 등을 통해 레이더강우의 정량적인 불확실성을 요약 제시하고자 하였다. 본 연구는 레이더강우의 정량적인 불확실성을 파악할 수 있는 기초적인 과정이며, 도출된 연구결과는 현재 레이더강우 추정의 수준을 파악하고 추후 레이더강우의 개선 수준을 비교 검토 할 수 있는 자료로 활용이 가능할 것으로 판단된다.

  • PDF

A Study on Periodic Buffer Allocation for Program Master Schedule (프로그램 공정계획을 위한 주기적 버퍼 설치에 관한 고찰)

  • Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.81-87
    • /
    • 2001
  • In a dynamically changing environment, the manager of a maintenance and remodeling (M/R) program is confronted with an increasing complexity of coordinating and cooperating multi-resource constrained multiple projects. The root causes of the complexity, uncertainty and interdependence, cause an internal disruption of an activity and chain reactions of disturbance propagation that deteriorate the stability and manageability of the program. This paper evaluates previous endeavors to apply production control and management techniques to the construction industry, and investigates the possibility of applying other management concepts and theories to organizational program management. In particular, this paper proposes a buffer allocation model by which periodic buffers are allocated in the flows of program constraint resources to stabilize a program master schedule instead of protecting individual activities. Comparative experiments by Monte Carlo simulations illustrate improved performance of the proposed model in terms of program's goals: productivity, flexibility, and long-term stability.

  • PDF

A Fuzzy-based Risk Assessment using Uncertainty Model (불확실성 모델을 사용한 퍼지 위험도분석)

  • Choi Hyun-Ho;Seo Jong-Won;Jung Pyung-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.473-476
    • /
    • 2003
  • This paper presents a systematic risk assessment procedure with uncertainty modeling for general construction projects. Since the approach is able to effectively deal with all the related construction risks in terms of the assumed probability with conditional probability concept that systematically incorporate expert's experiences and subjective judgement, the proposed methods with uncertainty modeling is able to apply to all the construction projects inherent in lots of uncertain risk events. The fuzzy set theory is adopted to enhance risk assessment to effectively handle the vague and dynamic phenomenon of an event Therefore, the fuzzy-based risk assessment is very useful, for those countries, such as Korea, where objective probabilistic data for risk assessment is extremely rare, and thus the utilization of subjective judgmental data based on expert's experiences is inevitable.

  • PDF

A Study on Uncertainty in the Probable Precipitation According to Precipitation Recording Methods (강수량 기록방식에 따른 확률강수량 산정의 불확실성 고찰)

  • Heeseong Park;Hyoung Seop Kim
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.259-259
    • /
    • 2023
  • 강수량자료는 기초 수문자료의 하나로서 자료 수집시 기록방식에 따라 자료의 정확도가 달라질 수 있다. 주로 많이 사용되는 기록방식은 정시 기록방식이지만 실제 강수계에서는 강수이벤트의 기록이 먼저 이루어진다. 정시 기록 방식은 관측을 하기로 정해 놓은 시각(정시)에 강수계에 집계된 강수량을 읽어 그대로 기록하는 방식이고, 강수이벤트의 기록은 최저관측해상도에 도달하는 강수가 발생한 시각을 기록하는 방식이다. 동일한 강수가 발생하더라도 기록 방식에 따라 이후에 분석에서 다른 결과를 보여줄 수 있다. 특히 확률강수량 산정에 불확실성을 키우는 방향으로 영향을 줄 수 있다. 이에 본 연구에서는 이러한 기록방식에 따른 불확실성을 분석하기 위해 강우모의 발생기법을 이용하여 대규모의 강우를 모의하고 이를 앞서의 두 가지 기록방식으로 기록한 후 기록된 자료를 이용해 확률강수량을 산정하고 기록으로 변환하지 않은 자료를 직접 이용하여 확률강수량을 산정하는 방법으로 각 방법의 불확실성을 비교해 보았다. 또한 측정의 최소단위를 변화시켜 기록한 다음 다시 분석하여 측정의 최소단위가 기록방식에 따라 어떻게 불확실성에 영향을 주는지 알아보았다. 이러한 결과가 향후 강수량의 기록 관리방법의 개선에 반영된다면 좀 더 정확한 수문 분석에 도움이 될 것이다.

  • PDF

A study on the uncertainty analysis of LENS-GRM using formal and informal likelihood measure (정형·비정형 우도를 이용한 LENS-GRM 불확실성 해석)

  • Lee, Sang Hyup;Choo, Inn Kyo;Yu, Yeong Uk;Jung, Younghun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.317-317
    • /
    • 2020
  • 수재해는 수자원 인프라의 부족 및 관리 미흡 등 많은 요인들이 있지만 강우의 유무와 크기가 가장 원초적인 요인들 중 하나이다. 정확한 강우량 추정 및 강우발생시간 예측은 수재해로 인한 피해를 예방하고 빠르게 대처할 수 있다. 그러나 강우예측에는 많은 불확실성을 내포하고 있기 때문에 이러한 불확실성을 이해하고 줄여 나가는 것이 필요하다. 최근 컴퓨터의 성능의 발전에 비례해 강우 예측 자료들도 점진적으로 발전을 거듭하고 있다. 이를 강우-유출 모형에 적용시 유출량 예측의 정확성 또한 비례하여 한층 더 발전할 수 있을 것이다. 하지만 신뢰성이 낮은 입력자료를 대상으로 하는 유출해석 모형은 많은 불확실성을 내포할 것이다. 따라서 본 연구에서는 위천 유역에 대해 LENS(Limited area ENsemble prediction System) 강우앙상블 예측자료의 적용성을 검토하고 그리드 기반 강우 유출 모델 GRM(Grid based Rainfall-runoff Model) 에 적용하여 유출예측의 불확실성을 평가하고자 하였다. 또한 강우예측 및 유출예측은 수 많은 매개변수를 포함하며 최종적인 예측은 더 큰 불확실한 범위로 산출될 수 있다. 이에 따라 본 연구에서는 Python3 기반 코딩으로 LENS 자료 구축 및 GRM 모형의 매개변수 보정을 각 2000회 씩에 걸쳐 총 2회 실시하여 수문학적, 지형학적 인자에 따른 불확실성 범위를 보정하고자 하였다. 매개변수의 보정은 비정형우도(Informal likelihood) NSE, 정형우도(Formal likelihood) Lognormal(Log-likelihood function)의 우도에 따른 행위모델을 산정하여 보정하였다. 따라서 본 연구에서는 선행연구들을 참고한 정형, 비정형 우도의 임계치를 이용한 불확실성해석에 적용하였으며 이는 사용자의 행위모델선정 임계치 범위 선정으로 인한 불확실성을 줄여나감에 기여할 수 있을것으로 사료된다.

  • PDF

Evaluation of the uncertainties in Rainfall-Runoff model using Meta-Gaussian Approach (Meta-Gaussian 방법을 이용한 강우-유출 모형에서의 불확실성 산정)

  • Kim, Byung-Sik;Kim, Bo-Kyung;Kwon, Hyun-Han;Hahm, Chang-Hahk
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.733-737
    • /
    • 2008
  • 강우-유출(Rainfall Runoff, R-R)모형은 수자원계획과 관리를 위하여 가장 보편적으로 이용되는 도구로 홍수, 가뭄 등과 같은 극한 사상의 예측 또는 물수지 분석에 사용되고 있다. 오랜 기간 많은 수문학자들이 강우-유출 모형의 불확실성 개선 및 정량화하기 위하여 노력하였으나, 여전히 중요한 수문학적 과제로 남아있다. 이에 본 연구에서는 강우-유출 모형의 불확실성을 정량화하는데 목적을 두고 물리적 기반의 분포형 모형과 개념적 준 분포형 모형을 중랑천 유역에 적용하여 그 결과를 비교하였다.

  • PDF

Nuclear Power Plant Lifetime Management (원자력발전소 수명관리)

  • 홍승열
    • Journal of the KSME
    • /
    • v.33 no.5
    • /
    • pp.384-392
    • /
    • 1993
  • 이 글에서는 원자력 발전소 수명관리에 대한 개념, 절차 및 해외연구동향과 한전의 연구계획을 소개하였다. 원자력 발전소의 수명관리 연구란 전 수명기간 동안에 발전소 성능과 안전성을 유 지할 수 있는 기술적인 방안과 경제적으로 최적인 운전종료 시점을 찾는 과정이다. 또 수명관 리란 현재의 개발된 기술로 미래에 발생할 일에 대한 예측을 하는데 있어서 불확실성을 줄여 나가는 과정이므로 지금 현재의 단계에서는 해당 발전소의 연장운전 가능성을 누구도 명확히 말할 수 없다. 따라서 수명관리연구는 연장운전 그 자체보다 어떻게 하면 발전소를 잘 관리하여 오랫동안 경제적으로 운전할 수 있을까 하는 측면에서 수행되어져야 한다.

  • PDF