• Title/Summary/Keyword: 분포하중

Search Result 1,097, Processing Time 0.022 seconds

Design and Full Size Flexural Test of Spliced I-type Prestressed Concrete Bridge Girders Having Holes in the Web (분절형 복부 중공 프리스트레스트 콘크리트 교량 거더의 설계 및 실물크기 휨 실험 분석)

  • Han, Man Yop;Choi, Sokhwan;Jeon, Yong-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3A
    • /
    • pp.235-249
    • /
    • 2011
  • A new form of I-type PSC bridge girder, which has hole in the web, is proposed in this paper. Three different concepts were combined and implemented in the design. First of all, a girder was precast at a manufacturing plant as divided pieces and assembled at the construction site using post-tensioning method, and the construction period at the site will be reduced dramatically. In this way, the quality of concrete can be assured at the manufacturing factory and concrete curing can be well controlled, and the spliced girder segments can be moved to the construction site without a transportation problem. Secondly, a numerous number of holes was made in the web of the girder. This reduces the self-weight of the girder. But more important thing related to the holes is that about half of the total anchorages can be moved from the girder ends into individual holes. The magnitude of negative moment developed at girder ends will be reduced. Also, since the longitudinal compressive stresses are reduced at ends, thick end diaphragm is not necessary. Thirdly, Prestressing force was introduced into the member through multiple stages. This concept of multi-stage prestressing method overcomes the prestressing force limit restrained by the allowable stresses at each loading stage, and maximizes the magnitude of applicable prestressing force. It makes the girder longer and shallower. Two 50 meter long full scale girders were fabricated and tested. One of them was non-spliced, or monolithic girder, made as one piece from the beginning, and the other one was assembled using post-tensioning method from five pieces of segments. It was found from the result that monolithic and spliced girder show similar load-deflection relationships and crack patterns. Girders satisfied specific girder design specification in flexural strength, deflection, and live load deflection control limit. Both spliced and monolithic holed web post-tensioned girders can be used to achieve span lengths of more than 50m with the girder height of 2 m.

A study on the effect of tunnelling to adjacent single piles and pile groups considering the transverse distance of pile tips from the tunnel (말뚝의 횡방향 이격거리를 고려한 터널굴착이 인접 단독말뚝 및 군말뚝에 미치는 영향에 대한 연구)

  • Jeon, Young-Jin;Kim, Sung-Hee;Lee, Cheol-Ju
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.637-652
    • /
    • 2015
  • In the present work, a number of three-dimensional (3D) parametric numerical analyses have been carried out to study the influence of tunnelling on the behaviour of adjacent piles considering the transverse distance of the pile tip from the tunnel. Single piles and $5{\times}5$ piles inside a group with a spacing of 2.5d were considered, where d is the pile diameter. In the numerical modelling, several key issues, such as the tunnelling-induced pile settlements, the interface shear stresses, the relative shear displacements, the axial pile forces, the apparent factors of safety and zone of influence have been rigorously analysed. It has been found that when the piles are inside the influence zone, the pile head settlements are increased up to about 111% compared to those computed from the Greenfield condition. Larger pile settlements and smaller axial pile forces are induced on the piles inside the pile groups than those computed from the single piles since the piles responded as a block with the surrounding ground. Also tensile pile forces are induced associated with the upward resisting skin friction at the upper part of pile and the downward acting skin friction at the lower part of pile. On the contrary, when the piles were outside the influence zone, tunnelling-induced compressive pile forces developed. Based on computed load and displacement relation of the pile, the apparent factor of safety of the piles was reduced up to about 45%. Therefore the serviceability of the piles may be substantially reduced. The pile behaviour, when considering the single piles and the pile groups with regards to the influence zone, has been analysed by considering the key features in great details.

A Study on the Ship`s Collision Avoiding Action Analyzed from a Viewpoint of Ship Kinematics (선체운동학적으로 본 충돌회피동작에 관한 연구)

  • 김기윤
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.14 no.2
    • /
    • pp.97-112
    • /
    • 1978
  • The rule 15, 16 and 17 of International Regulations for Preventing collisions at Sea direct actions to avoid collision when two power-driven vessels are crossing. But these rules do not present the safety minimum approaching distances outside which a give- way vessel deeps out of the way of a stand-on vessel. In this paper, the author analyzed the ship's collision avoiding actions from a viewpoint of ship kinematics as the method to calculate this distance. The author worked out mathematic formulas for calculating the safety minimum approaching distances outside which the give-way vessel takes the actions to avoid collisions in accordance with the cross angles of the crossing vessels' courses. Figuring out actually the values of maneuvering indices of the M. S. Koan Ack San (GT: 224tons), the training ship of the National Fisheries University of Busan and the M. S. Golden Clover (GT: 101, 235tons) of the Eastern Shipping Co., Ltd. through their Z test, the author applied these values to the calculating formulas and calculated the safety minimum approaching distances. The results of calculations are as follows; 1. The greatest distance is to be kept by the give-way vessel to avoid collision when the cross angle of courses is 90$^{\circ}$ or near it. In such case the safety minimum approaching distance of a small vessel must be more than 5 times of her own length and that of a large vessel more than 11 times of her own length. 2. Collision danger is greater when crossing angle is obtuse than in an acute angle, therefore greater distance is to be kept by the give-way vessel to avoid collision in the case of the obtuse angle. 3. The actions to be taken to avoid collisions by the give-way vessel in Rule 16 and by the stand-on vessel in Rule 17(a)(ii) of International Regulations for Preventing Collisions at Sea, must be done outside the above safety minimum approaching distance. When inevitably such actions are to be taken within the safety minimum approaching distance, they should be accompanied with engine motions.

  • PDF

Dosimetric Analysis of Respiratory-Gated RapidArc with Varying Gating Window Times (호흡연동 래피드아크 치료 시 빔 조사 구간 설정에 따른 선량 변화 분석)

  • Yoon, Mee Sun;Kim, Yong-Hyeob;Jeong, Jae-Uk;Nam, Taek-Keun;Ahn, Sung-Ja;Chung, Woong-Ki;Song, Ju-Young
    • Progress in Medical Physics
    • /
    • v.26 no.2
    • /
    • pp.87-92
    • /
    • 2015
  • The gated RapidArc may produce a dosimetric error due to the stop-and-go motion of heavy gantry which can misalign the gantry restart position and reduce the accuracy of important factors in RapidArc delivery such as MLC movement and gantry speed. In this study, the effect of stop-and-go motion in gated RapidArc was analyzed with varying gating window time, which determines the total number of stop-and-go motions. Total 10 RapidArc plans for treatment of liver cancer were prepared. The RPM gating system and the moving phantom were used to set up the accurate gating window time. Two different delivery quality assurance (DQA) plans were created for each RapidArc plan. One is the portal dosimetry plan and the other is MapCHECK2 plan. The respiratory cycle was set to 4 sec and DQA plans were delivered with three different gating conditions: no gating, 1-sec gating window, and 2-sec gating window. The error between calculated dose and measured dose was evaluated based on the pass rate calculated using the gamma evaluation method with 3%/3 mm criteria. The average pass rates in the portal dosimetry plans were $98.72{\pm}0.82%$, $94.91{\pm}1.64%$, and $98.23{\pm}0.97%$ for no gating, 1-sec gating, and 2-sec gating, respectively. The average pass rates in MapCHECK2 plans were $97.80{\pm}0.91%$, $95.38{\pm}1.31%$, and $97.50{\pm}0.96%$ for no gating, 1-sec gating, and 2-sec gating, respectively. We verified that the dosimetric accuracy of gated RapidArc increases as gating window time increases and efforts should be made to increase gating window time during the RapidArc treatment process.

The Structual Restoration on Gyeongju-Style Piled Stone-Type Wooden Chamber Tombs (경주식 적석목곽묘의 구조복원 재고)

  • Gweon, Yong Dae
    • Korean Journal of Heritage: History & Science
    • /
    • v.42 no.3
    • /
    • pp.66-87
    • /
    • 2009
  • The definition of the structure of wooden chamber tomb(piled stone-type) is as follows. It is a tomb with wooden chamber, and stones were piled on top of the wooden chamber, and then a wooden structure was placed on top of the piled stones, and more stones were piled on top of the wooden structure, and sealed with clay. Of course this definition can vary according to periods, the buried, etc. Gyeongju-style piled stone type wooden chamber tombs have some distinguished characteristics compared to general definition of piled stone type wooden chamber tombs. Outside the wooden chamber, either stone embankments or filled-in stones were layed out, and pilet-in stones are positioned right above the wooden chamber, and almost every class used this type, and finally, it is exclusively found in Gyeongju area. First generations of this Gyeongju-style piled stone type wooden chamber tombs appeared in first half of 5th century. These tombs inherited characteristics like ground plan, wooden chamber, double chamber(inner chamber and outer chamber), piled stones, burial of the living with the dead, piled stones, from precedent wooden chamber tombs. However these tombs have explicit new characteristics which are not found in the precedent wooden chamber tombs such as stone embankments, wooden pillars, piled stones(above ground level), soil tumuluses. stone embankments and wooden pillars are exclusively found on great piled stone type above-ground level wooden chamber tombs such as the Hwangnamdaechong(皇南大塚). Stone embankments, wooden pillars, piled stones(above ground level) are all elements of building process of soil tumuluses. stone embankments support outer wall of above-ground level wooden chambers and disperse the weight of tumuluses. Wooden pillars functioned as auxiliary supports with wooden structures to prevent the collapse of stone embankments. Piled stones are consists of stones of regular size, placed on the wooden structure. And after the piled stones were sealed with clay, tumulus was built with soil. Piled stones are unique characteristics which reflects the environment of Gyeongju area. Piled stone type wooden chamber tombs are located on the vast and plain river basin of Hyeongsan river(兄山江). Which makes vast source of sands and pebbles. Therefore, tumulus of these tombs contains large amount of sands and are prone to collapse if soil tumulus was built directly on the wooden structure. Consequently, to maintain external shape of the tumulus and to prevent collapse of inner structure, piled stones and clay-sealing was made. In this way, they can prevent total collapse of the tombs even if the tumulus was washed away. The soil tumulus is a characteristic which emerges when a nation or political entity reaches certain growing stage. It can be said that after birth of a nation, growing stage follows and social structure will change, and a newly emerged ruling class starts building new tombs, instead of precedent wooden chamber tombs. In this process, soil tumulus was built and the size and structure of the tombs differ according to the ruling class. Ground plan, stone embankments, number of the persons buried alive with the dead, quantity and quality of artifacts reflect social status of the ruling class. In conclusion, Gyeongju-style piled stone type wooden chamber tombs emerged with different characteristics from the precedent wooden chamber tombs when Shilla reached growing stage.

Frequency analysis for annual maximum of daily snow accumulations using conditional joint probability distribution (적설 자료의 빈도해석을 위한 확률밀도함수 개선 연구)

  • Park, Heeseong;Chung, Gunhui
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.9
    • /
    • pp.627-635
    • /
    • 2019
  • In Korea, snow damage has been happened in the region with no snowfalls in history. Also, casual damage was caused by heavy snow. Therefore, policy about the Natural Disaster Reduction Comprehensive Plan has been changed to include the mitigation measures of snow damage. However, since heavy snow damage was not frequent, studies on snowfall have not been conducted in different points. The characteristics of snow data commonly are not same to the rainfall data. For example, some parts of the southern coastal areas are snowless during the year, so there is often no values or zero values among the annual maximum daily snow accumulation. The characteristics of this type of data is similar to the censored data. Indeed, Busan observation sites have more than 36% of no data or zero data. Despite of the different characteristics, the frequency analysis for snow data has been implemented according to the procedures for rainfall data. The frequency analysis could be implemented in both way to include the zero data or exclude the zero data. The fitness of both results would not be high enough to represent the real data shape. Therefore, in this study, a methodology for selecting a probability density function was suggested considering the characteristics of snow data in Korea. A method to select probability density function using conditional joint probability distribution was proposed. As a result, fitness from the proposed method was higher than the conventional methods. This shows that the conventional methods (includes 0 or excludes 0) overestimated snow depth. The results of this study can affect the design standards of buildings and also contribute to the establishment of measures to reduce snow damage.

무령왕릉보존에 있어서의 지질공학적 고찰

  • 서만철;최석원;구민호
    • Proceedings of the KSEEG Conference
    • /
    • 2001.05b
    • /
    • pp.42-63
    • /
    • 2001
  • The detail survey on the Songsanri tomb site including the Muryong royal tomb was carried out during the period from May 1 , 1996 to April 30, 1997. A quantitative analysis was tried to find changes of tomb itself since the excavation. Main subjects of the survey are to find out the cause of infiltration of rain water and groundwater into the tomb and the tomb site, monitoring of the movement of tomb structure and safety, removal method of the algae inside the tomb, and air controlling system to solve high humidity condition and dew inside the tomb. For these purposes, detail survery inside and outside the tombs using a electronic distance meter and small airplane, monitoring of temperature and humidity, geophysical exploration including electrical resistivity, geomagnetic, gravity and georadar methods, drilling, measurement of physical and chemical properties of drill core and measurement of groundwater permeability were conducted. We found that the center of the subsurface tomb and the center of soil mound on ground are different 4.5 meter and 5 meter for the 5th tomb and 7th tomb, respectively. The fact has caused unequal stress on the tomb structure. In the 7th tomb (the Muryong royal tomb), 435 bricks were broken out of 6025 bricks in 1972, but 1072 bricks are broken in 1996. The break rate has been increased about 250% for just 24 years. The break rate increased about 290% in the 6th tomb. The situation in 1996 is the result for just 24 years while the situation in 1972 was the result for about 1450 years. Status of breaking of bircks represents that a severe problem is undergoing. The eastern wall of the Muryong royal tomb is moving toward inside the tomb with the rate of 2.95 mm/myr in rainy season and 1.52 mm/myr in dry season. The frontal wall shows biggest movement in the 7th tomb having a rate of 2.05 mm/myr toward the passage way. The 6th tomb shows biggest movement among the three tombs having the rate of 7.44mm/myr and 3.61mm/myr toward east for the high break rate of bricks in the 6th tomb. Georadar section of the shallow soil layer represents several faults in the top soil layer of the 5th tomb and 7th tomb. Raninwater flew through faults tnto the tomb and nearby ground and high water content in nearby ground resulted in low resistance and high humidity inside tombs. High humidity inside tomb made a good condition for algae living with high temperature and moderate light source. The 6th tomb is most severe situation and the 7th tomb is the second in terms of algae living. Artificial change of the tomb environment since the excavation, infiltration of rain water and groundwater into the tombsite and bad drainage system had resulted in dangerous status for the tomb structure. Main cause for many problems including breaking of bricks, movement of tomb walls and algae living is infiltration of rainwater and groundwater into the tomb site. Therefore, protection of the tomb site from high water content should be carried out at first. Waterproofing method includes a cover system over the tomvsith using geotextile, clay layer and geomembrane and a deep trench which is 2 meter down to the base of the 5th tomb at the north of the tomv site. Decrease and balancing of soil weight above the tomb are also needed for the sfety of tomb structures. For the algae living inside tombs, we recommend to spray K101 which developed in this study on the surface of wall and then, exposure to ultraviolet light sources for 24 hours. Air controlling system should be changed to a constant temperature and humidity system for the 6th tomb and the 7th tomb. It seems to much better to place the system at frontal room and to ciculate cold air inside tombs to solve dew problem. Above mentioned preservation methods are suggested to give least changes to tomb site and to solve the most fundmental problems. Repairing should be planned in order and some special cares are needed for the safety of tombs in reparing work. Finally, a monitoring system measuring tilting of tomb walls, water content, groundwater level, temperature and humidity is required to monitor and to evaluate the repairing work.

  • PDF