• Title/Summary/Keyword: 분석구간

Search Result 5,624, Processing Time 0.033 seconds

Comparing the Effectiveness of Road Safety Features by Spatial Scope of Safety Improvement Project (도로안전개선사업의 공간적 범위에 따른 도로안전시설물의 효과도 비교)

  • Park, Gyu-Yeong;Kim, Tae-Hui;Kim, Seong-Uk;Lee, Su-Beom
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.4 s.90
    • /
    • pp.31-42
    • /
    • 2006
  • The purpose of this study is to compare the effectiveness of road safety features by spatial scope Spot & Section-based safety Improvement project. Empirical data was collected from black-spot study of Jeonbuk and "Traffic Safety Improvement Project on National Highway 17". Evaluation model of effectiveness was developed by using Empirical Bayes (EB) method. And Relative Effectiveness was measured by Odds Ratio. The result indicates that Section-based safety improvement was $7.09{\sim}77.27%$ more effective than the spot-based. It means that section-based improvement projects should be expanded while considering the characteristics of the section in spot based improvement.

Estimating the design flood interval of agricultural reservoirs using a non-parametric resampling technique (비매개변수적 리샘플링 기법 기반 농업용 저수지 설계홍수량 구간 추정 기법)

  • Park, Jihoon;Kang, Moon Seong;Kim, Keuk Soo;Choi, Kyu Hyun;Cho, Hyo Seob
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.397-397
    • /
    • 2021
  • 본 연구의 목적은 비매개변수적 리샘플링 기법을 이용하여 농업용 저수지 유입 설계홍수량의 구간을 추정하는 기법을 제안하는 데 있다. 본 연구는 설계홍수량을 점 추정하여 안전계수(safety factor)를 적용하는 기존 방법에 대한 대안을 제시하고자 한다. 설계홍수량의 구간 추정을 수행하기 위해 부트스트랩 기법(bootstrap technique)을 사용하였다. 부트스트랩 기법을 이용하여 95% 신뢰수준에 해당하는 신뢰구간을 추정하였다. 본 연구의 공간적인 범위는 남한의 30개 농업용 저수지이며, 시간적인 범위는 과거 기간(2015s: 1986-2015)과 미래기간(2040s: 2011-2040, 2070s: 2041-2070, 2100s: 2071-2100)을 설정하였다. 본 연구에서는 200년 빈도, 24시간 지속기간을 대표적인 결과로 선정하여 분석하였다. 빈도분석은 GEV 분포를 사용하였고, L-moment 방법을 이용하여 매개변수를 추정하였다. 설계홍수량은 HEC-1 모형을 이용하여 산정하였다. 최종적으로 설계홍수량 구간 추정한 결과를 기존의 점 추정한 뒤 안전계수를 적용한 기존 방법과 비교하였다. 97.5th BCa percentile 기준으로 상대적인 변화를 비교해보면, 미래로 갈수록 구간 추정으로 산정한 설계홍수량이 점차 증가하는 것으로 도출되었다. 한강 및 금강 유역에 위치한 농업용 저수지의 설계홍수량이 낙동강 유역에 비해 상대적으로 큰 변화를 보여주었다. 몇몇 농업용 저수지에 대해서 2040s 기간에 다소 감소하기도 하였으나 2070s 기간 이후에 다시 증가하는 결과를 보여주었다. 낙동강 유역의 위치는 농업용 저수지의 설계홍수량은 미래로 갈수록 크게 증가하지 않는 경향을 보여주었다. 본 연구는 설계홍수량을 추정하는 데 있어 결정론적인 방법에서 더 나아가 자료의 통계적인 특성을 고려하여 구간 추정을 수행하는 방법론을 제공할 수 있을 것으로 사료된다.

  • PDF

도수로터널 굴착에 따른 지하수 유출

  • 이병대;함세영;조병욱;이인호;이춘오;성익환
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2001.09a
    • /
    • pp.67-70
    • /
    • 2001
  • 터널 굴착에 따른 연구지역내 지하수체의 거동 특성을 파악하기 위하여 터널 굴착시 그라우팅 이전의 초기 유출량과 초기 그라우팅 이후의 구간별 유출량을 측정하였고 단열구조와 비교, 분석하였다. 초기 유출량은 120,990 m$^3$/day이며, 초기 유출이 심했던 구간은 크게 6개 구간으로 세분할 수 있다. 초기 그라우팅 후 지하수 유출이 심했던 구간 역시, 그라우팅 이전과 마찬가지로 6개 구간으로 세분할 수 있다. 그라우팅 전, 후의 유출량을 비교해 보면 그라우팅후의 유출량은 42,844m$^3$/day으로, 그라우팅 전에 비해 많이 감소되었다. 터널 굴착시 터널내로 유출되는 지하수의 대부분은 터널과 직교 혹은 사교하여 관통하고 있는 단층 및 단층 파쇄대와 연장성이 양호한 절리면들을 따라서 유동되고 있다. 터널내의 지하수 유출에 영향을 미치는 단열들은 대체로 4조의 불연속면군으로 분류 할 수 있는데, 주 분포방향은 크게 TSet 1 : N60-85$^{\circ}$W, TSet 3 : N40-50$^{\circ}$E, TSet 3 : N10-20$^{\circ}$E, TSet 4 : N70-80$^{\circ}$E이다.

  • PDF

On the actual coverage probability of binomial parameter (이항모수의 신뢰구간추정량에 대한 실제포함확률에 관한 연구)

  • Kim, Dae-Hak
    • Journal of the Korean Data and Information Science Society
    • /
    • v.21 no.4
    • /
    • pp.737-745
    • /
    • 2010
  • In this paper, various methods for finding confidence intervals for the p of binomial parameter are reviewed. We compare the performance of several confidence interval estimates in terms of actual coverage probability by small sample Monte Carlo simulation.

A Study on Lane Width of Curved Section by Sway Distance Analysis of Running Vehicle on Urban Roads (도시부 도로에서 주행차량의 횡방향 이격량 분석을 통한 곡선부 차로폭 연구)

  • Lee, Young-Woo
    • International Journal of Highway Engineering
    • /
    • v.13 no.2
    • /
    • pp.57-65
    • /
    • 2011
  • In this study, estimated the minimum lane width for the curved section by analyzing of lateral sway distance and compared the lane width for result of this study and a precedent study for straight section on urban roads. Then suggested minimum lane width of road alignments and vehicle classes. The lane width of curved section that was investigated was 2.79m~3.40m. Analysis of frequency distribute and cumulative frequency distribution for lateral sway distance on the basis of 85% of the suggested vehicles. The result of study, minimum lane width for the curved section was 2.31m~2.58m in the case of small size car and 2.80m~3.27m in the case of large size car. Result of this study is judged that it is necessary to case for introduction of green transit, during road construction and construct a road for small size car. Expect result of this study can be used for the application of flexible design standard according the purpose of road designer.

Hydraulic Characteristic Analysis of Final Closing considering Non-Darcy Flow (Non-Darcy 흐름특성을 고려한 최종체절 수리특성분석)

  • Choi, Hung-Sik
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.8
    • /
    • pp.613-622
    • /
    • 2004
  • The simulation results of final closing by the developed model considering the flows through tide embankment of non-Darcy and through sluice gate agree well to the observed data which shows the model applicability. In comparative analysis with observed data, the simulation results by Homma(1958) are more accurate than those by Na(1987). The free flow equation with discharge coefficient, regardless of free or submerged flows, by Na based on the submergence ratio is applicable to the engineering practices. Because two simulated discharges are greater than the actual one, the correction of discharge coefficients reflecting the irregular section of actual closing gap situation is necessary. In the hydraulic analysis of final closing, the flow through tide embankment has been generally analysed by Darcy. Hydraulic analysis by the correct discharge through tide embankment of non-Darcy flow is necessary, because the ratio between flows through tide embankment and closing gap is relatively great at final closing.

Analysis of the cause of non-measurement seepage rate on CFRD using geophysical and geotechnical exploration (물리탐사와 지반조사를 이용한 CFRD댐 침투수량 미계측 원인분석)

  • Jong Wook Lee;Geun Soo Lee;Seong Bae Jo;Nam Ryong Kim;Jeong Yeul Lim
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.83-83
    • /
    • 2023
  • 댐의 침투수량은 준공이후 댐 안전성 확보를 나타내는 지표 중의 하나이며, 유지관리를 위해 침투수량 측정을 실시하여 관리를 하고 있다. 댐 타입별로 침투수량에 대한 허용치와 관리기준치는 다르지만, 기본적으로 댐에서 발생되는 침투수량은 측정범위를 넘지 않도록 관리를 하고 있다. 댐의 침투수량 측정은 댐 하류에 누수집수벽을 설치하고 댐에서 발생되는 침투수량을 집수한 후 삼각위어를 통하여 침투수량을 측정하고 있다. 이러한 침투수량 측정은 대부분의 댐에서 실시간으로 자동측정하고 있지만, 경우에 따라 미계측 구간이 발생되어 댐 유지관리 측면에서 미계측에 대한 원인분석이 필요한 실정이다. 일반적으로 침투수량의 미계측 원인은 계측기기, 삼각위어, 누수집수벽, 기초지반 등 다양한 원인이 있지만 명확한 원인을 찾기는 어려움이 많다. 특히, 댐 침투수량의 경우 지하수위, 댐 표면 우수, 침투수가 같이 측정되기 때문에 원인분석을 위해서는 다양한 검토가 필요하다. 본 연구의 표면차수벽형석괴댐은 누수집수벽을 통하여 침투수량을 측정하고 있으나, 일부 구간 미계측 부분이 발생하여 기초지반, 댐체 하류사면, 여수로와 댐체 접합부를 통한 누수를 원인으로 추정하였다. 이를 조사하기 위하여 전기비저항 탐사, 시추조사, 수압시험, 지하수위 측정 결과를 이용하여 누수발생 추정위치를 찾고, 침투수량이 미계측되는 원인을 분석하고자 하였다. 전기비저항 탐사는 여수로 접합부, 누수집수벽 상·하류 구간을 선정하여 측정한 결과 상·하류 저비저항대가 존재하는 구간을 추정할 수 있었다. 수압시험 결과 기초암반은 2.3 ~ 21.3 Lu(3.65×10-5 ~ 3.65×10-4 cm/sec)의 범위로 누수 가능성이 있는 높은 투수성을 갖는 부분을 확인할 수 있었다. 전기비저항 탐사, 수압시험, 지하수위 측정을 통해 누수집수벽 기초지반 누수발생 원인분석 결과 누수집수벽 기초암반을 통한 누수로 누수집수벽에 댐체를 통한 침투수량이 저류되지 못하는 현상이 발생하기 때문인 것으로 판단되었다. 침투수량계의 정상화를 위해서는 조사를 통해 확인된 누수집수벽 기초암반 누수구간의 그라우팅 보수보강이 필요함을 확인하였다.

  • PDF

Voltage deviation analysis for battery pack Aging (배터리팩 열화 판단을 위한 셀 간 전압 편차 분석)

  • Kwon, Sanguk;Han, Dongho;Lee, Seongjun;Song, Hyeon-Cheol;Kim, Jonghoon
    • Proceedings of the KIPE Conference
    • /
    • 2019.07a
    • /
    • pp.451-452
    • /
    • 2019
  • 본 논문은 과충전 및 과방전의 원인이 되는 배터리팩 내부 셀의 불균형으로 인한 셀 간 전압 편차를 분석하기 위해 24s 1p로 구성된 배터리 팩을 사용하여 전기적 열화 실험을 진행하였다. 만충 만방 실험 결과에서 SOC 구간에 따른 셀 간 전압 편차를 분석하였으며, 사이클 증가로 인한 열화와 상관관계가 높은 구간을 분석하여 열화 판단의 파라미터로 제안한다.

  • PDF