• Title/Summary/Keyword: 부유식 생산저장선박

Search Result 7, Processing Time 0.017 seconds

A Noise Prediction of Floating, Production, Storage and Offloading(FPSO) (부유식 석유생산.저장.하역선박의 소음해석)

  • Kim, Young-Hyun;Kim, Dong-Hae
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.307-310
    • /
    • 2000
  • Recently, the demand for the Floating, Production Storage, and Offloading facility(FPSO) which has some economic and technical advantages, has increased in offshore oil production areas. The basic characteristics of a 343,000 DWT class FPSO which is being built in Hyundai Heavy Industries and shall be installed in offshore Angola, is almost same as that of oil carriers. However, she do not have self-propulsion system, but has additional facilities for oil production and positioning system. Main noise source contributing to the cabin noise of the accommodation, are classified into the machine in the engine room and the deckhouse, HVAC system, and the topside equipments. In general, the noise regulation for the offshore structure is much severer than that of the common commercial ships and the maximum acceptable sound pressure level of cabins is specified in 45dB(A). This paper describes the procedure of noise analysis along with its results. Noise analysis has been carried out for the case of emergency diesel generator running condition and the case of normal production condition and the results has been compared with the measurement results of the first case. Based on the results, proper countermeasures to reduce excessive noise level has been applied considering the characteristics of sources and receiver spaces and can be satisfied the specifications at all spaces.

  • PDF

Analytical Study on the Temperature and Pressure Changes in DME FPSO Storage Tank with Liquid Filling level (DME FPSO 저장탱크의 액충전량에 따른 온도 및 압력변화에 대한 해석 연구)

  • Yun, Sangkook
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.36 no.8
    • /
    • pp.1024-1029
    • /
    • 2012
  • As DME (Dimethyl ether) is the one of the future possible massive energy sources synthesized from natural gas, KOGAS has been doing to obtain overseas resources to meet the domestic needs. and tried to build new DME FPSO ship. This paper presents that it can help for the DME storage tank designers and storage management engineers doing proper work by understood the evaporation phenomena and pressure change of DME by thermal intake in storage tank. The experimental result shows that the evaporation rate and pressure are increased with higher liquid filling level. The proper DME liquid filling level in tank is obtained as lower than full 98% volume of tank in case of storing longer than a day, because the pressure is increased rapidly with full 98% filled level of storage tank.

Study on the characteristics of perlite insulation for the storage tank in LNG carrier (LNG선박 화물창의 펄라이트 단열재 적용성에 관한 설계 특성 연구)

  • Yun, Sangkook
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.37 no.8
    • /
    • pp.843-848
    • /
    • 2013
  • As the LNG demands are growing, the constructions of LNG FPSO (Floating Production Storage and Off-loading) and LNG carriers have been constantly increased, and the various design of storage tank has been tried. This paper propose that the material of inner storage tanks is made of 5~9% Ni steel plate and perlite powder insulation instead of urethane foam block. It needs essentially to obtain the proper design specifications that are the pressure of perlite, the characteristics of resilient blanket as the pressure absorber, optimum thickness of blanket and design pressure of tank wall, etc. to enable the perlite insulation system to LNG carrier, The results show that the design thickness of blanket should be between 1/4 to 1/3 of insulation width and the optimum rate becomes 30%, and the design pressure be applied below 1,500 Pa with blanket thickness.

A Noise Control of a Floating, Production, Storage and Offloading (FPSO) (부유식 석유생산/저장/하역 선박(FPSO)의 소음예측 및 저감)

  • Kim, Dong-Hae;Ko, Kyung-Eun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.550-553
    • /
    • 2004
  • Recently, the demand for the Floating, Production, Storage, and Offloading facility (FPSO) which has some economic and technical advantages, has increased in offshore oil production areas. The 36,8000 DWT class FPSO was built in Hyundai Heavy Industries and will be installed in Offshore Angola. She dose not have self-propulsion system, but has additional facilities for oil production and positioning system. Main noise sources are contributing to the cabin noise of the accommodation are classified into three classes such as the machinery in the engine room and the deckhouse, HVAC system, and the topside equipments. In general, the noise regulation for the offshore structure is severer than that of the cargo ship and acceptable noise limit of cabin is specified as 45 dB(A). This paper describes the procedure of noise analysis, the countermeasures of noise control, and the measurement results of the quay trial. In order to minimize the noise levels, careful attention have to be paid by the special committee of experts from the initial design stage to the delivery. Proper countermeasures, considering the characteristics of sources and receiver spaces, were applied from the noise prediction and various experiment results. Finally, this ship was successfully delivered with excellent noise properties. The technology to minimize the noise levels for FPSO has been established throughout the construction of this ship.

  • PDF

A Study on Time Charter Party For Offshore Service Vessels 2005 - Focusing the Dispute Resolution Clause - (2005년 해양플랜트 지원선박용 정기용선계약서에 관한 소고 - 분쟁해결약관을 중심으로 -)

  • Lee, Chang-Hee;Kim, Jin-Kwon
    • Journal of Navigation and Port Research
    • /
    • v.38 no.1
    • /
    • pp.81-87
    • /
    • 2014
  • Today, it is a trend that the demand of offshore plants is constantly growing, along with the advances in technology which are thoroughly needed to the rise of international oil price as well as offshore energy development. In addition, The main sectors of ship building, sale & purchase and chartering market regarding various kind of offshore supporting vessels that supports the business of offshore energy development is now maintaining its steady growth. However, in domestic case, the contract of time charter occasions regarding the offshore support vessel are almost non-existing situation. Thus, the relevant practical study regarding to implementation of various kinds of legal disputes and applicable laws that can be properly applied in time charter and the field of sale & purchase needs to be conducted actively. Therefore, the concept of this study has included the wide comparisons of other special provisions with the existing time-charter by making its base on "Supply Time 2005" which is the worldwide standard form of time charter in offshore support vessel market and its investigation, aiming to provide practical guidance and procedure for implementation of arbitration and applicable law issues which can be applied in legal disputes between parties.