• Title/Summary/Keyword: 본선구간

Search Result 76, Processing Time 0.02 seconds

Safety Improvement of Centrally Installed "Hi-pass" Lane of Express Highway (고속도로 중앙하이패스차로 안전성 개선에 관한 연구 - 서울외곽순환고속도로 본선영업소를 중심으로 -)

  • Yoo, Bong-Seok;Lee, Soo-Beom;Park, Wan-Yong;Do, Hyun-Gu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1D
    • /
    • pp.1-10
    • /
    • 2010
  • Safety improvement has been a continuous challenge, especially at toll gate of express highway where traffic conflict often occurs due to frequent lane change by drivers of "Hi-pass" lane and regular "TCS" lane. As a part of research on safety at toll gate, this study videotaped traffic conflict data between vehicles using centrally located "Hi-pass" lane and regular "TCS" lane and analyzed accident risk. According to the correlation analysis of vehicle speed, relative vehicle speed, and sudden vehicle deceleration rate due to traffic conflict, when the relative vehicle speed between centrally located "Hi-pass" lane and regular "TCS" lane increases, sudden vehicle deceleration rate also increases. One of the findings is that centrally located "Hi-pass" lane at toll gate shows different location for traffic conflict, and frequency of traffic conflict and the relative vehicle speed was also different based on vehicle lane use. TA (Time to Accident) analysis shows that accident rate is high at toll gate where Hipass lane is installed in center lane, when the occurrence of sudden vehicle deceleration and deceleration time of vehicles rise for vehicles on "Hi-pass" lane. Furthermore, if the expressway entrance/exit point is closely located to toll gate, TA showed a low value. Thus, it is necessary to reduce the relative vehicle speed in order to improve safety. The Study presents reduction of the relevant vehicular speed and prevention of accidents at the centrally installed "Hi-pass" lane as an important strategy for safety improvement at toll gate.

Dynamic Network Loading Model based on Moving Cell Theory (Moving Cell Theory를 이용한 동적 교통망 부하 모형의 개발)

  • 김현명
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.5
    • /
    • pp.113-130
    • /
    • 2002
  • In this paper, we developed DNL(Dynamic Network Loading) model based on Moving cell theory to analyze the dynamic characteristics of traffic flow in congested network. In this paper vehicles entered into link at same interval would construct one cell, and the cells moved according to Cell following rule. In the past researches relating to DNL model a continuous single link is separated into two sections such as running section and queuing section to describe physical queue so that various dynamic states generated in real link are only simplified by running and queuing state. However, the approach has some difficulties in simulating various dynamic flow characteristics. To overcome these problems, we present Moving cell theory which is developed by combining Car following theory and Lagrangian method mainly using for the analysis of air pollutants dispersion. In Moving cell theory platoons are represented by cells and each cell is processed by Cell following theory. This type of simulation model is firstly presented by Cremer et al(1999). However they did not develop merging and diverging model because their model was applied to basic freeway section. Moreover they set the number of vehicles which can be included in one cell in one interval so this formulation cant apply to signalized intersection in urban network. To solve these difficulties we develop new approach using Moving cell theory and simulate traffic flow dynamics continuously by movement and state transition of the cells. The developed model are played on simple network including merging and diverging section and it shows improved abilities to describe flow dynamics comparing past DNL models.

Empirical Study of Simple Grade Facilities Gap Utilizing Micro Simulation Analysis (Micro Simulation을 활용한 도시부 단순입체시설 분합류 구간간격에 관한 실증연구)

  • Kim, Young-Il;Rho, Jeong-Hyun;Kim, Tae-Ho;Park, Jun-Tae
    • International Journal of Highway Engineering
    • /
    • v.14 no.2
    • /
    • pp.63-72
    • /
    • 2012
  • Current analysis method drives an irrationality a road, signal operation and cause confusion of road such as weaving, bottleneck being not including main traffic flow in analysis subject. Therefore, this research develops analysis method of simple grade facilities to grasp target equipment relationship effect as virtue process to grasp effect of simple grade facilities in city and there is the purpose to apply optimum space of analysis intersection. In this paper, get at effect of simple grade facilities in urban area, as well as, develop new analysis method of simple grade facilities and adapt optimal interval of intersection point. New method of this paper reasonably estimated to optimal interval of the traffic flow(diverge area, merge area). As research result, analysis method to present in this research could clarify vague part of existing analysis method and presume reasonable result. Optimal interval of diverge and merge area with facilities was appeared more then 65m from the main line and more then 45m from the frontage road. Meaning of this paper as follow. First, the effect of simple grade facilities estimate. as consider optimal interval of simple grade facilities in urban can plan efficiently operation planning of road and signal in connection with nearby intersection. Second, new method then previous methods. planner of transportation easily access due to run parallel with existing method. Third, new method is contained through traffic volumes. the existing method did not reflect one. and this new method reduce error to the minimum. when analysis of intersection and link. Fourth, using the new method propose improvement plan with road operation and signal operation.

A Study on the Behavior of an Existing Tunnel and the Safety Implications on its Facilities from a New Tunnel Blasting (신설 터널 발파 시 기존 터널 거동 및 시설물 안전에 관한 연구)

  • Kim, Sung Hoon;Cho, Woncheol
    • Journal of Korean Society of societal Security
    • /
    • v.3 no.2
    • /
    • pp.57-64
    • /
    • 2010
  • In this study, the behavior and safety of an existing tunnel and its facilities are investigated when a new tunnel adjacent to the existing tunnel is blasted. The design of the new tunnel puts priority on stability of the tunnel itself over the safety of the facilities which are installed within the existing tunnel such as jet fans. And thus, a detailed consideration on securing the safety of the existing facilities has been insufficient. An analysis on the types of traffic accidents in the last ten years shows that most incidents were due to the driver's improper response in emergency situations and unexpected obstacles. In consideration of this analysis, the safety of the facilities in the existing tunnel was secured by minimizing the charging amount for each hangfire and changing the excavation method of evacuation communication shelters to the large center hole cut blasting method to reduce blasting vibration. For a more quantitative analysis, measurement devices were installed inside the existing tunnel, at houses adjacent to the new tunnel, near jet fans in the existing tunnel. This enabled real time measurement of displacements of the existing tunnel, adjacent houses, and jet fans without interrupting traffic flow. Therefore, the improvements of charging amount for each hangfire, the blasting method, and the measurement method are suggested in this paper to secure the safety of the facilities in the existing tunnel when a new tunnel, located on a large city and adjacent to an existing tunnel, is designed.

  • PDF

Evaluation of Installation Length of CWR Considering Rail Tenser's Capacity And Track Maintenance (레일긴장기의 성능을 고려한 효율적인 장대레일 설정방법)

  • Park, Ok-Jeong;Kim, Eung-Rok
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.72-79
    • /
    • 2010
  • The significant of continuous welded rail (CWR) management is growing because KORAIL has the plan to convert the whole of conventional railway lines into CWRs through continuous activities since constructed the CWR track with 1.8km in Gyeongbu line in 1966. The CWR recently is needed a efficient management method because it is difficult to manage the CWR by the poor of technic and equipment, limited maintain labor force and shorted the maintain work time of CWR caused by industrialization, greenhouse effect and global warming In this point, The 70ton Tenser's which is using in the rail site has been analysised with no extra tenser's capacity in case of the under low temperature and exceed the length of 1km as a result of reviewing the CWR-related rules and standards, a series of records of safety accidents, operation obstacles, and the situation of broken rails published by KORAIL, existing rail temperature measurements, and CWR researches. Therefore avoid the excessive plan of the first set-up section, choice the proper time in the normal temperature that is possible to weld the rail, turning the difference of rail temperature and Installation temperature down is desirable.

  • PDF

A study to improve the existing rumble-strip (기존 노면요철 포장 개선 연구)

  • Ryu, Sung-Woo;Lim, Kwan;Park, Kwon-Je;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.177-186
    • /
    • 2009
  • Rumble strip was introduced in highway pavement for driver's safety in Korea on 2000. With proving its effectiveness, total length of highway with rumble strip has increased. This research team suggested a modified form of the existing rumble strip, which was placed on new concrete pavement during construction. The modified construction equipment was applied on test section at PyungTeak-Eumsung highway with some performance experiments. Through the equation of stopping sight distance proposed AASHTO, the modified form is safer than the existing one due to 0.65m of extra width. The indoor noise test showed that the modified form $3.5{\sim}9dB(A)$ noisier than the main pavement, which wasn't applied by rumble method. Therefore, it was one of alternatives to prevent sleeping. The modified form made the frequency effected on man's eye. There were no differences of the noise and vibration between modified form and existing one. However, that driver who participated on operating test on that section felt that the former was safer than the latter. It can be concluded that modified form can be applied to the new concrete pavement, that will decrease traffic accident.

  • PDF