Revision of Repair Materials Performance Requirement for Concrete Structures (콘크리트 구조물 단면복구공사 보수재료 품질기준개선)

  • Lee, Il Keun;Kim, Ki Hwan;Kim, Hong Sam;Yun, Sung Hwan;Kim, Woo Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.9-20
    • /
    • 2023
  • For highway concrete structures, the deterioration of the structure is accelerated due to the increase in the use of deicing materials, and sectional repair work is being frequently carried out to restore performance. However, after the repair work, re-damage such as cracks, delamination, and poor bond performance is exhibited in the repaired sectional area. In this study, overseas repair material requirements were first analyzed, and present domestic requirements were improved repair material performance through field surveys of common concrete structures, laboratory experiments, and test construction on a disused concrete bridge. In addition, performancebased quality requirements were presented so that all materials that meet the required performance can be applied, and different test methods for each material were unified into concrete test methods for consistent test results analysis. The considered performance requirements were compression strength, bending strength, and bond strength for structural properties, and length change rate, crack resistance, thermal expansion coefficient, and elasticity coefficient were for dimensional behavior. For resistance to chloride penetration resistance and freeze-thaw resistance were presented as durability. The proposed requirements for concrete repair materials are expected to contribute to the improvement of the quality of concrete sectional repair work in Korea.

The Role of CM for Fast track Completion of Urgent Typhoon Recovery Construction Projects - Gangwon-Do Cases - (수해복구공사 조기착공을 위한 CM의 역할 재조명 - 강원도 사례를 중심으로 -)

  • Kim, Kyoung Nam;Choi, Jae-ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.355-362
    • /
    • 2008
  • Fast track completion of urgent typhoon damage recovery construction project is becoming crucial for the prevention of the secondary damage from the next year typhoon, prompt psychological stabilization of flood sufferers, the early recovery of damaged infrastructure condition and so forth. As the recovery learning process has been continued for last consecutive typhoons and experts suggested, the keys in attaining the goals of the project (preventative, sustainable, cleaner and fast tracking development) are found to be the early contracting and improved competencies in project management especially during the design phase. It can be presumed that the former is attainable through administrative supports in the form of government guidelines, but the latter necessitates more research efforts. In this regards, this study aims to find a way how to lift up the current level of project management capability facing ever changing project mangement environment of urgent typhoon recovery project. By comparing the current level of application of government guidelines in flooded districts and analyzing the time required for each phase from design contracting to construction starting, several reformative ideas are illustrated in association with the necessity of adopting CM method in the deign phase. It is highly expected that CM application in the design phase can be an effective alternative in overcoming current limits in improving the quality of the project and prevent the delay due to the lack of expertise and professional workers in the owner side.

가스소식 - 대한기계설비건설협회, 가스 재난·재해예방 복구반 전국 소운영위원회 편성

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.299
    • /
    • pp.82-86
    • /
    • 2015
  • 가스사고 발생 시 소방서 및 한국가스안전공사가 응급대처를 하고 있다. 그러나 가스시설을 시공한 가스 시공업계는 가스설비에 대하여 기술적으로 잘 알고 있기 때문에 유관기관과의 적극적인 협조 속에 가스사고 재해복구 및 가스 설비의 응급조치를 신속히 한다면 제2차 사고를 예방할 수 있다. 이에 정부가 국가적 재난과 재해예방 활동에 적극적인 참여를 요청함에 따라 대한기계설비건설협회는 지역사회 봉사활동에 적극 참여하여 협회 홍보는 물론 위상강화에 기여코자 지난 5월 22일 가스 재난 재해예방 복구반 소운영위원회를 전국 시 도회에 설치했다.

  • PDF

Development of monitoring and control facilities with data logging and automatic recovery capabilities (데이터 로깅 및 자동 복구 기능을 갖춘 감시제어설비 모듈 개발)

  • Bae, Jae-hwan;Park, Sang-chul;Baek, Dong-geun
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.05a
    • /
    • pp.310-313
    • /
    • 2022
  • In the pipeline for supplying purified water to each household, measurements such as flow meters and pressure meters are installed at important points to monitor in real time. The measured data acquired to the central control room through wireless or wired communication, but data may not be acquired due to intermittent communication failures. Since then, even if the communication network is restored, data during the failure period is not stored on the site, or even if it is stored, data cannot be automatically stored in the database. Low cost with universally installed in the field in order to address these data logging by developing a module is compatible with PLC, automatically would like to make sure that we can recover in the database.

  • PDF

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

우리나라의 방사능방재 현황 - 영광 3호기 방사능방재합동훈련을 중심으로 -

  • 강영철
    • Nuclear industry
    • /
    • v.15 no.12 s.154
    • /
    • pp.52-58
    • /
    • 1995
  • 지난 11월 10일 한국전력공사 영광원자력본부에서는 원전에서의 방사능누출사고 발생시 사고복구 및 주민보호를 위해, 과학기술처$\cdot$내무부$\cdot$전라남도$\cdot$전라북도$\cdot$영광군$\cdot$고창군$\cdot$한국원자력안전기술원$\cdot$한국전력공사 본사$\cdot$영광원자력본부 관계자 및 지역주민 등 약 400여명이 참여한 대규모 방사능방재훈련이 있었다. 훈련은 일부 주민에 대한 실질적인 대피, 헬기 및 해상함정을 동원한 공중 및 해상의 환경방사능 측정, 화재진압, 부상자 구호, 발전소 사고복구, 관련기관간 유기적인 정보교환 등 실제 및 도상으로 처리하는 훈련을 통해 만약의 비상사고시 효율적으로 대처할 수 있는 능력을 배양하는 데 주안점을 두었다. 금번 훈련의 가장 중요한 의의는 우리나라에서 지역주민이 처음으로 대피훈련에 참여함으로써 실질적인 비상대응능력 확보에 기여하였다는 점이다.

  • PDF

Technological Development Trends for Underground Safety in Urban Construction (도심지 공사시 지하안전 확보를 위한 기술개발 동향)

  • Baek, Yong;Kim, Woo Seok
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.343-350
    • /
    • 2017
  • Amid increasingly saturated ground space, development of underground space has been booming throughout the world and excavation has been underway near the structure above or under the ground level. But the ground subsidence caused by improper or poor construction technologies, underground water leakage, sudden changes of stratum and the problem with earth retaining system component has been emerged as hot social issue. To deal with such problems nationwide, establishment of preventive and proactive disaster management and rapid restoration system has been pushed now. In this study, collection of the data on technology development trend to secure the underground safety was made, taking into account of internal change elements (changing groundwater level, damage to underground utilities, etc) and external change elements (vehicle load, earthquake and ground excavation, etc) during excavation. Amid the growing need of ground behavior analysis, ground subsidence evaluation technology, safe excavation to prevent ground subsidence and reinforcement technology, improvement of rapid restoration technology in preparation for ground subsidence and development of independent capability, this study is intended to introduce the technology development in a bid to prevent the ground subsidence during excavation. It's categorized into prediction/evaluation technology, complex detect technology, waterproof reinforcement technology, rapid restoration technology and excavation technology which, in part, has been in process now.

Restoration Efficiency Analysis of Expansive Material Implemented Trenchless Underground Cavity Restoration Method Varying Number and Location of Bore Holes (팽창재료를 이용한 지하 공동 비개착 복구공법에서 천공 개수 및 위치에 따른 복구효율 분석)

  • Choi, Byeong-Hyun;Lee, Kicheol;Lee, Junwon;Kim, Dongwook
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.4
    • /
    • pp.25-37
    • /
    • 2019
  • The conventional representative underground cavity restoration methods, which are mainly open-cut methods, require high cost and long period of time for the restoration. Therefore, various trenchless restoration methods have been proposed to improve these disadvantages. The underground cavity restoration method using the expansive material proposed in this paper is one of the trenchless methods. This method fills the underground cavity with high quality backfill soils through the small hole(s) at asphalt layer and compacts backfill soils by insertion of the expansive material within the cavity. In this study, the restoration method using expansive material was constructed in acrylic chamber. The restoration efficiency of the method was analyzed by the fill ratio and degree of relative compaction according to the location and number of bore holes. As a result of the experiment, the restoration efficiency and the optimum construction location were found to be irrelevant.