• Title/Summary/Keyword: 보증수수료

Search Result 8, Processing Time 0.023 seconds

Guaranteed Minimum Accumulated Benefit in Variable Annuities and Jump Risk (변액연금보험의 최저연금적립금보증과 점프리스크)

  • Kwon, Yongjae;Kim, So-Yeun
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.11
    • /
    • pp.281-291
    • /
    • 2020
  • This study used Gauss-Poisson jump diffusion process on standard assets to estimate the statutory reserves of Variable Annuity (VA) guarantees specified in Korean bylaw of insurance supervision and calculated guarantee fees and risks based on the model to see the effect of considering the jumps. Financial assets, except KOSPI 200, have fat-tailed return distributions, which is an indirect evidence of discontinuous jumps. In the case of a domestic stock index and foreign stock indexes(Korean Won), guarantee fees and risks decrease when jumps are considered in models of underlying assets. This is explained by decreases in standard deviations after the jump diffusion is considered. On the other hand, in the case of domestic bond indexes and a foreign bond index(Korean Won), guarantee fees and risks tend to increase when jumps are considered. Results from a foreign stock index(US Dollar) and a foreign bond index(US Dollar) were opposite to those from the same kinds of Korean Won indexes. We conclude that VA guarantee fees and risks may be under or over estimated when jumps are not considered in models of underlying assets.

감사원, 건설제도 개선방안 최종 확정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.57
    • /
    • pp.30-38
    • /
    • 1995
  • 감사원은 부실시공방지를 위해 건설제도 전반을 일대 혁신하는 총54개 사항의 건설제도 개선 방안을 최종 확정하고 재정경제원과 건설교통부등 관계부처에 통보했다. 앞으로 예정가격이 일정규모 이상인 낙찰자 선정방법이 가격경쟁에서 기술경쟁방식으로 개선되고, 공동도급으로 발주되는 공사의 입찰참가자격이 제한군 입찰대상업자만 입찰할 수 있도록 바뀐다. 또 감사원은 입찰 보증제도에서 일괄입찰보증하는 경우 매 공사별 입찰보증금 납부를 면제하도록 하고, 각종 보증 수수료를 건설업자의 성실도에 따라 차등 징수하도록 했다.

  • PDF

A Basic Study on the Methodology to Introduce Warranty Contracting for Pavements in Korea (도로포장 성능보증(Warranty) 계약제도 도입방안에 관한 기초연구)

  • Kim, Tae-Song;Seo, Yong-Chil;Lee, Sang-Beom;Koo, Jai-Dong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.66-74
    • /
    • 2008
  • Warranty contracting for pavements construction has been widely used in Europeans countries, Japan, and the U.S. and the benefits of warranty contract has been proven. This research investigated the European, U.S., and Japanese warranty contract policies and compared pros and cons. The most appropriate warranty contract policy solution is developed to fit in the Korean construction industry culture. Three main conclusions have been developed in this study: (1) performance specifications should be developed; (2) the systematic method is required to estimate the appropriate costs of performance bond and warranty period, etc.; and (3) short and long term plans for adopting performance warranty contract in Korea are suggested.

월간닭고기

  • 한국계육협회
    • Monthly Korean Chicken
    • /
    • v.4 no.5 s.35
    • /
    • pp.2-8
    • /
    • 1998
  • 소비기반 확충 ${\cdot}$ 수출산업 육성되야 - GSM-102자금 보증수수료율 인하 - 습도 관리에 초점을 맞추자! - 육계 깔짚 연속이용법 개발 - 98년 세계 브로일러 생산 증가 예상 - 작지만 선진양계 추구하는 뉴질랜드 - 호주, 수출식육 검사제도 개혁추진 - 중국, 육류 유통 ${\cdot}$ 판매 체제 개선 요구 - 필리핀 양계산업 감산 추세 - 계열사육농가 유류대 현수준 유지키로 - IMF체제이후, 저단가 메뉴 선보여 - 사료원료사용 대두박은 감소 채종박은 증가 - 닭고기, 건강한 식생활 유지에 효과 만점 - 미 농무부, IBP사 쇠고기 회수조치

  • PDF

Estimation of relative evaluation effort ratios for each EALs in CC 2.3 and CC 3.1 (CC 2.3과 CC 3.1의 보증수준별 상대적 평가업무량 배율 추정)

  • Kou, Kab-Seung;Kim, Young-Soo;Lee, Gang-Soo
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.17 no.4
    • /
    • pp.61-74
    • /
    • 2007
  • In Common Criteria evaluation scheme, sponsor and evaluator should estimate evaluation cost and duration of IT security system evaluation in contracting the evaluation project. In this paper, We analyzed study result that achieve at 2003 and 2005, and utilized part of study result. And we empirically estimate relative evaluation effort ratios among evaluation assurance levels($EAL1{\sim}EAL7$) in CC v2.3 and CC v3.1. Also, we estimate the ratios from 'developer action elements', adjusted 'content and presentation of evidence elements', and 'evaluator action elements 'for each assurance component. We, especially, use ratio of amount of effort for each 'evaluator action elements', that was obtained from real evaluators in KISA in 2003. Our result will useful for TOE sponsor as well as evaluation project manager who should estimate evaluation cost and duration for a specific EAL and type of TOE, in a new CC v3.1 based evaluation schem.

대한설비건설협회,기계설비공사 하자담보 책임기간,일반건설업체에 안내

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.10 s.183
    • /
    • pp.31-33
    • /
    • 2005
  • 기계설비공사의 하자담보책임기간은 <건설산업기본법시행령 제30조 관련 별표 4>, <국가를 당사자로 하는 계약에 관한 법 시행규칙 제70조 관련 별표 1> 및 <주택법시행령 제59조 제1항 관련 별표 6>에 의하여 2년 이내로 규정되어 있다. 그러나, 일부 발주기관 및 건설업체에서 기계설비공사의 하자담보책임기간을 법으로 정한 기간을 초과 설정하여 하자보수 비용 및 하자보증수수료 증가 등의 민원이 발생되고 있어, 건설교통부 및 재정경제부는 하자담보책임기간을 법으로 정한 기간을 준수하여 줄 것을 발주기관에 협조 요청한 바 있다. 이와 관련 대한설비건설협회에서는 기계설비공사 하자담보책임기간을 법으로 정한 기간을 정하여 줄 것을, 시공능력 300위 이내의 일반건설업체 대표이사와 하도급계약담당 부서장에게 요청하였다. 또한 계약 체결한 기계설비공사의 하자담보책임기간이 법으로 정한 기간을 상회하는 경우에는 회계통첩에 의하여 계약서상의 기간을 조정하여 하도급계약시에는 법으로 정한 하자담보책임기간을 설정하여 줄 것을 요청하였다.

  • PDF

"건설경기 어렵다고 하도급업체 힘들게 해선 안돼!" - 공정거래위원회, 하도급실태조사 실시 -

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.241
    • /
    • pp.34-37
    • /
    • 2010
  • 공정거래위원회가 지난해 말 20개 건설업체를 대상으로 하도급 현장조사를 실시한 결과 조사대상 업체 모두 법위반 행위를 하고 있음을 적발, 약 4억원의 과징금 부과와 총 51억원 상당의 위반금액을 936개 관련 하도급업체들에게 지급하도록 조치했다. 확인된 법위반 유형으로는 $\triangle$부당하게 하도급대금 결정 $\triangle$하도급대금 지연이자 미지급 $\triangle$어음할인료 수수료 미지급 $\triangle$선급금 지급 위반 $\triangle$지급보증 불이행 등이 대부분이다. 특히, 하도급공사 입찰시 입찰최저가가 이미 자기 실행예산보다 낮음에도 불구하고 이보다 더 낮추기 위해 금지되어 있는 재입찰 방식이나 추가 인하 수단을 동원한 바 있고, 자기 회사는 공공기관 등 발주자로부터 현금으로 공사대금을 받고도 하도급업체들에게는 현금이 아닌 장기어음 등으로 지급하는 등의 사례가 적발됨으로써 나쁜 관행이 여전히 만연되고 있는 것으로 나타났다.

  • PDF

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.