• Title/Summary/Keyword: 보수재

Search Result 843, Processing Time 0.03 seconds

Self Diagnosis Technique of Concrete Structure Repaired and Strengthened by Carbon fiber Sheets Using Optical fiber Sensors (광섬유 센서를 이용한 탄소섬유시트 보수보강 콘크리트구조물에서의 자기진단기법)

  • Kim, Ki-Soo
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.23 no.2
    • /
    • pp.133-139
    • /
    • 2003
  • In order to extend the life time of building and civil infra-structure, nowadays, patch type fibrous composite materials are widely used. Repaired concrete columns and beams gain the stiffness and strength, but they lose toughness and show brittle failure. Usually, the cracks of concrete structures are visible with naked eyes and the status of the structure in the life cycle is estimated with visible inspection. After repairing of the structure, crack visibility is blocked by repaired carbon sheets. Therefore, structural monitoring after repairing is indispensible and self diagnosis method with optical fiber sensor is very useful. In this paper, peel-out effects is detected with optical fiber sensors and the strain difference between main structure and repaired carbon sheets when they separate each other.

Reliability Test for the Repairing Joint in HVDC Sea Submarine Cable (HVDC 해저케이블 접속재 신뢰성 평가를 위한 인정시험)

  • Yang, B.M.;Park, H.S.;Park, J.W.;Kim, J.C.;Kang, J.W.;Yoon, H.H.
    • Proceedings of the KIEE Conference
    • /
    • 2008.10a
    • /
    • pp.77-78
    • /
    • 2008
  • HVDC 케이블은 장거리 전력전송, 국가간 계통연계 비동기 전력계통연계, 전력의 시장화에 따른 전력공급 제어 필요에 따라 세계적으로 널리 사용되고 있다. 국내에서는 현재 유일하게 제주-해남간 HVDC 해저케이블이 운영 중에 있으며, 향후 제주도 안정적인 전력공급을 위하여 2011년에 제주-육지간 HVDC 해저케이블이 추가로 건설될 예정이다. 그래서 HVDC 해저 케이블의 안정적이고 신뢰성 있는 운영을 하기 위한 보수자재용 접속재 개발 및 신뢰성 평가가 필요하게 되었다. 본 논문에서는 제주-해남간 운영중인 HVDC 해저케이블 보수자재용으로 개발된 접속재에 대한 신뢰성 평가 방법으로 가장 많이 사용되고 있는 Electra 175, 189의 기계적 및 전기적 평가에 대하여 기술하고자 한다.

  • PDF

Simulation on Optimum Repairing Number of Carbonated RC Structure Based on Probabilistic Approach (확률론을 고려한 탄산화된 RC 구조물의 최적 보수시기 해석)

  • Kwon, Seung-Jun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.3
    • /
    • pp.230-238
    • /
    • 2017
  • Carbonation is a representative deterioration for underground structure, which causes additional repair for service life. This study proposes a simplified equation for optimum repair timing without complicated probability calculation, considering initial and repair conditions For the work, initial service life, extended service life through repair, and their COVs(Coefficient of Variation) are considered, and the periods which can reduce number of repair are evaluated. Assuming the two service lives to be independent, the repair timings are derived from 10 to 50 years based on the probabilistic method, and the regression analysis technique for optimum repairing timing is proposed. Decreasing COV has insignificant effect on reducing repairing number but shows a governing effect on changes in probability near the critical repairing stage. The extension of service life through repairing is evaluated to be a critical parameter for reducing repairing number. The proposed technique can be efficiently used for maintenance strategy with actual COV of initial and additional service life due to repairing.

Compressive Strength Restoration Evaluation of Sandwich Composite Laminates Repaired by Scarf Method (패치 보수된 샌드위치 복합재 적층판의 압축시 강도회복 평가)

  • Kim, Jung-Seok;Yoon, Hyuk-Jin;Kim, Seung-Cheol;Seo, Sung-Il
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.110-114
    • /
    • 2009
  • This study is for the evaluation of compressive strength restoration of sandwich composite laminates with adhesively bonded scarf patches. It was used in this study that the sandwich composite laminate with an aluminum honeycomb core and CF1263 woven fabric carbon/epoxy faces was applied to the car body structure for Korean tiling train. In this study, it was damaged by low velocity impact and repaired using scarf repair method. Then, the compressive strength restoration of assessed by compressive after impact (CAI) test. From the test, it could be known that the compressive strength was restored up to 72% by only scarf repair method and 91% applied by an extra ply over the undamaged one.

Analysis of the Cause of Waterleakage in Residential Apartment Underground Parking Ground and the Review of the Repare Methods (공동주택 지하주차장의 누수원인 분석 및 보수방안 검토)

  • Oh, Sang-Keun;Choi, Sung-Min;Song, Je-Young
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.2 no.3
    • /
    • pp.255-264
    • /
    • 2014
  • This study analyzes the cause and the repairing method of water leak by parts of basement parking lot which is recorded to have a high defect frequency in apartment buildings. It has been assessed that the cause of water leakage on the first floor upper substrate is due to such factors as landscaping and weights. During construction or through other cases, it has been determined that cracks were produced in the apartment structure because the structure was weak and exposed to the effects of the substrate movement. The base floor and underground external walls are areas that are exposed to water pressure (uplife pressure), thus in normal cases the rear surface repair of the structure using sythetic rubberized polymer gel should be considered as an effective method. However, in cases where application of waterproofing layer is required in the structure due to high water pressure, using asystolic cement milk grout to form the waterproofing layer and applying water-swelling acrylic material into the cracked areas is considered to be highly effective.

Applicability of Epoxy Injection Method In Cracked RC Beams Considering Pre-Loading Conditions (재하상태를 고려한 RC 보의 에폭시 주입 보수공법의 적용성 평가)

  • Hong Geon-Ho;Shin Yeong-Soo
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.1 s.79
    • /
    • pp.88-93
    • /
    • 2004
  • The objective of this study was to investigate applicability of epoxy injection method to cracked RC beams and structural behavior of repaired RC beams considering pre-loading conditions. For this purpose, five test beams were fabricated under two experimental variables. The main variables of this experimental study were pre-loading conditions and repair methods. The two pre-loading conditions were selected as $70\%$ and $90\%$ of nominal strength and the repair methods were to repair the cracked RC beams under free loading after crack and sustained loading. The comparative study was executed to evaluate effects of pre-loading conditions on the structural behavior of the cracked RC beams after crack-repair. The strains of reinforcement and concrete and deflections of beams at each loading step were measured and evaluated. As the results of this study, repair methods have much influence on structural behavior of epoxy injected RC beams and epoxy injection method for cracks of RC structures is appeared to be efficient.

CO2 Evaluation of Reinforced Concrete Column Exposed to Chloride Attack Considering Repair Timing (보수시기를 고려한 염해에 노출된 콘크리트 교각의 탄소량 평가)

  • Kim, Seong-Jun;Kim, Young-Joon;Kwon, Seung-Jun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.2 no.1
    • /
    • pp.1-9
    • /
    • 2014
  • In this paper, $CO_2$ amount is evaluated considering repairing timing and unit $CO_2$ amount per repair method including various stage of material manufacturing, moving, and construction. Four mix proportions with mineral admixture are considered and repairing timing/numbers are simulated based on the results from Life 365 which can handle chloride penetration. Furthermore two repair methods (simple cover concrete replacement and replacement with electro-chemical method for removing chloride content) are considered and the related $CO_2$ emissions are evaluated. From the study, the case with high W/B (water to binder ratio) ratio shows smaller $CO_2$ emission in construction stage but it increases more rapidly with increasing number of repair. $CO_2$ emission considering electro-chemical method greatly increases with the increasing unit $CO_2$ for the repairing method. The numbers of jumping step (repairing number) are evaluated to be 9 for WB37-OPC, 18 for WB50-OPC, 4 for WB40-SG, and 7 for WB47-SG respectively. RC structures with the longer maintenance free period are evaluated to be advantageous for saving $CO_2$ emission.