• Title/Summary/Keyword: 보강지반

Search Result 1,421, Processing Time 0.024 seconds

An Analysis of Cut-slope Based on the Prediction of Joint Distribution inside the Cut-face (개착면 내부에서의 절리분포 예측을 통한 사면 해석)

  • Lee Chang-Sup;Chung Jin-Bo;Cho Taechin
    • Tunnel and Underground Space
    • /
    • v.14 no.6 s.53
    • /
    • pp.391-398
    • /
    • 2004
  • An algebraic algorithm for predicting the joint trace distribution on the cut-face of rock slope based on the orientations and the locations of joints investigated in the borehole has been developed. Joint trace prediction is manipulated by utilizing the three dimensional plane equations of both joint planes and projection face, and the extent of trace within the projection area is calculated by considering the persistence of each joint plane. Joint trace prediction method is efficiently applied for analyzing the stability and the adequacy of support design of Gimhae Naesam cut-slope, which is structurally unstable due to slumping. Structural characteristics of rock mass is investigated by performing DOM drilling and the potential rock mass sliding inside slope face is analyzed by examining the orientations of joint planes which can induce the slope failure. Also, the efficiency of anchor support design is evaluated by considering the joint trace distribution on the anchor installation area and its sliding potential.

Design of the reinforced concrete lining in bakun diversion tunnels (말레이지아 바쿤 가배수로 터널의 철근콘크리트 라이닝 설계)

  • 지왕률;임태정
    • Tunnel and Underground Space
    • /
    • v.9 no.1
    • /
    • pp.20-26
    • /
    • 1999
  • The completion of the Bakun Diversion Tunnel is subsequently to the Main Dam construction. Therefore, the completion date is very important for the Bakun Hydroelectric Project. Generally, the tunnel lining work as a finishing phase of the tunnelling project occupies a important portion as well as an excavation and a support work of the tunnels in respect to the construction cost and period. Internal section of Bakun Diversion Tunnel is designed circular shape to reduce the roughness of the water flow with 12 meters in diameter of total length 4314.6 meters of 3 tunnels. The lining thickness is varied between 500 mm and 700 mm depending on the structural condition. From the original Tender design of the Bakun tunnels, the required quantity of steel bars was 5,985 ton designed by Reinforced Concrete (RC) through the entire tunnel linings. During the detail design stage by the consideration of the rock conditions and various load conditions, we could suggest five kinds of RC lining type including plain concrete lining type. Through the detail design modification, we could reduce the required amount of steel bars to 2,178 ton, as a half of original Bill of Quantity. Finally, this design modification give us the time and cost saving effect to catch up the construction progress in time.

  • PDF

A Tunnel Mock-up Test and Numerical Analysis on Steel Fiber Reinforced Shotcrete (강섬유 보강 숏크리트의 터널모형실험 및 수치해석적 검증)

  • You, Kwang-Ho;Jung, Ji-Sung;Park, Yeon-Jun
    • Tunnel and Underground Space
    • /
    • v.18 no.2
    • /
    • pp.107-117
    • /
    • 2008
  • In this study, the failure and deformation characteristics of steel fiber reinforced shotcrete (SFRS) which is a primary tunnel support was investigated to find out ground-support mutual behavior. To this end, a mock-up of a tunnel was made and experimented with the conditions of lateral earth pressure coefficient 0.5 and 1.0. During the tests, 11 hydraulic cylinders were used for loading. for better simulation of the lateral earth pressure effect, these cylinders were controlled separately by two groups; crown and side wall. Meanwhile, the deformation of shotcrete was measured by 11 LVDTs. Backfill material was also used fur better load transfer from hydraulic cylinders to shotcrete. For the validation of the mock-up test results, 3D numerical analysis is carried out. To do numerical analysis under the same condition as a mock-up test, the load history curve which was obtained during the test was tried to be simulated using an individual FISH routine in the numerical analysis.

A Study on the Reinforcement of Rock Faults by Grouting (암석 절리면의 그라우팅에 의한 보강에 관한 연구)

  • Chun, Byung-Sik;Choi, Joong-Keun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.4 no.4
    • /
    • pp.45-51
    • /
    • 2003
  • Grouting materials in rock is grouted as vein type along the fault surface by the other way for soil and allow a change of characteristics in rock faults as a result of that. Therefore the deformation characteristics of rock faults after grouting differ as a direction and characteristic of grouted fault and stress condition of field rock. Thereby it must be analyzed the effect for deformation of rock according to characteristics of rock faults and characteristics of grouting materials to accurately evaluate the reinforced effect by grouting. But grouting method used in field until present depends on experience of workers, and inspection for those effects are evaluated by measurement of elastic wave velocity, permeability tests and etc. in field. In this study, it was investigated that the effects for shear characteristics of maximum shear strength, residual shear strength and etc. by comparison and analysis of test results which were worked by direct shear tests of rock faults with changing a type of grouting materials and the grouting depth(t) for average width(a) of fault surface roughness when OPC(Ordinary Portland Cement) and Micro cement was grouted in fault surface of field rock to evaluate characteristicsof the shear deformation for rock fault surface of dam by grouting.

  • PDF

Geotechnical Consideration on the Conservation of the Muryong Royal Tomb (무령왕릉의 보존을 위한 지반공학적 고찰)

  • Suh, Mancheol
    • Journal of Conservation Science
    • /
    • v.8 no.1 s.11
    • /
    • pp.40-50
    • /
    • 1999
  • A geotechnical research including observation of the movement of wall-structure, monitoring of groundwater, non-destructive geophysical investigation was conducted to workout a countermeasure to conserve the Muryong Royal Tomb which is the most extinguishable cultural property of the Baekje dynasty. Movement of the structure of Muryong Royal Tomb generally arises to the front chamber and its amplitude in a rainy season is twice of that in the dry season. It represents serious problem concerned about structural safety of the royal tomb in the rainy season. Movement of wall-structure is caused due to the rain infiltration through cracks in the quicklime layer within the soil mound on the top of the royal tomb and the change of the temperature inside of the tomb. Cracks found around the Muryong Royal Tomb are mostly spread in NW and SE of the tomb structure and it harmonizes with the direction of movement of wall-structure of the Muryong Royal Tomb. Counter-plans for safety and prevention of water-leakage that obstruct the movement of wall structures towards the direction of south are very important for the conservation of Muryong Royal Tomb. After getting rid of the cause of structural change by the restoration of the front chamber of the Muryong Royal Tomb, it needs to reinforce the quicklime layer for prevention of waterleak.

  • PDF

Quasi-Three Dimensional Stability Analysis of the Geosynthetic-Reinforced Soil Retaining Wall System (GRS-RW 보강토벽체 공법의 준3차원 안정해석)

  • 김홍택;박준용
    • Geotechnical Engineering
    • /
    • v.14 no.4
    • /
    • pp.177-204
    • /
    • 1998
  • In the present study, a method of quasi-three dimensional stability analysis is proposed for a systematic design of the GRS-RW(Geosynthetic-Reinforced Soil Retaining Wall) system based on the postulated three dimensional failure wedge. The proposed method could be applied to the analysis of the stability of both the straight-line and cove-shaped are. As with skew reinforcements. Maximum earth thrust expected to act on the rigid face wall is assumed to distribute along the depth, and wall displacements are predicted based on both the assumed compaction-induced earth pressures and one dimensional finite element method of analysis. For a verification of the procedure proposed in the present study, the predicted wall displacements are compared with chose obtained from the RMC tests in Canada and the FHWA tests in U.S.A. In these comparisons the wall displacements estimated by the methods of Christopher et at. and Chew & Mitchell are also included for further verification. Also, the predicted wall displacements for the convex-shaped zone reinforced with skew reinforcements are compared with those by $FLAC_{3D}$ program analyses. The assumed compaction-induced earth pressures evaluated on the basic of the proposed method of analysis are further compared with the measurements by the FHWA best wall. A parametric stduy is finally performed to investigate the effects of various design parameters for the stability of the GRS-RW system

  • PDF

Effect of Constrain Condition of Soil Nail Head on Slope Stability (쏘일 네일 두부 구속조건이 사면 안정성에 미치는 영향)

  • Kim, Yongeung;Ahn, Kwangkuk
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.2
    • /
    • pp.37-43
    • /
    • 2014
  • Natural disasters such as earthquakes and tsunamis occur suddenly, so that they cause massive loss of lives and property. Especially earthquakes represent a particularly severe threat because of the extensive damage accompanied by them. In Korea, an earthquake-resistant design has been rarely applied to a design or construction of slope. However, in resent years, the researches for earthquake-resistance have been performed because the importance on the earthquake-resistance is perceived and highlighted. Soil nail method, one of the slope stability methods, is excellent for its constructability and cost effectiveness, as compared with other stability methods. Also, this method has been widely used for reinforced construction for slope stability. The studies of soil nail method have been performed on the interaction behavior between nails and slopes as well as the varied load condition such as static load, dynamic load and so on. Nevertheless, there has been minimal research regarding the constraint condition of nail head. In this study, the numerical analysis was performed for identifying effect on slope stability for the constrain condition of the soil nail. The result shows that the resistance of constrained the nail head on reinforced slope is larger compared to the one of unconstrained nail head.

Evaluation of Domestic and Foreign Design Standards for Soil Nailing Method by Analysis of Slope Restoration Case (비탈면 복구사례 분석을 통한 쏘일네일링 공법의 국내외 설계기준 평가)

  • You, Kwang-Ho;Kim, Tae-Won
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.11
    • /
    • pp.11-22
    • /
    • 2019
  • Limit state design (LSD) and allowable stress design (ASD) are two main types of soil nailing design methodologies. In the LSD method, stability is determined by applying individual coefficients to ground strength, working load and etc. The ASD method calculates the safety factor and compares it with the minimum safety factor to determine the stability. The global design trend of soil nailing system is changing from the ASD method to the LSD method. The design method in Korea still adopts the ASD philosophy while others mostly do the limit state design. In this study, four soil nail design methods, 'FHWA GEC 7' in U.S. (2015), 'Clouterre' in France (1991), 'Soil nailing - best practice guidance' in U.K. (2005), 'Geoguide 7' in Hongkong (2008), and 'Design guide for slope in construction work' in Korea (2016) were applied to the evaluation of the stability and the results were analyzed comparatively in brief. It is revealed that the design method of 'the overall stability of soil nail walls' in Korea is the most conservative and next those by FHWA, Clouterre and CIRIA become more conservative in order. However, the difference of results obtained from FHWA and Clouterre is negligible. Also, this study found out that efforts to improve domestic design criterion are needed.

Consideration of Engineering Strength and Filling Characteristics for Rubble-Ground Modification Method with Grout Injection (그라우트 주입식 사석기초 보강 공법의 개량체 강도 및 충전성에 대한 실험적 검토)

  • Kim, Hyeong-Ki;Han, Jin-Gyu;Kim, Jeong Eun;Ryu, Yong-Sun;Nguyen, Anh Dan;Kang, Gyeong-O;Kim, Young-Sang
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.5
    • /
    • pp.47-59
    • /
    • 2022
  • A series of experiments were performed to investigate the design and application of a rubble-ground modification method with grout injection. A small-sized injection machine was designed, and the grouts with various mix proportions were injected into 25 mm aggregate using the designed small-sized injection machine. With the compressive strength of the grout ranging from 20 to 80 MPa, the uniaxial compressive strength of the grout-filling bodies with clean gravels was higher than 1/6th of the strength of grouts themselves. However, this fraction may reduce depending on the interface conditions. The erosion resistance of the hardened grout was evaluated, and it was determined that the grout with a strength greater than 15 MPa did not require erosion consideration. Moreover, a full-scale injection test was performed for 25 cm-sized rubbles in cages with a diameter greater than 1 m and a height of 1.2 m to evaluate the filling characteristics of the grout. Results from this test indicated that the grout flowability sensitively influenced the filling characteristics.

The Short-term Safety Factor Considering Passive Resistance Effect of Bar Anchor Based on Smart Construction (스마트 건설기반의 강봉앵커 수동저항 효과를 고려한 단기 안전율)

  • Donghyuk Lee;Duhyun Baek
    • Journal of the Korean GEO-environmental Society
    • /
    • v.25 no.4
    • /
    • pp.29-35
    • /
    • 2024
  • This is an analytical study to confirm the passive resistance effect before post-tensioning of steel bar anchors. When using a steel bar as a permanent anchor, if displacement occurs within the slope even before the head load is applied, the displacement is suppressed by the passive resistance caused by the interaction between the steel bar, grout, and surrounding soil. Accordingly, the shape of the failure surface and changes in the safety factor were examined using limit equilibrium analysis and finite element analysis targeting sites where steel bar anchors were actually applied. It was found that the safety factor of the slope reinforced with steel bar anchors is 2.02 using finite element analysis, which is about 5.9% smaller than 2.14 using limit equilibrium analysis. Also, the location of the failure surface was found to be deeper compared to the unreinforced slope. Likewise, the factor of safety has a 153% and 163% increase using finite element method and limit equilibrium analysis, respectively. In addition, the maximum displacement occurs in the lower unreinforced section within the slope, and the displacement is found to be reduced by 42 to 83% at the location where the steel bar anchors are installed.