• Title/Summary/Keyword: 병설터널

Search Result 35, Processing Time 0.03 seconds

Study on Asymmetric Settlement Trough induced by the 2nd Tunneling of Twin Shield Tunnels in Clay (점토지반 병설쉴드터널에서 후행터널 굴착에 의한 비대칭 침하형상 연구)

  • Ahn, Chang-Yoon;Park, Duhee
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.10
    • /
    • pp.55-63
    • /
    • 2021
  • The construction of shield tunnels is being expanded from the small-bore tunnels such as power, telecommunications, water supply, and sewerage pipes to the large bore tunnels such as road and railway tunnels with the advancement of the shield TBM (Tunnel Boring Machine) manufacturing technology. Accordingly, the construction of twin shield tunnels is increasing. Peck (1969) reported that the surface settlement trough is well described by a Gaussian distribution on a single shield tunnel. Hereafter, many studies about the surface settlement trough were performed by the field measurement, laboratory model test, and numerical analysis. This study confirmed that the additional surface settlement trough induced by the 2nd tunneling were well described by using each Gaussian curve for the right and left sides of the settlement trough.

Case study on design and construction for cross-connection tunnel using large steel pipe thrust method in soil twin shield tunnels underneath airport (공항하부 토사 병설 쉴드터널에서 대구경 강관추진에 의한 횡갱 설계/시공사례 연구)

  • Ahn, Chang-Yoon;Park, Duhee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.325-337
    • /
    • 2021
  • On the road and rail tunnels, the evacuation pathway and facilities such as smoke-control and fire suppression system are essential in tunnel fire. In the long twin tunnels, the cross-connection tunnel is usually designed to evacuate from the tunnel where the fire broke out to the other tunnel. In twin shield tunnels, the segment lining has to be demolished to construct the cross-connection tunnel. Considering the modern shield TBM is mostly the closed chamber type, the exposure of underground soil induced by removal of steel segment lining is the most danger construction step in the shield tunnel construction. This case study introduces the excavation method using the thrust of large steel pipe and reviews the measured data after the construction. The large steel pipe thrust method for the cross-connection tunnel can stabilize the excavated face with the two mechanisms. Firstly, the soil in front of excavated face is cylindrically pre-supported by the large steel pipe. Secondly, the excavated face is supported by the plugging effect caused by the soil pressed into the steel pipe. It was reviewed that the large steel pipe thrust method in the cross-connection tunnel is enough to secure the construct ability and stability in soil from the measurement results about the deformation and stress of steel pipe.

A study on construction simulation of road tunnel using Decision Aids for Tunneling (DAT) (터널의사결정체계 (DAT)를 이용한 도로터널의 시공 시뮬레이션 연구)

  • Min, Sangyoon;Kim, Taek Kon;Einstein, H.H.;Lee, Jun S.;Kim, Ho Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.2
    • /
    • pp.161-174
    • /
    • 2003
  • Applicability of the Decision Aids for Tunneling (DAT) technique is investigated in this study to better understand the efficiency of the decision making process during tunnel construction. For this, a traffic tunnel under construction is adopted and information on the construction procedure, i.e., overall geology, unit cost and construction time for each excavation process, is provided periodically. Various scattergrams in which cost-time simulation results are plotted are obtained according to the simulation methods and final prediction on the construction time/cost is made. It is found that the uncertainty in the cost distribution is greater than the uncertainty in the time distribution for each cycle simulation and the uncertainties in time and cost for the one time simulations are comparable. Future work will be concentrated on the updating scheme using the face mapping data and various parametric studies will also be performed.

  • PDF

Reduced model experiment to review applicability of tunnel pillar reinforcement method using prestress and steel pipe reinforcement grouting (프리스트레스 및 강관보강 그라우팅을 이용한 터널 필라부 보강공법의 적용성 검토를 위한 축소모형 실험)

  • Kim, Yeon-Deok;Lee, Soo-Jin;Lee, Pyung-Woo;Yun, Hong-Su;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.495-512
    • /
    • 2022
  • Due to the concentration of population in the city center, the aboveground structures are saturated, and the development of underground structures becomes important. In addition, it is necessary to apply the reinforcement construction method for the pillar part of the adjacent tunnel that can secure stability, economy, and workability to the site. In this study, the tunnel pillar reinforcement method using prestress and grouting was reviewed. There are various reinforcement methods that can compensate for the problems of the side tunnel, but as the tunnel pillar construction method using prestress and grouting is judged to be excellent in field applicability, stability, and economic feasibility, it is necessary to review the theoretical and numerical analysis of the actual behavior mechanism. Therefore, a scaled-down model experiment was conducted. The reduced model experiment was divided into PC stranded wire + steel pipe reinforcement grouting + prestress (Case 1), PC strand + steel pipe reinforcement grouting (Case 2), and no reinforcement (Case 3), and the displacement of the pillar and the earth pressure applied to the wall were measured. Through experiments, it was confirmed that the PC stranded wire + steel pipe reinforcement grouting + prestress method is the most excellent reinforcement method among various construction methods. It was judged that it could be derived.

A comparative study on the stability evaluation of double deck tunnel in terms of excavation (대심도 복층터널에 대한 굴착 안정성 평가 비교 연구)

  • Jang, Namju;Gang, Han-gil;Kim, Kihwan;Choi, Chang-rim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.155-166
    • /
    • 2019
  • It is necessary to construct underground in the metropolis. Road traffic has reached saturation point. The city has several underground road construction projects. In abroad, double deck tunnels are planned and constructed. It is attained a high level of underground development technology. In case the double deck tunnel (2 lane) is planed instead of the bidirectional tunnel (2 lane), excavation area is similar. But tunnel width is decreased. The reduced width can cut cost for the tunnel reinforcement. This study evaluates the stability of excavation on double deck tunnel. By the assessment of the strength-stress ratio and strength reduction method, quantitative analysis is conducted between double deck tunnel and the bidirectional tunnel.

Research on the support system and reinforcement range of cross passage tunnel (피난연결통로터널의 지보패턴 및 보강범위 연구)

  • Jung, Min;Han, Ki-Hwan;Park, Jin-Won;Baek, Kyung-Min;Moon, Hoon-Ki
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.3
    • /
    • pp.201-213
    • /
    • 2010
  • Recently, plans of tunnel and construction have increased. Unfortunately, the more we have tunnels, the more we have accidents in there. Because an accident or a fire in the tunnel is fatal to user safety, social concerns are focusing on the disaster prevention facilities. Cross passage tunnel is regarded as one of the useful disaster prevention facilities, which is increasing, while there were only few studies about the support system. This study tried to verify whether the support system is appropriate or not with empirical methods-theoretical methods and back analysis using measurement data. Additionally, we also looked into the range of reinforcement in accordance with strength/stress ratio of rock mass.

Tunnel pillar reinforcement effect using PC stranded wire and groutings (PC강연선 및 그라우팅을 이용한 터널 필라부 보강효과)

  • Yeon-Deok Kim;Soo-Jin Lee;Pyung-Woo Lee;Hong-Su Yun;Sang-Hwan Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.2
    • /
    • pp.43-63
    • /
    • 2023
  • With the concentration of the population in the city center and the saturation of the structures on the ground, the development of the underground structures becomes important and the construction of an adjoining tunnel that can reduce the overall problems is respected. In addition, it is necessary to apply the reinforcement construction method for the pillar part of the adjacent tunnel that can secure stability, economy and workability of the site. In this study, the tunnel pillar reinforcement method using prestress and grouting was reviewed. There are various reinforcement methods that can compensate for the problems of the side tunnel, but as the tunnel pillar construction method using prestress and grouting is judged to be excellent in field applicability, stability and economic feasibility, theoretical and numerical analysis of the actual behavior mechanism are conducted. Numerical analysis is divided into PC stranded wire + steel pipe reinforcement grouting + prestress (Case 1), pillar part tie bolt reinforcement (Case 2), pillar part non-reinforcement (Case 3) under the same ground conditions, and the maximum value of the celling displacement, internal displacement, and member force, the stability was confirmed. Through numerical analysis, it was confirmed that Case 1 which reinforced the PC stranded wire, was the best construction method and if it is verified and supplemented through field experiments later, it will be possible to derive superior results in terms of displacement control and member force than the currently applied reinforcement method was judged.