• Title/Summary/Keyword: 변위 계측

Search Result 679, Processing Time 0.02 seconds

Analysis for Measuring Displacement of Tunnel Face using Horizontal Inclinometer (터널 시공 중 수평경사계를 이용한 변위 분석)

  • Jang, Won-Yil;Yang, Hyung-Sik;Chung, So-Keul
    • Tunnel and Underground Space
    • /
    • v.17 no.5
    • /
    • pp.428-434
    • /
    • 2007
  • Displacement of tunnel face is important issues for the evaluation of tunnel safety. In this study, conventional convergence and displacement data measured from horizontal inclinometer were analyzed to investigate the trend and characteristics of tunnel deformation during construction. Trend of measured displacement agreed with general understanding of tunnel deformation prior to excavation. It shows that displacement measured from horizontal inclinometer can be used to preestimate the total deformation of tunnel.

Forecasting Final Displacement With Displacement Functions Using Deformation Measurements While Constructing a Tunnel (계측치와 변위함수에 의한 시공 중인 터널의 최종변위 예측)

  • Kim, Chee-Hwan
    • Tunnel and Underground Space
    • /
    • v.20 no.6
    • /
    • pp.408-420
    • /
    • 2010
  • It is important to forecast the final deformation of a tunnel during construction for evaluating its mechanical stability. In this study, the final deformation of a tunnel is forecasted by fitting tunnel deformations measured while excavating to a displacement function and exterpolating it. The tunnel for the study was built in two stages divided into an upper and a lower part. During the lower part construction of the tunnel, the displacement function forecasts the final incremental displacement well compared to the increment measured after completion of the tunnel. It is because the critical initial displacement occurred on passing the measurement pins can be adequately measured during excavating the lower part, which can not be measured during the upper part excavation of the tunnel.

A Back Analysis Study for the Assessment of Tunnel Lining Safety Using Numerical Analysis Model (수치해석 기법을 이용한 터널 라이닝 안전성 평가에 관한 역해석 연구)

  • 박치현;김창용;이희근
    • Tunnel and Underground Space
    • /
    • v.9 no.4
    • /
    • pp.296-305
    • /
    • 1999
  • In ordinary back analysis it if hardly possible to obtain the mechanical properties of tunnel lining by using commonly measured displacements of tunnel lining, because only a few displacements could be measured at the site. Therefore, it is necessary to develop a new method which can evaluate the state of stresses of tunnel by using measured data. In this study, in order to assess tunnel lining stability by estimating its stresses with a few measured displacements, a formulation of back analysis method was proposed. The accuracy of results were investigated through the parametric study for several types of measurement model of two dimensional elastic lining. This new back analysis method to assess tunnel lining stresses and strains with a few numbers of measured displacements showed high accuracy and good applicability when compared to the results of numerical experiments by FEM. The method has been tested on subway tunnel and its applicability has been confirmed by comparing field and analytical data. It is verified that the stress on the tunnel lining can be obtained by only more than 3 point of input displacements without any condition of external loads.

  • PDF

A Study of the Optimal Displacement Analysis Algorithm for Retaining Wall Displacement Measurement System Based on 2D LiDAR Sensor (2D LiDAR 센서 기반 흙막이 벽체 변위 계측 시스템의 최적 변위 분석 알고리즘 연구)

  • Kim, Jun-Sang;Lee, Gil-yong;Yoou, Geon hee;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.70-78
    • /
    • 2023
  • Inclinometer has several problems of 1)difficulty installing inclinometer casing, 2) measuring 2D local lateral displacement of retaining wall, 3) measurement by manpower. To solve such problems, a 2D LiDAR sensor-based retaining wall displacement measurement system was developed in previous studies. The purpose of this study is to select a displacement analysis algorithm to be applied in the retaining wall displacement measurement system. As a result of the displacement analysis algorithm selection, the M3C2 (Multiple Model to Model Cloud Comparison) algorithm with a displacement estimation error of 2mm was selected as the displacement analysis algorithm. If the M3C2 algorithm is applied in the system and the reliability of the displacement analysis result is secured through several field experiments. Convenient management of the displacement for the retaining wall is possible in comparison with the current measurement management.

Influence of Zero Reading on Predicting Crown Displacement of Tunnel (초기계측 시점이 터널 내공변위 예측에 미치는 영향분석)

  • Kim, Kwang-Yeom;Kim, Ho-Geun;Seo, Youg-Seok
    • Tunnel and Underground Space
    • /
    • v.22 no.3
    • /
    • pp.214-220
    • /
    • 2012
  • Deformation behaviour of rock mass around an opening measured during tunnel excavation is very important in order to assess the stability of the tunnel. Unfortunately displacement measured only after the installation of displacement measuring device can be acquired, which results in inevitably excluding the pre-displacement occurred and accumulated before the displacement measuring devices are installed. So it is very important to consider the pre-displacement based on the elapsed time before zero reading after deformation behaviour started. In this study, the accuracy of total estimated displacement depending on the distance between face and measurement position is calculated by statistical non-linear fitting on measurable displacement data. Besides, the influence of the unavoidable measurement error is considered by using Monte-Carlo simulation. As a result, the faster the initial reading started and the smaller the measurement error is, the higher the accuracy of estimating total displacement is obtained.

Longitudinal Deformation Profile in Tunnel using Measured Data (계측자료를 이용한 터널의 종단변형도)

  • Jang, Won-Yil;Yang, Hyung-Sik;Chung, So-Keul
    • Tunnel and Underground Space
    • /
    • v.18 no.5
    • /
    • pp.338-342
    • /
    • 2008
  • Longitudinal deformation profile(LDP) has been obtained mostly by numerical analysis. In this study, LDP was plotted by measured data from horizontal inclinometer and crown settlement. Deformation of foe ahead was determined by comparing to the maximum deformation point and deformation of after excavation was determined by regression of the measured crown settlement data. The result shows that crown deformation began as f3r as 3D ahead of the face. Crown settlement at the face was 40% of ultimate deformation, which was 10% higher than numerical results, and the deformation converged after excavation of 4D.

Relations between Initial Displacement Rate and Final Displacement of Arch Settlement and Convergence of a Shallow Tunnel (저심도 터널의 천단침하 및 내공변위의 초기변위속도와 최종변위의 관계)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.110-119
    • /
    • 2013
  • It is generalized to measure the arch settlement and convergence during tunnel construction for monitoring its mechanical stability. The initial convergence rate a day is defined from the first convergence measurement and the final convergence defined as the convergence measured lastly. The initial and the final tunnel arch settlement are defined like the preceding convergence. In the study, the relations between the initial and final displacements of a shallow tunnel are analyzed. The measurements were performed in the tunnel of subway 906 construction site in Seoul. The overburden is 10-20 m and the tunnel goes through weathered soil/rock. The width and height of the tunnel are about 11.5 m, 10m, respectively. So this is a shallow tunnel in weak rock. The length of tunnel is about 1,820 m and the tunnel was constructed in 2 stages, dividing upper and lower half. The numbers of measurement locations of arch settlement and convergence are 184 and 258, respectively. As a result, the initial displacement rate and the final displacement are comparatively larger in the section of weathered soil.

Measurement of Tunnel 3-D Displacement using Digital Photogrammetry (디지털 영상을 이용한 터널 3차원 변위 계측)

  • Kim, Kwang-Yeom;Kim, Chang-Yong;Lee, Seung-Do;Seo, Yong-Seok;Lee, Chung-In
    • The Journal of Engineering Geology
    • /
    • v.17 no.4
    • /
    • pp.567-576
    • /
    • 2007
  • In order to assess the on-site applicability of 3D absolute displacement monitoring of tunnel using digital photogrammetry, the displacement of the optical target placed at the measurement section was investigated, as planned in the OO tunnel construction site. The targets on 3 measurement lines only were considered for each point of measurement for the reconstruction of 3D cubic model for the digital vision monitoring. For each 3D model, 3 or more images have to be obtained at each point. On the last 2 measurement lines, 6 targets (crown, left and right walls) were continuously overlapped to construct 3D models so that 6 or more apices can be shared by 2 3D models. In order to compare the measurement methods of 3D absolute displacements in tunnel excavation, i. e, total station and digital image measurement, both the digital image measurement and optical measurement were conducted for 10 times in the same work section. The time and measurement results of both methods were compared.

Multimetric Measurement Data Monitoring System Using Sigmoid Function (시그모이드 함수를 이용한 다중 계측데이터 모니터링 시스템)

  • Jeong-Ho Song;Jun-Woo Shin;Heui-Soo Han
    • The Journal of Engineering Geology
    • /
    • v.33 no.1
    • /
    • pp.137-149
    • /
    • 2023
  • In order to intuitively grasp the earth pressure direction acting on the structure and displacement state, displacement data in the horizontal and vertical directions were processed using the sigmoid function. A displacement coordinate system was set up for each axis. The system can intuitively check the current displacement and assess the management stage of each point. A displacement path can be compiled from continuously recorded points, allowing trends in the displacement's history and stress direction to be known. Analysis of data measured for excavated ground, found that displacement occurred in the direction of destressing at all points, and that the points' management state steady. Similar behavior trends were found among measurement points with high spatial correlation, whereas differing behavior trends occurred among measurement points with low spatial correlation. If the correlation analysis of the precursor and behavior area is performed using the continuously distributed surface settlement data and displacement coordinate system, it will be possible to predict the failure time and area.

쉴드터널의 계측시스템 구축

  • 진치섭;김성준
    • Computational Structural Engineering
    • /
    • v.8 no.2
    • /
    • pp.12-25
    • /
    • 1995
  • Shield 터널의 굴진에 따른 지반변위를 Real Time으로 측정하여 지반변위를 가장 작게 일으키는 굴진 Pattern을 결정하는 것이 계측시스템구축의 목적이다. 대상지반은 부산시 구포전력구 현장의 대표적인 지반이라 생각되는 Silt 층인 #11 작업구 인근과 모래층인 #7 작업구 인근에서 각각 실시하였다. 계기매설에서 계측결과분석은 1994년 6.22-11.5에 수행하였다. 계측결과로부터 얻어지는 효과는 Shield 터널굴진에 따른 지반변위의 형태와 크기를 파악할 수 있고 가장 적절한 굴진 Pattern 제시로 인근 매설물에 영향을 미치지 않는 시공을 가능케 하며 자동계측의 계기매설 및 계측기술을 습득할 수 있다. 본 전력구 공사에서는 자동계측용 Computer Software 및 관련장비를 확보하고 국내 최초의 Shield 터널 자동계측을 수행하였다.

  • PDF