• Title/Summary/Keyword: 범용 프로젝트

Search Result 30, Processing Time 0.023 seconds

A Study on Constructing and Customizing an AtoM System (AtoM 시스템의 구축과 커스터마이징 방법에 관한 연구)

  • An, Dae-Jin;Kim, Ik-Han
    • The Korean Journal of Archival Studies
    • /
    • no.45
    • /
    • pp.5-50
    • /
    • 2015
  • In 2012, the International Council on Archives(ICA) distributed AtoM public release, an archival description software based on web, for free to support small archival institutions. The purpose of AtoM project was to let a single or multiple repositories describe archival materials based on ICA descriptive standards and access via a web browser. The value of AtoM project is to promote actual business experience by sharing technical expertise and form active community between users and developers. Recently, there is a growing interest in open source software in the field of domestic record management. This interest is to not only reduce cost, but to escape technology dependencies and to address requirements on the field. The critical mind of this study lies in the fact that there is no practical methodology to establish AtoM system. Even when using AtoM itself, basic tasks such as the migration of the existing data or the improvement of user interface are required. That is why this study suggests the process and methodologies to establish and customize archival information system based on AtoM software.

The Study on the Standards of Thesaurus Construction Based on ISO 25964 (ISO 25964를 통해 살펴본 시소러스 구축 표준에 관한 연구)

  • Park, Ok-Nam
    • Journal of Information Management
    • /
    • v.42 no.2
    • /
    • pp.43-65
    • /
    • 2011
  • Despite a long tradition and rich discussion of thesaurus construction, more research is needed to make standards for thesaurus construction applicable to practice. Recently, in order to reflect changing information technology environment, and provide consistency of terms and abbreviations of standards, ISO committee has been planning to publish ISO 25964. Therefore, the study introduces ISO 25964, reveals main focal points of ISO 25964, and finally discusses suggestions to improve ISO 25964. The study employs qualitative content analysis of ISO 25964, ISO 2788: 1986, and ANSI/NISO Z39.19 - 2005.

An Application of Construction Sequence Analysis for Checking Structural Stability of High-Rise Building under Construction (초고층 건물의 시공 중 구조적 안정성 검토를 위한 시공단계해석의 적용)

  • Eom, Tae-Sung;Kim, Jae-Yo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.22 no.3
    • /
    • pp.211-221
    • /
    • 2009
  • With recent trends of super-tallness, atypical plan shapes and zoning constructions in high-rise buildings, a structural stability of the building under construction is arising as a key issue for design and construction plan. To ensure the structural stability under construction, the differential column shortening of vertical members, the lateral displacement of tower frames, and differential settlement of raft foundation by unbalanced distributions of a tower self-weight before the completion of a lateral load resisting system should be checked by construction sequence analysis, which should be performed by systematic combinations with structural health monitoring, construction compensation program, and construction panning. This paper presents the scheme of zone-based construction sequence analysis by using the existing commercial analysis program, to check the stability of high-rise building under construction. This scheme is applied to 3-dimensional structural analysis for a real high-rise building under construction. The analysis includes real construction zoning plans and schedules as well as creep and shrinkage effects and time-dependent properties of concrete. The simplified construction sequence and assumed material properties were continuously updated with the change on construction schedule and correlations with in-situ measurement data.

Study on the Scientific Functional Investigation of Steel Space Truss Structures by using Technology Tree Methodology (기술트리를 이용한 입체트러스 강구조물의 과학적 기능분석 방법론에 관한 연구)

  • Lee, Dong Kyu;Kim, Do Hwan;Kim, Jin Ho
    • Journal of Korean Society of Steel Construction
    • /
    • v.25 no.4
    • /
    • pp.321-333
    • /
    • 2013
  • This study presents a practice of a scientific methodology, i.e., technology tree to describe hierarchies of functions and technologies of research projects. In this study functional developments of a well-known steel space frame truss are dealt with for an application of the technology tree process to execute the maintenance of road tunnels without blocking vehicles. It is verified that established results of technology tree process can be linked to a proof process of revealed functions and component technologies such as reference works and structural analyses. In the future the technology tree methodology can be extendedly used for an effective tool setting up research plans and developing integrated technologies of a specific item such as a steel structure.

A Study on Project Resource & Information Management with Internet Application(PRIMA system) (디지털 정보화를 통한 현장 자원 및 정보관리 기술에 관한 연구(PRIMA 시스템))

  • Kim Oe-Gon;Lee Dong-Ryul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.88-97
    • /
    • 2001
  • The Internet, the main issue of a new millennium, is being researched vitally for the progress of the construction industry, and the construction industry is considered to be led into a high-value added state-of-arts technology industry through CALS. Even if many construction companies gradually widen the use of the Internet for various purposes such as an electronic bidding system and an e-commerce system, the companies are still demanded to use the Internet more broadly and practically. Hence, the need for a tool for fast decision making and an effective construction management has risen. The PRIMA system has been developed specifically focused on meeting with those recent changes of the construction industry. This system is composed of three parts. Those are Just In Time(JIT) management, integrated application of man power${\cdot}$safety${\cdot}$work management and decision making process based on real-time information in the Internet. The usefulness of the PRIMA system has already been proved in a super-scale construction project. As the Internet environment get improved the use of the tool will be spread out gradually for many construction projects, regardless their size and location.

  • PDF

Platform Development toy Systematic Support of Design Collaboration between SMEs (중소기업간 디자인 협업의 체계적 지원을 위한 플랫폼의 개발)

  • 박지숙;박선화;윤주현;이경전
    • The Journal of Society for e-Business Studies
    • /
    • v.8 no.4
    • /
    • pp.207-221
    • /
    • 2003
  • Most commercially available collaboration support systems are not proper for small enterprises in a specific area such as small e-design companies, because they are focused on general functionalities, required by most large enterprises. In this paper, we analyze the requirements for improving communication environments of small e-design companies, and propose an advanced communication management tool which reflects those requirements. The communication platform focuses the acknowledgement process by customer and the schedule sharing and management between project members. The proposed system suggest a new research direction which supports the systematic collaboration with external entities such as customers rather than the unsystematic collaboration between internal members, and improves the communication environment of those small e-design companies that are desperately in need of a cost-effective way to carry out projects, and will help in the process of successful projects.

  • PDF

Basic Study on the MSI service prototype for preparation of e-Navigation era (e-Navigation 준비를 위한 MSI 서비스 프로토타입 기초 연구)

  • Oh, Se-Woong;Jung, Min;Park, Jin-Hyung
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2014.10a
    • /
    • pp.42-43
    • /
    • 2014
  • As MSI(Maritime Safety Information), navigational, meteorological warnings and forecasts, was included as one of service in the MSP(Maritime Service Portfolio), which is lists of shore based service in the e-Navigation driven by IMO for safety navigation and marine protection, and was tested in the european test bed project on e-Navigation, it's considered as one of important e-Navigation service. This paper developed a prototype of MSI service to prepare e-navigation era, which is very important in a navigation environment. Current status on MSI and NAVTEX was surveyed, and several points on limitations and improvements in the NAVTEX operations were summarized. Basic study on the MSI service prototype was developed based on S-100, which is recognized as baseline to develop CMDS(Common Maritime Data Structure) of e-Navigation.

  • PDF

Decision Making Model using Multiple Matrix Analysis for Optimum Construction Method Selection (다중 매트릭스 분석 기법을 이용한 최적 건축공법 선정 의사결정지원 모델)

  • Lee, Jong-Sik;Lim, Myung-Kwan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.4
    • /
    • pp.331-339
    • /
    • 2016
  • According to high-rise, complexation, and enlargement of buildings, various construction methods are being developed, and the significance of construction method selection about main work types has emerged as a major interest. However, it has been pointed out that hand-on workers cannot consider project characteristics carefully, and they lack an objective standard or reference for main construction method selection. Hence, the selection is being made depending on hand-on workers' experience and intuition. To solve this problem, various studies have proceeded for construction method selection of main work types using Artificial Intelligence like Fuzzy, AHP and Case-based reasoning. It is difficult to apply many different kinds of construction method selection to every main work type with consideration for characteristics of work types and condition of a construction site when selecting construction method in the field. Accordingly, this study proposed the decision-making model which can apply to fields easily. Using matrix analysis and liner transformation, this study verified consistency of study models applied in the process of soil retaining selection with a case study.

A study on the optimal design of desander according to sediment trap efficiency (유사 입경별 차집 효율에 따른 수력발전댐 Desander 적정 규모 설계 연구)

  • Chang, Dong Eil;Lee, Sang Hwa;Kwon, Oh Sung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.247-247
    • /
    • 2019
  • 수력발전 사업에 있어 Desander 구조물은 주로 고산지대 수력발전댐의 Run-of-river 형식의 발전방식에서 유사로 인한 터빈의 손상을 방지하기 위한 목적으로 설치된다. Desander의 적정 규모는 터빈의 손상을 일으킬 수 있는 유사 입경에 대해 안정적으로 침전을 시킬 수 있는 폭/길이/깊이로 평가할 수 있으며 상대적으로 Desander의 규모가 크게 설계된 경우 초기 공사비 증가하고 반대로 규모가 작게 설계된 경우 터빈의 교체 주기 단축으로 인한 유지관리비가 증가된다. 현재까지 일반적인 Desander 구조물의 설계 방식은 제거 입경의 침전 속도, 유입유량 및 깊이를 변수로 사용하여 경험식(L. Sudry method, Guicciardis method 및 Rouse method)을 통해 규모를 결정해 왔다. 하지만, 3-D 전산유체해석을 통해 유속 흐름 분석으로 직 간접적 Desander 규모의 적정성을 평가할 수 있는 현 시점에서 경험식으로부터 도출된 결과의 신뢰성과 객관성을 검증할 필요가 있다고 판단된다. 본 연구에서는 노르웨이 NSTU에서 개발한 유사의 이송 및 확산해석 기능이 내장된 범용 소프트웨어인 SSIIM을 이용하였다. SSIIM(Simulation of Sediment movements In water Intakes with Multiblock)은 개수로 흐름 상태에서 유사 이동 및 하상 변동을 분석할 수 있도록 개발된 3-D 해석 프로그램이다. SSIIM은 수치해석 방법으로 유한체적법(Finite Volume Method)를 채택하였으며 Navier-Stokes equations을 통해 유체의 흐름을 해석한다. 입력 자료는 유입 유량($m^3/sec$), 유입 유사량(kg/sec), 유출부 수위 및 해당 Desander Structure grid 자료가 사용되며 해석 결과로 Desander 내 grid 별 유속, 수위, 유사 농도 변화 등을 제공한다. 본 연구에서는 SSIIM을 이용하여 제거 목표 유사 입경의 차집 효율(Trap efficiency)로 Desander의 적정 규모를 평가 할 수 있는 설계법을 제안하며 설계 단계에서 결정되는 최소 제거유사 입자와 차집 효율에 의한 Desander의 적정 규모 평가 분석을 파키스탄 A 프로젝트를 대상으로 수행하였다. 연구 성과로 (1)SSIIM을 통해 해석된 차집 효율을 기초로 Desander의 적정 규모를 계획할 경우 경험적 방식에 비해 설계의 객관성과 신뢰성을 제고할 수 있으며 (2)3-D 수치해석을 통해 grid 별 유사농도를 확인 할 수 있어 Desander 형상과 규모에 대한 평가가 가능하다.

  • PDF

Development of A Prototype for Wall Formwork Designs using Open BIM (개방형 BIM을 활용한 벽체 거푸집설계 프로토타입 개발)

  • Jin, Chengquan;Kim, Hyunjoo;Hyun, Chang-Taek;Han, Sang-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.3-13
    • /
    • 2018
  • The formwork cost amounts for a significant proportion of project construction costs. It costs 10-15% of the total construction cost and 30-40% of the frame structure construction cost. In addition, the formwork collapse accidents are frequently causing deaths in the construction industry, and thus, is known to be of relatively high degree of risk. As so, the accuracy of structural calculation and quantity take-off when planning the formwork in a construction project are a very important matter. Accordingly, this study develops a BIM based formwork design prototype, that enables the construction manager to optimize the design through applying the proposed new IFC entities associated with the formwork design. The approach proposed in this study is expected to support the construction manager with accurate quantity calculation and rapid planning and construction. Since this study considered specific small-scale buildings using Euro-form and show the possibility of utilizing BIM entities in the formwork design process, further research is recommended towards the limitations in applying the system to other types of formworks.