• Title/Summary/Keyword: 발주 제도개선

Search Result 128, Processing Time 0.034 seconds

A Study on the Improvement Plan through Analyzing the Perception of Expert Group about Landscape Construction Defects (조경공사 하자에 관한 전문가 집단간 인식분석을 통한 개선방안 연구)

  • Lee, Sang-Suk;Yu, Joo-Eun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.4
    • /
    • pp.104-113
    • /
    • 2012
  • This study aimed to find out the improvement plan through analyzing the perception of the expert group engaged in landscape architectural construction and to focus on analyzing the expert groups' experience on Landscape Construction Defects (LCD), defect liability, warranty period, and implementation of the defect liability. The results are as follows: 1. Regarding the experience on the LCD, landscape construction contractors were an awareness of the LCD issue at a serious level, while public-sector clients recognize moderately the LCD issue; and on the first priority in defect implementation, landscape construction contractors considered repair cost while public-sector clients value the identifying causes of defects. 2. In disagreement on the defect liability, landscape construction contractors attributed it to client's lack of responsibility for maintenance while public-sector clients ascribed it to the absence of dealing a criteria with LCD, and regarding the appropriate defect implementation, public-sector clients preferred the following objective by dealing the criteria with LCD while landscape construction contractors advocates by sharing the responsibilities for dealing with LCD based on the identified causes of construction defects. 3. Regarding the warranty period, the public-sector clients considered the 2-year warranty period as appropriate while landscape construction contractors considered it comparatively long, and concerning the commencement of defect warranty period, the public-sector clients viewed it as it should commence to cover the overall completion of the construction while landscape construction contractors perceived it to start on the completion of each work. 4. As for the improvement of the defect implementation system, public-sector clients considered it necessary to establish the objective dealing the criteria with LCD while landscape construction contractors viewed the legislation of maintenance duty. Also, with regard to the important value in establishing and dealing the criteria with LCD, public-sector clients pointed out the objective of the criteria for determining the defects per work type while landscape construction contractors suggested client (user)'s maintenance duty. Because of research, because the system in dealing with LCD is an absence of LCD management agency and dealing the criteria with LCD, it is needed to establish an LCD management agency and make the system in dealing with LCD.

The Study of Improvements for CM Delivery System by the Analysis of Current CM Regulations and Status (CM 발주제도 및 현황분석에 따른 개선방안에 관한 연구)

  • Kim, Chan-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.4
    • /
    • pp.1962-1967
    • /
    • 2011
  • Construction Management service has been consistently growing in both sales and diversified services. On the other hand the market has been solidified owing to monopoly of major companies and considerations of the services have not been sufficient so that construction management could not play a appropriate role of the construction industry. This research is to suggest the improvements of construction management delivery system based on the analysis of the current market. The method conducted was to analyze market survey, literature and statistical review, regulations, considerations and evaluation system. Through the analysis and research, the delivery system of construction management was proven rooms for improvements in regulation, consideration, and evaluation system. and this study presented those as fair as possible. It is hopefully expected that the expansion of CM market, impartial competition, and justifiable services are implemented in the construction industry.

Analysis and Improving Strategies on Construction Management(CM) Service Adoption in Public Sector Construction (공공부문 건설사업관리(CM)적용 실태 및 개선에 관한 연구)

  • Kim, Jae-Jun;Moon, Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.119-127
    • /
    • 2006
  • On December, 1996, the Ministry of Construction and Transportation published Construction Management Service in Construction Industry Basic Act. CM service has been adopted in Korean construction market for ten years by now, however there was no significant change in the construction industry from adoption of CM service. The CM service results aggregated by PCM, from 1997 to 2004, show that CM service adopted projects were 324 in total and the total contract amount was 260million US dollars. These results tell us that adoption of CM service in Korean construction industry is not successful. The research is to survey the factors and the limitations affecting on poor adoption of CM service and to propose the improving strategies on that matter. Therefore, this paper analyzes former papers, laws and regulations on CM and CM service results from PCM as well. From the analysis, we found conflicts in between the laws such as different rules on same matter or missing significant policies in their provisions. Also, problems of industrial organization was found such that the public sector seldom adopts CM service due to their embeded CM function.

A Study on Improvement through a Survey on the Condition of Construction Waste Treatment of Public Institutions (공공발주기관의 건설폐기물처리 실태조사를 통한 개선에 관한 연구)

  • Park, Jeong-Gwon;Lee, Myeong-Eun;Kim, Chang-Hak
    • Land and Housing Review
    • /
    • v.13 no.2
    • /
    • pp.141-150
    • /
    • 2022
  • The government introduced a waste disposal share system to reduce the annual increase in construction waste and to increase the recycling rate. As a result, the cost of waste treatment by public institutions is growing inevitably, causing disagreements and disputes between the public owner and the construction waste treatment company. They are also arguing for an increase in construction waste disposal costs. Therefore, in this study, an on-site survey was conducted to identify the current construction waste management problems and to find improvements. The survey was conducted for supervisors of public institutions, construction companies, and those related to waste treatment companies. The survey results were analyzed by dividing the construction waste management, regulations, treatment cost, and treatment method. The results of this study were used as primary data for changes in the construction waste guidelines and waste treatment costs of public institutions.

A Study of Process Model for Estimating Optimal Bidding Rate in the Lowest Bidding System (최저가낙찰제도의 적정 낙찰가율 산정을 위한 프로세스 모형 연구)

  • Ahn, TaeHyoun;Seo, HwaJin;Choi, GwangYeol;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.719-726
    • /
    • 2011
  • The government intensifies screening criteria for the guarantee of reasonable bidding price and the prevention of low bidding price, however, the low tender rate still becomes an issue. This study analyzed the problems of screening criteria for the guarantee of reasonable bidding price, and then derived some major issues such as the restriction of decisive factors for initial construction cost, the rate of activities over five percent of surveyed price and the restrictive review criteria of inadequate activities. To solve thess problems, this study suggests an improved process model for estimating optimal bidding rate that can select a contractor with the guarantee of reasonable bidding price.

이슈&이슈 - 제8대 집행부 사업추진 실적

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.284
    • /
    • pp.65-80
    • /
    • 2014
  • 지난 2011년 3월에 출범한 제8대 집행부는 정해돈 회장을 비롯한 회원사 모두가 한마음으로 노력한 결과 괄목할 만한 사업성과를 거두었다. 특히 설비건설업계의 오랜 숙원사업인 공공공사 분리발주 확대 법제화를 위해 각고의 노력을 기울인 끝에 국가계약법 시행령이 개정되어 올해 1월 1일부터 시행에 들어간 성과는 1994년 법 제정 이후 20년 만에 일구어낸 아주 값진 성과로 평가되고 있다. 또한 녹색건축물조성지원법 시행령에 '국토부 장관이 5년마다 기계설비 발전정책을 수립하도록 의무화'한 조문 신설로 향후 기계설비 발전계획을 정부 차원에서 수립할 수 있게 되었다. 이와 함께 건설산업 공생발전위원회를 통한 주계약자 공동도급 확대와 저가하도급 심사제도 개선 등 불공정하도급 거래 관행 개선으로 회원사의 경영환경을 크게 개선시켰다. 본지는 2011년 3월부터 2014년 2월까지 제8대 집행부의 사업실적을 점검해 본다.

  • PDF

법령과 고시 - 건설산업기본법 개정, 6월 30일부터 시행 - 부당특약금지 등 하도급자 보호규정 신설 등 협회 건의내용 반영 -

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.235
    • /
    • pp.34-37
    • /
    • 2010
  • "건설산업기본법"(법률 제9875호, 2009.12.29)이 개정 공포됨에 따라 $\triangle$하도급자의 계약상 이익을 제한하는 부당특약금지 규정 신설 $\triangle$하도급대금의 발주자 직접지급 의무대상 확대 $\triangle$지급기일 위반 시 과태료 부과규정 신설 등 하도급자의 보호규정이 새롭게 신설됐다. 대한설비건설협회는 그동안 회원사가 하도급계약 시 각종 부당특약과 불공정 하도급행위로 인해 경영상 많은 어려움을 겪음에 따라 국토해양부를 비롯한 관련부처에 부당특약과 불공정하도급행위 근절을 위한 제도개선을 지속적으로 건의한 결과 이번 건산법 개정안에 이같은 내용이 반영됐다. 이번에 개정된 건산법은 오는 6월 30일부터 적용되며, 주요 내용은 다음과 같다.

  • PDF

200호 기념특집/좌담회

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.3 s.200
    • /
    • pp.46-62
    • /
    • 2007
  • 월간「설비건설」은 지령 200호를 맞아 설비건설산업의 제2 도약을 위한 발전방안 모색과 월간「설비건설」발전을 위해 산·학·연·관에서 설비건설산업 제도개선 및 설비건설산업 발전에 일익을 담당하고 있는 인사를 모시고‘설비건설산업 제2 도약을 위한 발전방안 ’이라는 주제 하에 지난 2월 13일 라마다 르네상스 인 서울 호텔에서 좌담회를 개최했다. 이날 좌담회에서는 건설업계의 관심사인 건설생산체계 개편과 관련하여‘일반·전문 겸업제한 폐지시 설비공사 분리발주가 이루어져야 균형적인 법개정이 될 것’이라는 의견과 함께‘설비분야는 독립성이 있음에도 불구하고 인정받지 못하는 현실을 극복하기 위해 설계, 시공, 감리, 유지관리를 일관성 있게 지원 가능한 설비건설업법 제정이 필요하다’는데 의견을 모았다. 또한 월간「설비건설」의 발전방향에 대해‘창의적인 기획기사 발굴과 독자의 참여도를 더욱 높여야 할 것’이라고 지적했다. 본지는 이날 좌담회에서 논의된 내용을 정리하여 게재한다.

  • PDF

A Study on the Suitability of Unified Project Management Framework Applying for IT Services in Public Organizations (공공기관 IT 서비스 종합관리 프레임워크 도입의 적정성 연구)

  • Park, Min-Kuk;Park, Dae-Ha
    • Journal of Service Research and Studies
    • /
    • v.7 no.3
    • /
    • pp.21-36
    • /
    • 2017
  • Recently in information business, managing and auditing are getting more difficult because of enlargement, intellectualization and convergence. In addition, ordering organizations have been having a difficult time choosing a service because not only there is a huge overlap between information audit system and PMO but also the work boundaries of those two are not clear enough. As the demand that a business managing and auditing frame work need to be more developed in terms of independence, quality, economic feasibility and responsibility has been increased, the Korea Association Of Information Systems Audit has been attempting to improve business management and audit system by proposing Unified Project Management Framework whose process is approximately constructed. This study introduces Unified Project Management Framework which is all-encompassing from the ordering at the very beginning of business to the operating in the post-processing step and then verifies its work scope through a comparative analysis with existing management systems. Also, this thesis examines the necessity of unification of audit system and PMO by analysing existing similar systems. At the end, this study, analyses the suitability of Unified Project Management Framework by evaluating it with IT goal frame of COBIT5 which is constructed based on BSC performance management index. The result of the analysis is expected to help people in charge understanding the features of Unified Project Management Framework before they apply it to practical business.

A Basis Study on the Integrated System for the Evaluation and Public Announcing System of the Contractor's Construction Capacity (시공능력평가 통합시스템 기반구축에 관한 기초연구)

  • Noh, Jae-Yoon;Jun, Young-Joon;Park, Eun-Soo;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.568-571
    • /
    • 2008
  • To help a owner selecting proper contractors about the specified contract, the Evaluation and Public Announcing System of the Contractor's Construction Capacity has been introduced since 1997. But, the system has been done violence to its original meaning and purpose as time went on. When annually announcing the Contractor's Construction Capacity, especially, there was frequently a large range of opinion on the issues. On that account, MLTM(Ministry of Land, Transport and Maritime Affairs) has had to make a alteration to improve those and is making efforts for a constructive policy now. The purpose of this paper is to conduct a basis study on the Integrated System after reflecting points to be considered about improvements and the current of the times.

  • PDF