• 제목/요약/키워드: 발주

Search Result 1,353, Processing Time 0.025 seconds

A study on the Application of Operation Model for Technical Proposal-Based Tender of Large Construction Project (대형공사에 효율적인 기술제안형 입찰방식 적용에 관한 연구)

  • Cho, Sung;Cho, Yong;Paek, Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.591-596
    • /
    • 2008
  • Success or failure highly depends on delivery method in construction projects. This paper mainly focused on operation model for technical proposal in Large construction projects. This operational model uses Technical Proposal-Based Tender. This project studied order and delivery method in large construction projects. And delivery systems of international and domestic market are researched, and then condition of delivery system and problems are derived from them. Especially, it researched that it is hard to reflect special feature in large construction projects. As a result of having referenced idea as describe above, this paper will be studied by this process. First, definition of delivery method and large construction projects is researched. Second, delivery systems of international and domestic market are checked. Third, problems and condition of delivery system in large construction projects are investigated. Fourth, application of operation model for technical proposal-based tender are presented in large construction projects.

  • PDF

A Study on the Legislation for Separate Prime Contracting in the Fire Facility Business (소방시설업의 분리발주 법제화에 관한 연구)

  • Lee, Chang Woo
    • Fire Science and Engineering
    • /
    • v.27 no.6
    • /
    • pp.97-103
    • /
    • 2013
  • This study analyzes the present public construction ordering system focussing on the legal framework for the fire facilities construction business and investigates the problem of subcontracting, and further reviews why Separate Prime Contracting should be recommended in policy, social, legislative and regulative terms. This study suggests the amendment of Fire Facilities Construction Business Act, with new bill drafting. The result of this study shows the present public construction ordering system has huge disparities between main building construction business and fire facilities construction business, and recommend Separate Prime Contracting should be adopted in the fields of fire facilities construction business. The system of Separate Prime Contracting may secure business entities' responsibility and higher quality of fire facilities, and also result in reasonable construction practices in reasonable costs. This system may also contribute to improve public safety level in fire facilities construction.

Assessment of Owner Organization's Business Function for Successful Application of CM (발주자 유형별 CM 업무기능 특성 분석)

  • Kang Seung-Hee;Jung Young-Soo;Woo Sung-Kwon;Park Ji-Ho;Lee Young-Hwan;Lee Bok-Nam
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.388-393
    • /
    • 2003
  • Since the Construction Management(CM) was introduced into the Korea construction industry, the efforts for acceleration of CM adaption have been continued. The fact that an owner organization has the essential key to successful application of CM delivery method is true, but there has been no study on owner's organization. An owner should decide their organization type and measure their current needs of each CM business functions for successful application of CM. After the needs of CM business functions are measured, the owner should reinforce their required business functions through strengthening their in-house capability or outsourcing. Thus, this paper defines four kinds of owner organization type and suggest the form for evaluation of owner's CM ability and analyze about needs of each type's CM ability through making up question.

  • PDF

A Study on Optimal CM Service and Practice Considering the Characteristic of Owner (발주자의 특성을 고려한 CM업무 최적 활용에 관한 연구)

  • Kim Hae-Sun;Park Young-Ho;Paek Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.638-641
    • /
    • 2003
  • This paper suggests that construction management services should be performed considering the owner's and the project's characteristics through the examples of the successful projects. For this study, the critical CM services in each phase regarding schedule management, cost management and information management are presented and the problems of the CM delivery system in Korea are analyzed with respect to policies, users, suppliers/CMrs and construction environments. Besides, the situation of the delivery systems in Korea and the differences of each delivery system are presented. It is concluded that, for the settlement of CM delivery system in public construction market and, ultimately, the successful execution as an agent of the owner, CMr should diversify the services and give the optimum CM services appropriate for each project's characteristics.

  • PDF

공청회

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.7 s.192
    • /
    • pp.39-43
    • /
    • 2006
  • 건설산업 선진화를 위한 건설생산체계 개선 공청회가 지난 6월 30일 국토연구원 강당에서 개최되었다. 국토연구원이 주최하고 대한건설협회, 대한설비건설협회, 대한전문건설협회가 후원한 이번 공청회는 향후 건설산업기본법의 개정(안)과 건설산업관련 제도개선에 활용 방안을 도출하기 위하여 마련된 것으로 김재영 국토연구원 선임연구위원이 주제발표를, 김수삼 한양대학교 대외협력부총장이 토론회 진행을 했으며, 최기원 삼건설비(주) 대표이사를 비롯하여 손태락 건설교통부 건설경제팀장, 김명수 가톨릭대학교 경제학과 교수, 유주현 (주)신한건설 대표, 이교선 한국건설기술연구원 수석연구위원, 이상호 한국건설산업연구원 건설정책연구실장, 천길주 현대건설(주) 상무, 황한석 (주)삼중엔지니어링 대표 등이 토론자로 참석하여 열띤 토론을 벌였다. 이날 토론회에서 대한설비건설협회 측 토론자로 나선 삼건설비(주) 최기원 대표는“겸업제한 폐지 등 기존 건설산업기본법의 틀을 근본적으로 바꾸는 것보다 현행법 내에서 제도개선 방안을 강구하는 것이 바람직하나, 정부방침에 의거 겸업제한제도를 폐지할 경우 상대적으로 약자인 설비건설업계를 위한 발주제도를 개선하는 방안 강구가 필요하다”고 강조했다. 최기원 대표는 또“기계설비공사의 경우 상호 실적을 인정해서는 안될 것이며, 실적인정과 관련한 혼선을 최소화하고 문제점 발생시 보완 및 조정을 위한 한시적 조정위원회 설치”를 제안했다. 이와 함께 건설공사 발주방식의 다양성 확보에 대한 의견으로 발주할 때 일반건설업자로 제한해서는 안되며, 다양한 공종과 업종의 건설공사는 통상적으로 전문분야 또는 업종에 따라서 분리발주를 의무화해야 한다고 강조했다. 이날 공청회에서 대한설비건설협회는 플로어 발언을 통해‘설비공사 분리발주를 원칙으로 하고 분리발주가 안될 경우 설비∙전문간의 공동도급으로 원도급시장 참여를 법적으로 보장할 것과 시공관리형 CM업을 신설하여 줄 것’을 건의했다. 건설교통부는 이날 공청회에서 논의된 방안을 중심으로 의견수렴을 거쳐 오는 12월 정기국회서 건설산업기본법을 개정하고 2007년 3월 시행령 등 정비안을 마련할 계획이다. 건교부는 또한 정비안을 바탕으로 다시 업계의 의견을 듣고 내년 상반기중 시행령 및 규칙 등을 개정한 뒤 5~6개월 유예기간을 거쳐 이르면 2008년부터 생산체계 개선방안을 시행한다는 방침이다. 본지는 이날 발표된 건설생산체계 개선방안과 대한설비건설협회의 의견을 게재한다.

  • PDF

A Study on the Application of Construction Management Delivery System by Characteristics of Facility (건설사업관리 발주방식의 시설물 특성에 따른 적용방안에 관한 연구)

  • Gee, Hyoung-Kwon;Kang, Hyun-Wook;No, Jae-Deuk;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.449-454
    • /
    • 2008
  • The purpose of this study is to analyze, applications of the construction management delivery systems according to characteristics of facilities. The adapted research method is to selected four mall in the capital region and then divided them into two groups: CM for Fee or CM at Risk. After analyze each applications and administrations, it could propose proper applications of CM for fee according to CM at Risk. The results of this study are as follows: 1) the CM for Fee was suitable for the projects focused on completing on time and constructing the effective business plan of quality control, and 2) the CM at Risk was suitable for the projects concentrated on the cost reduction through shorten the construction time and the related businesses on quality control.

  • PDF

Strategy Improvement of Construction Management in the Owner's View Point (발주처의 관점에서 바라본 토목사업 CM 제도 활성화 방안)

  • Lee, Sang-Ok;Park, Jin-Hong;Jang, Won-Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.463-472
    • /
    • 2012
  • Exemplary contracts of construction management (CM) including highway projects have been carried out in the civil engineering area over the past ten years. However, practical and administrative challenges as transitional circumstances have been revealed in the different participants of supervision, inspection and construction management. Thus, it is important to internally overcome problems and negative perception encountered in civil engineering, and to promote the efficiencies in construction cost and quality. In addition, external efforts should be put to market opening, globalization, and technology development for competitiveness and high value industry. While it is critical to establish the concrete CM system by collaborating with various participants, proven architecture and system have not been provided because of incorrect measurement of CM accomplishment, overlap of responsibility between CM and supervision, and slow deployment in construction field. This paper analyzed the current CM practices and business environments, and presented the possible solutions for strategy improvement of CM in the owner's view point.

The Problem Analysis and Improvement Plans to the Bidding System of Construction Works (건설공사 입 ${\cdot}$ 낙찰제도의 문제점 및 개선방안;대한주택공사의 발주공사를 중심으로)

  • Jeong, Jin-Pal;Park, Moon-Sun;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.704-709
    • /
    • 2007
  • The purpose of this study is to present both problems and improvement plans on the bidding system of the Korea National Housing Corporation, which orders apartment houses professionally. For data gathering, this study used data from electronic procurement system from 2001 to 2005. The research method of this study is to analyze the data categorized into four types: changes of ordering and contract price ration, the lowest-pricing bidding system, and permanent projects by grades. As a result of the analysis, the amount of ordering is biased in favor of particular level. Finally, this study present following improvement plans: 1) screening system and the lowest-pricing bidding system need to be supplemented, 2) the contract price ratio and the amount of ordering should be controlled, and 3) the improvement of PQ and the introduction of the list of Qualified companies by types need to be presented.

  • PDF

A Study on the Order Status of the Cultural Properties Repair Works in Seoul (서울시 문화재 수리공사의 발주 실태에 관한 연구)

  • Cho, Han-Gu;Kang, Young-Jo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.47 no.1
    • /
    • pp.10-25
    • /
    • 2019
  • This is a study on the ordering status of the cultural property repair work in Seoul, centered on the cultural property construction orders from each local government and affiliated institutions. The scope of this study is spatially based on the city of Seoul. The time range is from October 2015 to September 2017. We can grasp the scale of the cultural asset construction by recognizing the status of the cultural asset of the city and the budget available for repairing the cultural asset. By analyzing the actual situation of the cultural property construction over two years, we were able to learn the total number of orders, the ordering period, the order size and the associated order type. By analyzing the detailed data, we could grasp the actual state of each cultural property type mixing. As a result of that, it was found that one cultural property corporation had difficulty completing construction without the involvement of other types. This suggested the better contract way to a cultural property construction. This study suggests an appropriate ordering method analyzing the tendency of construction orders of cultural properties, which can be utilized as basic data for the placement of cultural property repair technicians in the field. In particular, landscape architecture is an important aspect of the cultural property construction. Despite the need to establish the status of landscaping, there are no papers describing the actual status of contract way to a cultural property construction and the status of the landscape architecture associated with them. This paper empirically reveals the facts for Seoul, and then makes a proposal to establish a complete analysis of the landscape construction business. Specifically, landscape architecture is in a position to take responsibility for the landscape of cultural asset. It is possible to propose the establishment of the status of landscape architecture and to contribute to the securing of business areas that are part of repairing cultural properties.

Cost Performance Comparison of Project Delivery Methods in Public Sector - Focusing on Mediator Effect of Biddropping on Change Orders - (공공건설공사 발주방식에 따른 비용성과 실증비교 - 설계변경에 대한 낙찰률 매개효과를 중심으로 -)

  • Moon, Hyosoo;Lee, Hyun-Soo;Park, Moonseo;Lee, Bogyeong;Joo, Seonu;Son, Bosik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.86-96
    • /
    • 2015
  • According to previous research, the reason why Design-Build(hereinafter "DB") outperforms Design-Bid-Build(hereinafter "DBB") in terms of cost is due to less change orders(hereinafter "COs"). However, if biddropping was low for DBB resulting into increasing COs, then it would be wrong to conclude that DB is superior due to less COs. Therefore, in order to confirm such misjudgment, the attempt to comprehensively analyze biddropping, COs and delivery method was made as previous methods had analyzed either the relationship between delivery method and COs, or biddropping and COs. This research uses path analysis, which simultaneously compares effect sizes on COs according to delivery method and biddropping based on the project type, and validated the mediator effect. The research proved that DB outperforms DBB due to less COs cannot be validated as biddropping caused a mediator effect by intervening between the delivery method and COs for specific project types. Therefore, the mechanism of delivery method acts on COs through biddropping was established. Also, the identity of biddropping was investigated in a different perspective from previous research. Based on this result, this research is expected to help determine a delivery method by considering the mediator effect of specific projects and evaluate performance.