• Title/Summary/Keyword: 발주자 특성 분석

Search Result 58, Processing Time 0.026 seconds

Strategy for Various CM Applications based on Comparative Case Analysis (사례 비교분석을 통한 CM 적용 다양화 방안 - 발주자 특성 및 사업특성을 중심으로 -)

  • Kim, Namjoon;Jung, Youngsoo;Kang, Seunghee;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.10-17
    • /
    • 2016
  • Domestic CM market has continued to grow since the enactment of CM policies in 1996. In addition, future CM market is forecasted to have potential high growth. Therefore, it is necessary to apply various CM business models reflecting the owner's requirements and characteristics in order to improve in the CM industry and to strengthen the competitiveness in the overseas construction market. In this context, the purpose of this study is to suggest strategies of various CM applications based on comparison of 4 cases analyzed by 'business weight' and 'business depth' in terms of business function as well as by the types of 'CM market' and 'CM practice'. Result of this comparative analysis shows that each case presents differences in terms of type, business weight, and business depth of CM practice. However, domestic public CM services are currently being challenged to strengthen capability throughout the project life-cycle against the limitation of government's CM policies focused on the construction supervision. In order to address this problem, this study proposes the strategies of various CM applciations from several different perspectives

The Trend of CM at Risk in the U.S Construction Market (미국 CM at Risk 시장 동향 및 시사점)

  • Chang, Chul-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.67-73
    • /
    • 2006
  • Alternative project delivery methods including design-build and CM at Risk have evolved as a means of meeting owner's diverse needs and implementing project efficiently with limited budget and time in more competitive construction environment. It is time to consider adopting alternative project delivery methods, especially CM at Risk, for domestic construction industry to enhance competitiveness and to provide various options for owners so that they can select more appropriate project delivery methods for the facility being planned. This research report derives suggestions from investigating how CM at Risk has been evolved in the US construction market. Besides the analysis of CM at Risk market in the US construction industry, the characteristics of companies whose market share are in Top 100, the type of facility usually built by this method were investigated. Based on the analysis of CM at Risk in the US, the prepositions in adopting CM at Risk to domestic construction industry and the possibility of adopting this method have been identified.

  • PDF

Study on Acceptance Factors of Information Technology in Construction Industries according to Individual's Features (건설분야에서 개인 특성에 따른 Information Technology 수용 요인에 관한 연구)

  • Park, Eun Soo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.18 no.4
    • /
    • pp.171-181
    • /
    • 2013
  • In the recent information-oriented age, various information technologies (ITs) have been introduced in construction industries. However, since construction ITs tend to be employed by the demand of the government or owners rather than the demand of information accepters (users), this tendency inhibits the spread of user-friendly construction ITs. In order to find these inhibitive factors, this research conducted practical studies, based on Davis' technology acceptance model, for construction ITs' acceptance according to the information accepters' (users) features. This study was hypothesized whether or not each inner and outer factors with respect to construction ITs are influential to the information accepters (users). As a result of this study, the primary factors which can maximize the usefulness and ease of use and should be considered when developing new information technologies were suggested.

The Improvement Plan of Project Management for Highway Construction Supervisor using Construction Management Benchmarking of Developed Countries (선진국의 공사관리 벤치마킹을 통한 도로건설공사 감독자의 공사관리 향상방안)

  • Lee, Min-Woo;Shin, Eun-Young;Lee, Kyo-Sun;Park, Hwan-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.138-148
    • /
    • 2006
  • The construction supervisors of the public companies are usually responsible for process management, quality management, safety management, and many other various tasks that occur during construction project. Public companies such as Korea Highway Corporation have developed a framework and manual for management and supervision of construction projects. But, there has been the change of business environment such as increase of private investment project and the introduce of construction management system recently. It has been necessary for construction supervisor to streamline the current project management system in the owner's aspect in order to cope with the expected new challenges. Accordingly, this research has been investigated and analyzed the operation system between Korean supervisor and foreign supervisor in their public corporation. This research has suggested the advanced project management in their public corporation. Especially, this study has proposed the construction management manual for supervisors such as inspectors training, supervisors construction manual, and supervisors training road map.

Risk-Based Performance Evaluation and Prediction Tool by Characterizing Construction Projects in Pre-Project Planning (초기 단계 프로젝트 특성을 고려한 리스크 평가 및 예측 툴 개발)

  • Shin, Kang-Yong;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.168-175
    • /
    • 2008
  • Project risk factors are major triggers in cost performance in construction projects. Both owners and contractors are highly concerned in managing their risks in earlier times. As such, it is needed to provide a robust risk evaluation methodology in identifying and assessing the potential risks before project execution. In previous research, risk identification was conducted only in specific phases, i. e., design, procurement, construction. Therefore, the comprehensive approach in risk management was limited and their quantifying method was not well-defined. Since the benefit of planning in earlier times are maximized compared to later times, the risk management should be implemented in earlier planning stage. This study provide a new risk evaluation method by incorporating previous research and extensive literature review. By quantifying each risk factor from an extensive industry survey, the proposed tool can enhance the reliability of each factor weight and also the weights are categorized from a various perspectives, i.e., owners, contractors, lager-scale company, smaller-scale company, building projects. The proposed tool can be also useful in deciding on whether to proceed a particular project and How much the project contingency would be set aside in project execution. The study findings can also expedite the risk management procedure in a more systematic approach.

A Selection Model of Suitable Tendering System for Public Construction Projects (공공건설공사의 최적 입찰방식 선정모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.164-174
    • /
    • 2008
  • It is crucial In decision making to select a project delivery system (PDS) adjusted accordingly to the project characteristics. Furthermore, selecting a tendering system is the kernel in the process of selecting PDS. In October 2007, the Ministry of Finance and the Economy of Korea launched two new project delivery systems, "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" by revising enforcement ordinances of "Act on Contracts to Which the State is a Party" to provoke the tendering systems. In order to support the proposed purpose, this research developed a selection model for suitable tendering system, which helps a public owner select a tendering system appropriate to the project characteristics. First, the framework of the model was set throughout analyzing previous researches and interviewing relevant experts. Additionally, by analyzing the survey result from 265 experts engaged in architectural and civil engineering business, the relative weights of the selection factors and the effectiveness values of the alternatives were suggested as the quantitative evaluation references. Finally, the practical guideline was suggested to apply this model to three public projects scheduled to be delivered. The result of applying the model to three case projects showed that further researches were needed to make the selection process logical and to suggest the standard weights and effectiveness values according to project type.

A Study on the Conceptual Design of Integrated Management System for Public SW Project Information (공공 소프트웨어(SW) 사업정보 통합 관리체계의 개념적 설계에 관한 연구)

  • Shin, Kitae;Park, Chankwon
    • The Journal of Society for e-Business Studies
    • /
    • v.24 no.2
    • /
    • pp.199-216
    • /
    • 2019
  • The public SW market is 3 trillion won, which is less than 10% of the total SW market. However, due to the nature of the domestic market, it is an important market with a relatively large impact on small and medium-sized software companies. In this market, government is operating the Public SW Project Demand Forecasting System in order to support the marketing activities of small and medium sized SW companies and establish a fair market order. The current system has limitations such as lack of user convenience, insufficient analysis capability and less business connection. This study was conducted to identify the problems of these systems and to propose a new system for improving the convenience of users and expanding the information utilization of SMEs. To this end, we analyzed the requirements of each stakeholder. We proposed the 2-phased forecasting cycle, the management cycle, and the system life cycle of public SW projects and created a unified identifier (UID) so that the information of those projects can be identified and linked among them. As a result, an integrated reference model of project information management based on system life cycle was developed, which can explain the demand forecasting and project information, and the improved processes was also designed to implement them. Through the result of this study, it is expected that integrated management of public SW projects will be possible.

Preliminary Analysis of the Bid Success Ratio according to the Characteristics of Overseas Construction Projects (해외건설 프로젝트 특성에 따른 입찰 성공률 분석에 관한 기초연구)

  • Kim, Seung-Won;Lee, Kang-Wook;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.122-133
    • /
    • 2019
  • In the construction industry, bidding competitiveness is the most basic and important competence of the company. Bidding competitiveness comes from competitive advantage, but the strategy of the company to capture bidding competitiveness varies with the characteristics of the project. In particular, overseas construction is where uniqueness of the construction industry and the specificity of international business coexist. This study analyzes the bidding success ratio and the level of bidding difficulty by project characteristics with 12,952 overseas construction bidding cases. Consequently, it was found that the bidding success ratio of Middle East and North Africa (MENA) and civil engineering was the lowest in each group of project characteristics, and therefore the level of bidding difficulty is high, respectively. In addition, it was confirmed that the bidding success ratio of small size or short duration project was relatively high, and the bidding success ratio of both the negotiated bidding in the bidding method group and the private sector in the client type group was respectively high. However, Kruskal-Wallis test in contract type and period shows that there is no statistically significant difference in the bidding success ratio by group.

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).

A Study on Bridge Construction Risk Analysis for Third-Party Damage (교량공사 제3자 피해 손실에 의한 리스크 분석 연구)

  • Ahn, Sung-Jin;Nam, Kyung-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.2
    • /
    • pp.137-145
    • /
    • 2020
  • The recent bridge construction projects demand thorough and systematic safety and risk management, due to the increase of risk factors following the introduction of new and complex construction methods and technologies. Among many types of damages that can occur in bridge construction projects, the damages to third parties who are not directly related to the existing property of the contractor construction project can also bring about critical loss in the project in order to compensate the damages. Therefore, risks that could be caused by the loss occurred to indemnify the third party damages should be clearly analyzed, although there are not subsequent amount of studies focusing on the issue. Based on the past record of insurance payment from domestic insurance companies for bridge construction projects, this study aimed to analyze the risk factors of bridge construction for loss caused to compensate the third-party damages happened in actual bridge construction projects and to develop a quantified and numerical predictive loss model. In order to develop the model, the loss ratio was selected as the dependent variable; and among many analyzed independent variables, the superstructure, foundation, flood, and ranking of contractors were the four significant risk factor variables that affect the loss ratio. The results produced can be used as an essential guidance for balanced risk assessment, supplementing the existing analysis on material losses in bridge construction projects by taking into account the third-party damage and losses.