• Title/Summary/Keyword: 발주자 참여

Search Result 92, Processing Time 0.031 seconds

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

Research on the Establishment of Contractor Centered Safety Management System to Reduce Construction Disaster (건설재해 저감을 위한 발주자 중심의 안전관리체계 구축에 관한 연구)

  • Kia, Seongho;Park, Namkwun
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.4
    • /
    • pp.503-510
    • /
    • 2014
  • Large scale construction disasters such as recent Noryangjin flooding incident and Banghwadaegyo collapse accident are occurring persistently. Thereupon, the role and responsibility of the various construction participants are considered as major element to reduce disaster at the construction site. Construction industry is a process of building construction object by going through planning, designing, constructing, and maintenance controlling in which various bodies of act, from contractor to designer and builders, participate. However, the subject of current safety supervision is focused on the builder, the contract enterprise which directly employs workers, while the safety activity participation of the contractor, who exerts decision-making authority at the highest level, is excluded. Therefore, this study understands the level of awareness and reality on the safety activity of each construction participants from which the improvement plan on the contractor centered safety management system is proposed.

Owner-driven Lean Construction based on Participants' Needs Analysis (건설주체간의 니즈분석을 통한 발주자 참여형 린 건설 연구)

  • Lee, Kang-Woo;Ryu, Chung-Gyu;Park, Hee-Dae;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.222-226
    • /
    • 2008
  • The construction industry has remained stagnant for a long time. So many researchers have wanted to solve this problem not only focusing on enhancement of construction process, but also introducing the culture of cooperation. The Last Planner System(LPS), one of the elementary techniques of Lean Construction, aims for improving the work reliability and reducing variability by measuring and managing the daily or weekly performance for overcoming the weakness of recent complex schedule management tools such as Critical Path Method. This research propose a framework for implementation of LPS conducted by owner focused on construction stage and introduce optimal owner participation model in plant construction, based on needs analysis for construction participants. Furthermore, this research introduce a modified needs analysis, so called IPBA(Importance-Performance-Betterment Analysis), and an advanced LPS procedure which add the needs analysis during pre-LPS and(or) main LPS stages.

  • PDF

Survey of Client/Owner Construction Safety Management (발주자 안전관리 실태조사 연구)

  • Moon, Jang-Ok;Ahn, Hong-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.53-57
    • /
    • 2006
  • 안전관리는 건설사업의 시공과정 중에 발생 가능한 유해, 위험으로부터 인명을 보호하는 것이며, 건설사업의 주제는 발주자로서 발주자 역할의 극대화는 효과적인 건설재해 방지의 관건이다. 건설프로젝트의 발주자, 설계자, 감리자, 시공자, 협력업자 등 다수 참여자의 장기간에 걸친 공동작업으로 이루어지는 건설공사의 특성을 고려할 때, 기존의 건설안전관리체제로는 건설공사에 수반되는 이와 다양한 유형의 사고를 방지하기 위한 근본적인 처방으로는 미흡하며, 건설산업의 총체적인 안전수준의 향상을 통한 시설품의 생애주기 전반에 걸쳐 안전성을 확보할 수 있는 근원적인 안전관리제도의 구축이 요구되고 있다. 실태조사 결과 공공발주자와 민간발주자의 안전의식 및 안전관리실태에는 격차가 크며, 대다수 발주자의 안전관리에 대한 책임의식이 미흡하며, 민간발주자의 경우가 훨씬 열악한 것으로 나타났다. 정부 감독기관의 발주자에 대한 안전책임 부여도 소극적이다. 발주자 안전관리가 미흡한 원인과 이의 촉진 방안에 대한 도출이 필요하다. 발주자에 대한 접근 방법의 홍보를 통한 책임의식의 고취, 발주자를 위한 안전관리매뉴얼 등 안전관리 도구의 제공, 법령을 동한 명확한 책임의 부여, 발주자가 책임을 이행할 수 있는 자질있는 안전전문가의 활용이 긴요한 것으로 사료된다.

  • PDF

Application of BIM Elements for Owner's Decision - Making Support (발주자 참여 확대를 위한 BIM 적용요소에 관한 연구)

  • Lee, Kyung-Ha;Park, Jae-Hyun;Cho, Sung;Cho, Yong;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.185-188
    • /
    • 2009
  • Recently clients requirements and social requirements are complex and large sized in construction projects. Futhermore, processes and steps are more complexed than before. Unsuitable reflection of clients brings mistaken opinions. A phase of middle change makes delay and change. It brings problems of waste expense and time. 80, first stage of planning and schematic design processes have to reflect of clients opinion actively. by increasing of constructions project competitiveness. Recently, BIM(Building Information Modeling is being researched frequently. Through visualization of information proceed step by step and it helps cognition of adapting information. 80, this paper finds and suggests solution of reflecting clients opinion and requirements and non professional clients and positively support of client participation watching based on BIM.

  • PDF

A Study on The Effect of Owner's Project Performance through Scope Management in the Information System Development Project (정보시스템 개발 프로젝트에서의 범위관리 활동이 발주자의 프로젝트 성과에 미치는 영향에 관한 연구)

  • Lim, Gyu-Gun;Lee, Chang-Ho;Kim, Jeong-Lae
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2008.11a
    • /
    • pp.375-378
    • /
    • 2008
  • 본 연구에서는 발주자 입장에서 PMI(Project Management Institute)에서 정의하고 있는 프로젝트 범위관리 활동을 범위의 기획 및 정의, 범위의 검증, 범위의 통제 3가지로 구분하고, 프로젝트의 성과를 프로젝트 과정에 대한 성과와 제품에 대한 성과 2가지로 구분하여, 각각의 범위관리 활동들이 각각의 프로젝트 성과에 어떠한 영향을 미치고 있는지에 대한 실증연구를 진행 하였다. 이와 동시에 프로젝트의 규모, 공급자 유형, 경험여부와 같은 프로젝트 특성이 범위관리 활동과 프로젝트 성과 사이의 관계에 어떠한 영향을 미치는지에 대한 연구도 병행하였다. 본 연구의 의의는 발주자 입장에서 범위관리 각각의 활동이 정보시스템 개발 프로젝트의 성과에 어떠한 영향을 미치는지에 대해 실증 연구를 함으로서 정보시스템 개발 프로젝트의 발주자들로 하여금 프로젝트에 있어 범위관리의 각각의 활동들에 대한 중요도를 인식시켜 프로젝트 범위관리 활동에 대한 적극적인 참여와 관심을 고취시키는데 그 의의가 있다.

  • PDF

A Study of the Identify about Scheduling Process at Owner's Position (IDEF 방법론을 이용한 발주자 공정관리 프로세스 규명에 관한 연구)

  • Lee Tai Sik;Kim Young Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.454-457
    • /
    • 2001
  • All of the partner must manage continually scheduling for the successful project in construction. Besides, that is not a important only contracter's managing but also owner's managing which is a very important about project finishing in time. Especially, in the case of mega project, the owner has to manage progress of scheduling to control contractor. And the case of progress to delay or to change, owner, contractor, and inspector must make a plan of recovery scheduling. This study proposes a construction process model from IDEF Methodology.

  • PDF

Development of Team Work Effectiveness Factors in Construction Field (건설 분야에서 팀워크의 효율성 요인 도출)

  • Kim, Ha-Jung;Lee, Young-Dai;Jang, Byung-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.469-472
    • /
    • 2007
  • 분쟁은 팀이 형성될 때 일어난다. 그것은 일반적으로 건설현장에서 다양한 형태로 일어난다. 따라서 건설현장의 일반적인 분쟁의 원인은 긍정적이거나 부정적인 특징들을 포함하고 있다. 그러나 과도한 분쟁은 팀의 작업에 있어서 큰 장애가 된다. 따라서 함께 일하는 문화를 증대시키는 것이 필요로 한다. 이 논문의 목적은 프로젝트 팀워크 효율요인을 규명하고 이러한 요인들 사이의 중요한 관계를 밝혀내는 것이다. 설문조사는 전문가들로부터 자료를 수집하여 사용되었다. 요인분석은 21개의 팀워크 요소로 분류하였고, 주요 3개 건설부분 즉, 시공자, 설계자, 발주자에 종사하는 169개의 응답에 의해 평가되었다. 요인분석은 그 아래 3그룹 즉 팀워크 문화구축, 참여자간 유대관계 구축, 신뢰 형성으로 분류할 수 있다. 이 논문의 결과는 건설사업의 프로젝트 참여자들 사이에서 유대관계를 증진시키기 위한 도구로 사용될 수 있다.

  • PDF

Framework of Owner-driven Lean Construction for Plant Construction (발주자 주도형 린 건설에 대한 기초 연구;플랜트 건설공사를 중심으로)

  • Ryu, Chung-Kyu;Han, Seung-Heon;Park, Jung-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.647-651
    • /
    • 2007
  • The Lean Construction is adopted from Lean Principle of Manufacturing Industry in the early of 1990, that has been providing theoretical background and good practical implementation for maximizing customers' satisfaction and improving productivity through minimizing the waste factors in the construction operations. The Last Planner System(LPS), one of the elementary techniques of Lean Construction, aims for improving the work reliability and reducing variability by measuring and managing the daily or weekly performance for overcoming the weakness of recent complex schedule management tools such as Critical Path Method. This research is propose a framework for implementation of LPS conducted by owner in plant construction.

  • PDF

A Case Study on the Demolition of Power Plant with Blasting Method for the First Time in Korea (국내 최초 발파공법 적용 발전소 해체 사례)

  • Oh, Ki-Taek
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.87-88
    • /
    • 2023
  • 서해안 최고의 동백정해수욕장과 마량리 동백나무숲은 1970년대 오일쇼크 이후 에너지 자립을 위해 발전소를 건설하면서 사라졌다. 그 당시 준공된 화력발전소는 전력공급 이라는 소임을 완수하고 2021년 부터 동백정의 아름다운 옛 모습 그대로 지역주민에게 돌려 주기위한 친환경 사업으로 발전소 철거공사를 시작, 동백정 복원공사를 추진 하기로 했다. 고층 및 중량물의 건축물 및 구조물을 안전하게 해체하기 위해서는 국내 최초 발전소 철골구조물에 대한 발파·전도공법을 채택 하였다. 철거작업은 고위험 공종으로 참여 주체인 발주자, 설계자, 감리자, 시공자 및 근로자 전 계층의 참여로 사전 위험성평가를 통해 근원의 위험요인 발굴 및 안전대책 수립, 수립된 안전대책 100% 이행을 통해 무재해 준공 달성 하기를 기대한다.

  • PDF