• Title/Summary/Keyword: 바닥거푸집

Search Result 30, Processing Time 0.02 seconds

A Support Model of Optimum Layout Planning of Forms for Improving Constructability of Formwork (거푸집공사 시공성 향상을 위한 거푸집 배치 효율화 지원 모델 - 구조부재 조정을 중심으로 -)

  • Lee, Dongmin;Lim, Hyunsu;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.212-213
    • /
    • 2013
  • The constructability of Formwork has a importantly influence on the duration and cost in a construction project. However, the existing studies on the formwork are mainly focused on a method of construction. Although a layout planning of forms, especially, is an important factors affecting the constructability and cost, it is done by engineers empirically and intuitionally after completion of structure design. Therefore this study suggest a decision support model for optimal formwork layout model based on the rearrangement of structural members by using Genetic Algorithm to improve constructability of formwork.

  • PDF

Performance Elements for Schedule Compression in Slab Form Work for High-rise Buildings (초고층 바닥거푸집 공사 공기단축을 위한 현장 요구 성능도출)

  • Lim, Hyun-Su;Kim, Tae-Hoon;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.167-170
    • /
    • 2010
  • In tall building construction, It is important to reduce construction duration of slab form work. Therefore, the purpose of this study is to assess the required performance for reduction of construction duration in slab form work of tall buildings. We surveyed the required performance and their degrees of importance and economical efficiency through the interview and questionnaire survey by related experts. This study proposes the guideline to develop improved formwork system for reduction of construction duration.

  • PDF

The Process for Development of the Optimum Layout Model in Slab Formwork of High-rise Building Construction (초고층 건축공사의 바닥거푸집 최적배치 모델 구축 프로세스 연구)

  • Cha, Minsoo;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.171-172
    • /
    • 2011
  • Formwork accounts for a large proportion of the framework in high-rise construction projects in terms of the duration and cost. Especially, slab formwork has a significant influence on these factors. However, the current selection of formwork method in general contractors depends on the decisions of few experienced engineers, and layout planning of the formwork in specialty contractors requires lots of time by different floor types. As a preliminary study for developing an optimum layout model in slab formwork of high-rise building construction, this study proposes the process of the optimum layout model and determines a fitness function for use of the genetic algorithm aimed at table formwork.

  • PDF

An Improvement of Concurrent Placement of Footing and Slab Concrete (기초 및 바닥층 동시타설 공사의 개선방안 연구)

  • Lee, Dong-Hoon;Choi, Jae-Hwi;Kill, Jong-Il;Seo, Deok-Seok;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.121-129
    • /
    • 2009
  • The construction sites of small and medium buildings have small scale groundwork and the depth of excavation is often shallow. In this case, if the groundwork, girders, and ground slabs are built simultaneously by embedded assisting form rather than the existing conventional method to place concrete twice using the general form, we can expect to reduce the frame duration of the basement, resulting in cost savings. The existing embedded assisting form is restricted from use because there are cost problems with materials, labor costs,and with quality depending on the form's type. Therefore, this study is to provide an improved suggestion of building the groundwork, girders, and ground slabs simultaneously with Polystyrene by using the embedded assisting form. It also will compare the technique with existing methods of construction, and will verify its usefulness by evaluating each method of construction.

Experimental Study for the Bending Behavior of Precast Concrete Panel and Composite Deck for Railway Bridge (철도교 바닥판용 프리캐스트 패널과 합성 바닥판의 휨거동에 대한 실험적 연구)

  • Seol, Dae-Ho;Lee, Kyoung-Chan;Youn, Seok-Goo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.21-31
    • /
    • 2018
  • This paper presents an experimental investigation on the structural performance of precast ribbed panel specimens and bridge deck specimens fabricated from the panels. The panel specimens are developed for permanent deck forms of railway bridges (PSC girder). The decks of railway bridges have short lengths compared with highway bridges. Therefore, precast panels for railway bridges are different from those of highway bridges. The precast panels have ribs designed for crack control at the bottom of the sections. Two kinds of specimens were examined: one with 400-mm width and one with 1200-mm width. Three specimens of each type were fabricated, and a total of 12 specimens were tested. In this test, the ultimate load, strain of the reinforcement and concrete, crack width, deformation, and slip were measured. The structural performance of the specimens was assessed using the Korea railway bridge design code and Eurocode. All specimens met the current design criteria for structural strength and serviceability.

Development and Implementation of a Low-noise and Safe Dismantling Method for Full-Span Aluminum Slab Formwork Supported by Filler Supports (필러겸용 스포터로 지지되는 전구간 알루미늄 슬래브 거푸집의 저소음 안전낙하 공법개발 및 적용연구)

  • Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.2
    • /
    • pp.261-271
    • /
    • 2024
  • The widespread adoption of aluminum slab formwork in modern construction, evident in both domestic and international projects, offers numerous advantages. However, a critical challenge persists regarding the dismantling process for these slabs. The current industry standard involves dropping the slabs to the ground floor upon removal. This practice raises several concerns, notably the generation of significant noise pollution that disrupts nearby communities. More importantly, the risk of worker injuries due to falls from height during the dismantling process is a serious safety hazard. Additionally, the impact from dropping the slabs can damage the aluminum itself, leading to increased replacement costs. These drawbacks necessitate the exploration of alternative dismantling techniques that prioritize worker safety, material sustainability, and overall process efficiency. Accordingly, in this study, when the entire first-generation slab formwork of an apartment house is simultaneously lowered to a reachable position for workers, it is then disassembled and lifted for transport to the next floor. This approach has the potential to demonstrate improvements in safety, quality, economy, and process efficiency.

Analytical Modelling of Construction Structure Controlling Camber of Long-width Exterior Precast Panel (장폭 외측 프리캐스트 패널 캠버 조정을 위한 가설구조의 해석모델)

  • Won, Tae-Gun;Won, Dae-Yon;Kim, In-Soon;Lim, Yun-Mook
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.293-296
    • /
    • 2010
  • 일반 교량에 주로 사용되는 콘크리트 바닥판 시공을 위해서는 동바리, 거푸집 등을 설치하고 철근 배근 후 콘크리트를 타설하는 방법이 사용되어왔다. 그러나 기존 콘크리트 바닥판 시공은 계절 및 기후의 영향을 많이 받는다. 또한 시공과정에서 많은 인력이 요구되고 시공 안전성 확보를 위한 노력이 필요한 실정이다. 이러한 문제점을 극복하기 위하여 최근에 프리캐스트 바닥판을 이용한 교량 시공이 늘어나고 있는 추세이다. 프리캐스트 바닥판은 공장에서 선제작한 후 현장에서 조립하여 시공한다. 따라서 프리캐스트 바닥판 시공은 계절 및 기후의 영향을 최소화 하여 공기를 단축할 수 있고, 공장제작에 따른 양호한 품질도 보장된다. 또한 인력이 적게 요구되면서 시공 안전성도 확보할 수 있다. 그러나 이러한 기존의 프리캐스트 바닥판은 패널의 폭이 좁고 외측 캔틸레버부의 시공 시 별도의 지보공이 필요한 단점을 갖고 있었다. 이러한 단점을 보완하기 위해 장폭 외측 프리캐스트 바닥판이 제안되었다. 장폭 외측 프리캐스트 바닥판은 패널의 폭을 늘려서 장폭의 바닥판을 만들고, 가설구조물을 이용하여 지보공 없이 시공이 가능하게 고안되었다. 본 연구에서는 장폭 외측 프리캐스트 패널 캠버 조정에 사용 될 가설구조의 현장적용을 위하여, 실험 후 유한요소해석을 수행하여 비교 및 검증하였다.

  • PDF

The Productivity Analysis by Slab Formwork of Structural Frame Work in Tall Building Construction (초고층 골조공사의 바닥 거푸집별 생산성 분석;기준층 3일 공정을 중심으로)

  • Kim, Tae-Hoon;Shin, Yoon-Seok;Cho, Seong-Soo;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.11a
    • /
    • pp.115-118
    • /
    • 2007
  • A tall building construction is needed to reduce the construction duration for project profitability. Reducing the cycle time of typical floor in the structural frame work which have the largest duration in the whole construction, greatly affects construction duration. Nowadays, some projects are accomplished in the 3 day cycle. In order to accomplish efficiently 3 day cycle, productivity information of similar projects is supported. Therefore, this study proposed labor productivity and application by slab formwork to construct by the 3 day cycle. In order to perform an analysis, we selected 3 cases and analyzed the labor productivity on the basis of the amount of slab forms, labors, and durations. Then, we performed the questionnaire to analyze the application by formwork of tall building construction engineers. This study will contribute to establish a reasonable scheduling in structural frame work of a new similar project.

  • PDF

Finite Element Analysis for Bending Behavior of Composite Beam with Perfobond FRP Used as a Permanent Formwork (퍼포본드 FRP를 영구거푸집으로 활용한 합성보의 휨거동에 관한 유한요소해석 연구)

  • Kook, Moo-Sung;Yoo, Seung-Woon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.7
    • /
    • pp.3280-3286
    • /
    • 2011
  • In recent years, many efforts have steadily been allocated to develop a new deck system in terms of its materials and structures in order to make up for the shortcomings of reinforced concrete deck. This study implemented and analyzed the verification for concrete composite beam with perfobond FRP as a permanent formwork and the tensile reinforcement, using non-linear finite element analysis program. Approximately 8-15% difference of ultimate failure load between numerical and experimental results were found and showed a similar figure of strain distribution in failure state.

An Experimental Study of Bond Stress between Concrete and Various Kinds of FRP Plank used as a Permanent Formwork (영구거푸집으로 활용한 FRP 판의 종류에 따른 콘크리트와의 부착응력에 관한 실험적 연구)

  • Park, Chan-Young;Yoo, Seung-Woon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.3
    • /
    • pp.92-103
    • /
    • 2015
  • Development of new concrete bridge deck system with FRP plank using as a permanent formwork and the main tensile reinforcement recently has been actively conducted. Concurrent use as a reinforcing material and a permanent formwork, it is possible to reduce the construction time and construction costs than the usual concrete slab. In this study, an experiment was carried out for the bond stress between cast-in-place concrete and the type of FRP plank using as a permanent formwork. The interfacial fracture energy that can be one of the most important parameters were evaluated for adhesion performance and bond stress to know the characteristics of the failure mechanism of the adhesion surface. Interfacial fracture energy of normal concrete is 0.24kN/m of GF11 case, in the case of GF21, 0.43kN/m appears, in the case of CF11 and GF31, 0.44kN/m and 0.46kN/m respectively it appeared. In case of RFCON, 0.52kN/m appears from GF12, the CF12 and GF22, 0.51kN/m and 0.36kN/m appeared each case.