• Title/Summary/Keyword: 물량산출표

Search Result 4, Processing Time 0.023 seconds

Development of BIM based LID Facilities Supply Auto-checking Module (BIM 기반 LID 시설 물량 자동 검토 모듈 개발)

  • Choi, Junwoo;Jung, Jongsuk;Lim, Seokhwa;Choi, Joungjoo;Kim, Shin;Hyun, Kyounghak
    • Journal of Environmental Impact Assessment
    • /
    • v.26 no.3
    • /
    • pp.195-206
    • /
    • 2017
  • Recently, Discussion about BIM based LID (Low Impact Development) facilities management system is activated because interest of LID technique for urban water cycle restoration is increasing. For this reason, this paper developed the auto-checking module of the BIM (Building Information Model) based supply output table. This module will be the foundation of the BIM based LID facilities total management system. The research order is composed like next follows: (1) Select target area, (2) Make BIM model of LID facilities and extract supply output table, (3) Develop comparison module, (4) Analysis results. As a result, the authors made 27 LID facilities and developed the supply output table comparison automation module. So, the authors could find differences of 2D design documents based supply output table and BIm based supply output table. So, the authors made an improvement suggestion of the design plan and could construct foundation of the BIM based LID facilities total management system.

A Planning Framework of BIM-based Work-Type Packaging for Educational Facility Maintenance (교육시설 유지관리 BIM 기반 공종 패키지 플래닝 프레임워크)

  • Bae, Chang-Joon;Park, Sang-Hun;Yoon, Sun-Jae;Lee, Mi-Young;Koo, Kyo-jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.200-210
    • /
    • 2020
  • The maintenance of educational facilities was assembled in 12 project classifications of the Educational Improvement Program. The priorities were decided by the evaluation scores derived from the condition investigation, and maintenance works were budgeted in the order of priorities. These priorities were a schedule for conducting maintenance and an important criterion for obtaining a construction order. Several restrictions in the condition investigation exist, which derives budgets and conducts maintenance separately based on the priorities. An educational facility manager has a restriction in quantity take-off, which results in an incorrect budget. Discomfort would occur in an educational environment, and a period of infringing safety would increase. This study proposes applying a BIM in the condition investigation and the planning framework for work-type packaging. A BIM supports a budget calculation and derives evaluation scores by linking a repair and an inspection result. The work-type packaging algorithm divides a budget allocation range and derives the result of a grouped work-types applied in an equivalent space and element. As a result of applying cases, it could shorten the duration by approximately 37.4%. Its usability in selecting a grouped work-type was evaluated through an assessment with workers.

Environmental Assessment and Decision of Remediation Scope for Arsenic Contaminated Farmland Soils and River Deposits Around Goro Abandoned Mine, Korea (토양 정밀 조사에 의한 고로폐광산 주변 비소오염 토양 및 하천퇴적토의 오염도 평가 및 오염 토양 복원 규모 설정)

  • 차종철;이정산;이민희
    • Economic and Environmental Geology
    • /
    • v.36 no.6
    • /
    • pp.457-467
    • /
    • 2003
  • Soil Precise Investigation(SPI) for river deposits and farmland soils around Goro abandoned Zn-mine, Korea was performed to assess the pollution level of heavy metals(As. Pb, Cd, Cu) and to estimate the remediation volume for contaminated soils. Total investigation area was about 950000 $m^2$, which was divided into each section of 1500 $m^2$ corresponding to one sampling site and 545 samples for surface soil(0-10cm in depth) and 192 samples for deep soil(10-30cm in depth) from the investigation area were collected for analysis. Concentrations of Cu, Cd, Pb at all sample sites were shown to be lower than Soil Pollution Warning Limit(SPWL). For arsenic concentration, in surface soils, 20.5% of sample sites(104 sites) were over SPWL(6mg/kg) and 6.7%(34 sites) were over Soil Pollution Counterplan Limit(SPCL: 15mg/kg) suggesting that surface soils were broadly contaminated by As. For deep soils, 10.4% of sample sites(18 sites) were over SPWL and 0.6%(1 site) were over SPCL. Four pollution grades for sample locations were prescribed by the Law of Soil Environmental Preservation and Pollution Index(PI) for each soil sample was decided according to pollution grades(over 15.0 mg/kg, 6.00-15.00 mg/kg, 2.40-6.00 mg/kg, 1.23-6.00 mg/kg). The pollution contour map around Goro mine based on PI results was finally created to calculate the contaminated area and the remediation volume for contaminated soils. Remediation area with over SPWL concentration was about 0.3% of total area between Goro mine and a projected storage dam and 0.9% of total area was over 40% of SPWL. If the remediation target concentration was determined to over background level concentration, 1.1% of total area should be treated for remediation. Total soil volume to be treated for remediation was estimated on the assumption that the thickness of contaminated soil was 30cm. Soil volume to be remediated based on the excess of SPWL was estimated at 79,200$m^3$, soil volume exceeding 40% of SPWL was about 233,700 $m^3$, and soil volume exceeding the background level(1.23 mg/kg) was 290,760 TEX>$m^3$.

The Study on the Internet-based Virtual Apartment Remodeling and Auto Estimation Simulator (인터넷 기반의 아파트 리모델링 및 자동 내역산출을 위한 시뮬레이터 디자인 연구)

  • 서재은;김성곤
    • Archives of design research
    • /
    • v.15 no.1
    • /
    • pp.191-202
    • /
    • 2002
  • As family types have been diverse, patterns of living and living space became diverse as much as users are. Therefore, it is needed to provide various remodeled design of living space corresponding to changes of users'living patterns, and to provide these remodeling process to users directly on the web. In this paper, use scenario for the Internet-based Virtual Apartment Remodeling Simulator is researched as an export system to remodel space in accordance with users diverse lifestyle paradigm and the website is developed. The study consists of four parts. First, the general concept of remodeling, including the range and types of remodeling, are defined, and the misleading terms in this field are reviewed and organized by secondary research Second, fixed factors and variable factors are differentiated in the complex building for residence and business that was decided as a basic building type in this study. Third, there needed a database for consulting, final material, pre-estimation real estimation for simulation of remodeling. This database was introduced along with floor plan and elevation. Finally, the remodeling simulator is presented by the case study developed on the web. The system structure and use scenario are also presented. In order to present and inspect design alternatives, prototype was produced. The Final simulator was enhanced by defeating problems regarding interface efficiency and missing information of existing online site.

  • PDF