Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju (실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석)

  • Hong, Jeong-Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.667-676
    • /
    • 2014
  • This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.

An Improvement Plan of Contract Price Adjustment through the Problem Analysis of the Current Price Escalation Regulation in Construction Projects (현행 건설공사 물가변동 제도의 문제점 분석을 통한 계약금액조정 개선방안)

  • Park, Yang-Ho;Kown, Beom-Jun;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.435-439
    • /
    • 2006
  • The purposes of study is to propose a new method contract price adjustment in construction projects. The research method of this study includes a case analysis and questionnaire survey. The results of this study are as follows: 1) For improvement method of contract amount adjustment, enactment for legislation pertaining to computation methods such as military's organization through total unit cost, and price flexibility computation at the point of design modification were presented. 2) Arithmetic formulas for cases in which volume is deleted or modified below the price flexibility exemption amount or in which there is no change to quantity, at the occurrence of design modification resulting from price flexibility, were proposed.

  • PDF

Comparative Analysis between GDP Deflator Method and Index Adjustment Rate Method on BTL Sewer Rehabilitation Projects in Jeju (제주도 내 하수관거정비 BTL사업의 GDP 디플레이터 방식과 지수조정률 방식과의 비교 분석)

  • Yang, Du-Suck;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.217-227
    • /
    • 2015
  • This study conducted case studies in order to suggest the improvement of GDP (Gross Domestic Product) deflator method which is adopted on calculating fluctuation rate on BTL (Build-Transfer-Lease) sewer rehabilitation projects in Jeju. As a result, because GDP deflator method calculates fluctuation rate by each quarterly, the fluctuation rate of GDP deflator method is higher than it of index adjustment rate method. And GDP deflator method cannot reflect real price because of applying fixed index in whole construction cost for calculating fluctuation rate. Especially, the notification day - the base point influences fluctuation rate and fluctuation amount strongly in GDP deflator method.

Problems and Improvement Schemes to Historical Cost Fluctuation Ratio Calculation According to the Escalation (물가변동에 따른 실적공사비 등락률 산출의 문제점 및 개선방안)

  • Jeong, Ki-Chang;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.540-545
    • /
    • 2008
  • The purpose of this study is to suggest problems and improving plan of process of calculating escalation rate of the Historical Cost by price fluctuation. In order to implement this research, we analyzed problems by calculating the rate of price fluctuation with Historical Cost and measurement applying method making on-site with historical cost data were included as samples and suggested improving plan to the adjustment of contract cost. The results of research according to this are same as followings:1) Of all construction details, it is more appropriate to calculate price fluctuation by applying measurement method to the contents of historical cost unit. 2) To avoid confusion in calculating method, it was indicated that amendment in part should be achieved in order to calculate by measuring the part of calculating escalation rate of Historical Cost at related law and regulation.

  • PDF

韓國에 있어서 物價變動率 決定과 그 確率的 屬性

  • 윤석범
    • Journal of the Korean Statistical Society
    • /
    • v.5 no.2
    • /
    • pp.129-142
    • /
    • 1976
  • 본논문에서는 물가변동을 미래에 투영하여 예측한다기 보다는 물가변동률 결정을 구조적으로 파악하여 보기로 하되, 고전적인 수량방정식의 입장에서 통화와 소득의 영향력을 시차분포로서 추정하는 것을 일차적인 목적으로 하고 있다. 또한 물가변동에 대한 기대형성을 오차수정기대(error-learning expection) 또는 적응기대(adaptive expection) 형태로 설정하여 일종의 마아코프 일단적 확률과정을 만들어 그 영향력을 추정하였다. 추정 결과, 통화변수의 경우에 있었던 하나의 예외를 제외하고는 모두 일반적으로 기대되고 있는 형태로서 얻어졌다. 통화변수의 경우에도 예외로서 얻어진 결과는 그 나름대로 경제적인 해석이 가능하였으며 또한 전례가 없었던 현상이 아니므로 구태여 예외로서 보다는 일반적인 현상으로 합리화될 수 있었다. 흔히 한 물가를 다른 물가로 설명하려는 순환론적인 연구접근방법을 가능한 한 배제하고 확률적인 요인에 의한 설명을 본연구에서는 시도하였다. 따라서 제변수의 공동형세에 따르는 허위상관을 제거하기 위하여 계절변동이 조정되지 않은 대전기 변동율을 기초 자료를 사용하였다. 앞으로 연구내용의 본질적인 개선을 위하여서는 본연구를 출발점으로 하여 추정모형의 설정에 있어서나 추정방법의 개발, 추정량의 평가 등에 있어서 지속적인 연구노력이 요구된다.

  • PDF

Improvement on the Managerial Method of Price Fluctuation System (물가변동제도 운영방식 개선방안)

  • Lee, Jae-Seob;Shin, Young-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.3-11
    • /
    • 2011
  • There are several causes to recalculate the contract amount in public construction projects. Among them, the escalation clause was introduced in 1969 and now the condition to recalculate the cost is effective after 90 days from the date of contract and the rate of fluctuation should be more than 3% from the date of bidding. The two calculation methods for the rate of fluctuation are item-adjustment and index-adjustment. According to the results of investigation into 4 public institutions and 163 projects, all of them have used the method of index-adjustment and the rate of projects that spend over 6 months obtaining the approval of contract amount adjustment is more than 90%. The reason for spending lots of time is caused by problems of the calculation method on the price fluctuation rate. Therefore, it is necessary that the calculation method should be diversified to cope with the problems and a option of the builder should be expanded as well. Furthermore, if the way to apply correction factors to construction price index and average index based on the producer and consumer price index made by the bank of Korea is added, then the duration will be reduced without additional expenses. This study proposed the diversification of the calculation method using price fluctuation rate and builders' expanded options as improvement on the managerial method of Price Fluctuation System for the prompt and efficient contract amount adjustment.

A Study on the Policies to improve the Escalating Regulations of Construction Price - With a Focus on Results of a Delphi Survey - (물가 변동에 따른 건설공사비 조정 제도의 개선 방안 - 델파이(Delphi) 설문 조사 결과를 중심으로 -)

  • Choi Min-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.203-211
    • /
    • 2004
  • This study is the results to survey on the problems and improvable Policies for current escalation system in construction contracts, through a Delphi survey to experts. From the survey results, it is desirable to decide the fluctuation rate of construction cost, which is the requirement of escalation clause, on the basis of inflation rate or construction cost index. The desirable price fluctuation rate is proposed as a $3\%$ level. However, it is difficult for construction companies to cope with the sudden increase of material price in advance, arising from short-term shock factors such as exchange rate and international raw material's price. Accordingly escalation system for specified materials, as an exceptional mode, should be introduced. As a method to calculate the fluctuation rate, ARCA(adjustment rate for the categories of articles) is more desirable than ARI(adjustment rate for an index), because the ARCA can be more reflected the characteristics of each construction work.To rationalize the ARI method, it is needed to announce the wage index, material index and machinery expense index via detailed classification by construction types. Also, it is desirable to prescribe the bidding date as a starting date of the price change, rather than contact signing date. considering the price change can happen since the biddiilg stage.

주가수익률과 거시경제정책의 관련성에 관한 소고(小考)

  • Kim, Jong-Gwon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.157-158
    • /
    • 2012
  • 이 논문은 기존의 포트폴리오와 관련된 모형에 경기변동(business cycle)과 관련된 변수들을 포함하였을 경우 경기변동이 개인투자자들의 현금 및 주식보유를 통한 자본이득 극대화와 어떤 관련성이 있는지와 관련된 것이다. 기존 문헌들을 살펴보면, 개인투자자들은 경기호황기에는 모멘텀 투자와 소형주와 성장주 등에 포트폴리오를 분산투자하지만 경기가 침체기(recession)에 들어설 경우 수익률이 급등락하는 특성을 지니는 소형주(small cap)에 집중적인 투자를 하는 성향을 나타내고 있다. 한편 이 논문의 분석결과에 따르면, 경기안정과 금리안정정책, 물가안정 등은 서로 상충관계(trade-off)에 놓여 있음에도 불구하고 코스피수익률과 코스닥수익률에 모두 향후 영향을 미칠 것으로 판단된다. 이는 현재까지의 정책조합(policy mix)보다 더 정교하고 타이밍을 잘 포착하지 않으면 정책실패에 따른 경기와 물가불안이 동시에 나타나는 스태그 플레이션(stagflation)으로 이어질 수 있음으로 정책집행의 효율성이 어느 때보다도 중요해 질 것으로 보인다.

  • PDF

주가수익률과 거시경제정책의 관련성에 관한 시사점 연구

  • Kim, Jong-Gwon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.415-419
    • /
    • 2012
  • 이 논문은 기존의 포트폴리오와 관련된 모형에 경기변동(business cycle)과 관련된 변수들을 포함하였을 경우 경기변동이 개인투자자들의 현금 및 주식보유를 통한 자본이득 극대화와 어떤 관련성이 있는지와 관련된 것이다. 기존 문헌들을 살펴보면, 개인투자자들은 경기호황기에는 모멘텀 투자와 소형주와 성장주 등에 포트폴리오를 분산투자하지만 경기가 침체기(recession)에 들어설 경우 수익률이 급등락하는 특성을 지니는 소형주(small cap)에 집중적인 투자를 하는 성향을 나타내고 있다. 한편 이 논문의 분석결과에 따르면, 경기안정과 금리안정정책, 물가안정 등은 서로 상충관계(trade-off)에 놓여 있음에도 불구하고 코스피수익률과 코스닥수익률에 모두 향후 영향을 미칠 것으로 판단된다. 이는 현재까지의 정책조합(policy mix)보다 더 정교하고 타이밍을 잘 포착하지 않으면 정책실패에 따른 경기와 물가불안이 동시에 나타나는 스태그 플레이션(stagflation)으로 이어질 수 있음으로 정책집행의 효율성이 어느 때보다도 중요해 질 것으로 보인다.

  • PDF

주가수익률과 거시경제정책의 관련성에 관한 충격반응분석 연구

  • Kim, Jong-Gwon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.409-414
    • /
    • 2012
  • 이 논문은 기존의 포트폴리오와 관련된 모형에 경기변동(business cycle)과 관련된 변수들을 포함하였을 경우 경기변동이 개인투자자들의 현금 및 주식보유를 통한 자본이득 극대화와 어떤 관련성이 있는지와 관련된 것이다. 기존 문헌들을 살펴보면, 개인투자자들은 경기호황기에는 모멘텀 투자와 소형주와 성장주 등에 포트폴리오를 분산투자하지만 경기가 침체기(recession)에 들어설 경우 수익률이 급등락 하는 특성을 지니는 소형주(small cap)에 집중적인 투자를 하는 성향을 나타내고 있다. 한편 이 논문의 분석결과에 따르면, 경기안정과 금리안정정책, 물가안정 등은 서로 상충관계(trade-off)에 놓여 있음에도 불구하고 코스피 수익률과 코스닥수익률에 모두 향후 영향을 미칠 것으로 판단된다. 이는 현재까지의 정책조합(policy mix)보다 더 정교하고 타이밍을 잘 포착하지 않으면 정책실패에 따른 경기와 물가불안이 동시에 나타나는 스태그플레이션(stagflation)으로 이어질 수 있음으로 정책집행의 효율성이 어느 때보다도 중요해 질 것으로 보인다.

  • PDF