• Title/Summary/Keyword: 멍에 부재

Search Result 3, Processing Time 0.015 seconds

Flexural Strengthening Characteristic of Sleeper Member Traditional Wooden Architecture (전통 목구조 멍에 부재의 휨 보강 특성)

  • Kim, Jeong-Sup;Cho, Cheol-Hee;Shin, Young-Seok;Cho, Youn-Hee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.2
    • /
    • pp.145-152
    • /
    • 2010
  • This study investigates experimentally flexural behavior and CFB(Carbon Fiber Bar) reinforcing effects of timber sleeper in traditional storied tower house. As a test result, standard sleepers without CFB(Carbon Fiber Bar) reinforcement show flexural cracks at the bottom member at the beginning of loading stage and leads to fracture. However, reinforced specimens with CFB show initial shrinkage at the upper part of specimen by compression, instead of flexural cracks at the bottom, and finally show compressive failure or fracture after failure of CFB and it proves that reinforcing effects by CFB are exerted from early loading. Reinforced specimens showed higher strength in yield strength by 6%~38%, and ultimate strength by 8%~17%, than those of standard specimens. Reinforced specimen is considered that specimen with flexural reinforcement using CFB can expect flexural deflection control effect. Reinforced specimen shows higher ductile coefficient increase of average 141% compared than standard specimens and it proves that higher structural ductile behavior can be expected in reinforced specimens.

An Experimental Study on the Performance and Field Application of Low Noise Beam-slab Formwork using Table Type Multi-stage Drop System (테이블형 다단 드롭 시스템을 이용한 저소음 보-슬래브 거푸집의 구성부재 성능 및 현장적용에 관한 실험적 연구)

  • Ryu, Hwa-Sung;Jeong, Woo-Jin;Kim, Deuck-Mo;Song, Seong-Yong;Shin, Sang-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.349-360
    • /
    • 2017
  • In concrete construction work, formwork is an important process that accounts for 10% of the total construction cost. Recent buildings are becoming bigger and higher. In order to maximize the efficiency and safety of this formwork, the system of formworking has been systematized. However, the human accidents and the noise complaints arise from dismantling processes frequently occur. In order to solve these problems, most of them are dependent on foreign technology, but they do not take into consideration the conditions of domestic construction site. In this study, we developed a table type multi-drop system form for a slab and beam which can improve the process, safety and reduction of disassembly noise, and evaluated the physical properties of the main members which are used in the system. The results of this study show that there is sufficient strength to be used as a slab and a laying material for both a yoke beam and a supporting post. The noise level is improved compared to existing method.

Re-review of the Structure of the Jeongsa-Kisun (Senior Envoy Ship) in the Joseon Dynasty from the Perspective of Professional Shipbuilding Engineering (조선통신사 정사 기선(騎船) 구조의 조선기술 연구)

  • HONG Sunjae
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.4
    • /
    • pp.242-275
    • /
    • 2022
  • This study tries to reveal the structure of the "Kisun"(senior envoy ship) taken by senior envoys for the 10th to 12th visits to Japan from the perspective of professional shipbuilding engineering focusing on the theory of the ship in the travel logs of royal envoys to Japan (Sahaengrok) written by Joseon Tongsinsa that includes 12 visits to Japan for about 200 years from 1607 to 1811. The results of the study showed that the size of Kisun for the 10th to 12th envoy visits was 19 Pa (把) and a half in length and 6 Pa (把) and 2 Cheok (尺) in width. The height of the Sampan was found to be 2 Pa (把) and 1 Cheok (尺) based on records in Gyemisusarok and Jeungjeonggyorinji. The structure of Kisun was different for each visit but, it was found that Kisun was mainly composed of a main deck, bow (bow plate, stem plate), stern (stern plate), Sampan, Meonge (support), Garyong (support), Sinbang, Gungji, deck, two masts and sail, Gurejjak (mast support), Panok, stern Panok, Taru, dodger, anchor reel, stairs, rail, rudder, oar, and anchor. In addition, wood and iron nails were used together for connection. It was also found that the sail was made of herbage and cotton. This study found that Kisun, which was operated for the 10th and 12th envoy visits, was big in terms of length and height among the Joseon Tongsinsa fleet to show the authority and dignity of Joseon and that it had passages outside on the sides of the vessel and paddles were located between the sides and Panok structure and rails were installed on four sides on the Panok, improving stability and linear beauty. The walls of Panok were decorated with the royal Dancheong pattern and fancy murals. In addition, it was found that they wished for a safe voyage by drawing a demon face on the bow. Therefore, it was revealed that Kisun, which was taken by envoys as recorded in travel logs, was made by the state and equipped with structures and functions that enabled international voyages.