• Title/Summary/Keyword: 마감공사

Search Result 115, Processing Time 0.022 seconds

An Examination of a Risk Assessment Method and Analysis of Defect Types of Apartment Finishing Works (공동주택 마감공사의 하자유형별 분석 및 위험성 평가 방법에 관한 연구)

  • Son, Seunghyun;Lee, Jae-hyeon;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.2
    • /
    • pp.249-260
    • /
    • 2024
  • In recent years, the proportion of medium and small-sized apartments within the housing market has seen a noticeable increase, alongside a corresponding rise in disputes related to construction defects. Such disputes are most prevalent in the finishing works phase of construction, which not only are frequent in occurrence but also impose significant repair costs. Furthermore, there is a noticeable scarcity of research focused on the quality management of finishing work defects prior to the completion of construction. Addressing this issue necessitates a methodology capable of preemptively identifying defects by analyzing their frequency and associated costs across various defect types. Consequently, the aim of this study is to propose a risk assessment methodology by conducting an analysis of defect cases across 3,299 apartment units, considering aspects such as frequency and severity. The outcomes of this research endeavor are expected to offer practical management strategies to enhance the quality of apartment finishing works and serve as an academic foundation for the enhancement of construction management systems pertaining to apartment finishing works.

A Analysis and Improvement of Manpower Management For Finish Work in High-Rise Housing Projects (초고층 주상복합 건물 마감공사 출역인력관리 현황분석 및 개선방안)

  • Won, Kyeong-Suk;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.600-603
    • /
    • 2004
  • Recently, Housing projects in the center of the Metropolis are getting higher, larger, more complex gradually, the resources are increasing greatly. Especially, the right manpower in the right place could quite important factor because the construction cites are wide and many subcontractors and labors throw into finish works in High-rise Housing projects. Differing from apartment building projects. it is only four or five years that high rise building projects are started so, there is little data for manpower information. Furthermore it is difficult that the data gathering and managing because manpower management is usually used to execute by subcontractors from supply to demand. Consequently, this study, proposed develop management for accurate manpower plan and efficient collection and practical use of manpower information through analysis of present condition in construction sites

  • PDF

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

A Study on the Application of TACT Planning & Scheduling in Finish Work of Apartment Houses (공동주택 마감공사에서의 택트공정관리 적용에 관한 연구)

  • Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.422-425
    • /
    • 2003
  • The purpose of this study is using a TACT planning and scheduling for apartment houses construction that have many of same units. Because using a TACT planning and scheduling is concluded time reduction at same units as apartment plan. The main contents of this study are 1) window and door work through the field study, 2) adjust worker assignment to minimize work time variation, and 3) an effect of working time through a case study. As a result, the total working time can be improved $21.2\%$ by using the TACT planning and scheduling. The stu요 recommends that 1) establish an accurate data between work period and resource, and 2) preparation to measures minimization of waiting time before using a TACT planning and scheduling.

  • PDF

A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building (초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2003
  • Recently, large residental buildings including high-rise apartment and a multi-business and commercial-residential building are appearing in the form of Korean construction work. According to this large-size trend a tenn and cost of construction works was largely increased. Therefore, studies of techniques construction management for successful project are lively being progressed. This study introduced Just-In-Time form and Lean Construction concept in order to establish management system of a house construction work taking up much portion on aspects of work scale and materials transportation in finishing works of high-rise residental building architecture. The process of house construction works will be analyzed with these two principles for productivity improvement and then the improvement plan will be suggested. This analysis and proposal can induce the flow of finishing works smoothly and contribute to success of project through saving of a tenn and cost of construction works.

  • PDF

Study on the Defects of Finishing Works of Apartment Houses during Warranty Liability Period and its Correlation (공동주택 마감공사의 하자보수기간 현황 및 연관성 연구)

  • Lee, Ung-Kyun;Seo, Deok-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.385-391
    • /
    • 2017
  • The warranty liability period for defects in apartment buildings by work type is not based on scientific analysis, making the appropriateness of the term a culprit behind the lawsuits. Therefore, this research aims to evaluate the appropriateness of the warranty liability term of apartment buildings by identifying the current status of defects, in particular, caused by finishing works. That is because the number of defects, caused during the finishing works, accounted for the largest portion of the total defect cases of apartment buildings reported to the Apartment Defect Dispute Mediation Committee under the Ministry of Land, Infrastructure, and Transport of Korea between 2010 and 2011. The result from analyzing claims for defect repairs of the finishing works showed that most cases by work type continued to be made after two years, and only about 60% were charged within the warranty period. And, defects by work type have correlation, which needs to be considered for a better construction technique. Considering a low correlation between the possibility of defects and the construction performance rankings, which are highly relevant to the apartment preference. It is believed that there needs to be a qualification process for agencies that actually performs finishing works.

The application of tact time at finish work for building construction - Focused on Office Building - (건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발 - 오피스 건축물을 중심으로-)

  • Yoon, You-Sang;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.90-97
    • /
    • 2005
  • Poor usage of work-continuity for planning and management is one of the leading causes of decreased productivity in high-rise and complexity construction projects. For efficient finish work, tact scheduling method needs to be implemented according to tact time. But there are the studies about zoning of work area, daily construction information and tact planning and management, there are not the studies about tact time yet. The purpose of this study is to help implementation of tact scheduling by tact time and adjusted work-plan. The main contents of this study are as follow; (1)Tact time has been calculated as coordination of work-plan between a general contractor and specialties. (2)Project-plan can be without delay by tact time calculation method.

Nexus based Quality Inspection Support Model for Defect Prevention of Architectural Finishing Works (하자예방정보 넥서스 기반 건축마감공사 품질점검 지원 모델)

  • Lee, Hye-Rin;Cho, Dong-Hyun;Park, Sang-Hun;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.59-67
    • /
    • 2017
  • At the completion of the construction, various finishing processes are concentrated. This imposes a burden on the on-site manager and imposes on experience based quality control, thereby causing deviations in the quality of construction depending on supervisor or worker's individual competence. In addition, the information related to quality control is frequently scattered in various types of documents such as specifications and drawings, and checkpoints are frequently omitted. It is necessary to provide a tool that can effectively provide the practitioner before or during the inspection work by systematically storing the information related to the defect prevention and linking them in a mutually referential state. This paper proposes an quality inspection support model that can systematically store necessary information on activity or room basis for the quality check of the apartment house finishing work. Establish a defect prevention information base and a information nexus by linking specifications, design standards, checklists, regulations, defect cases, and drawings to the finishing process and the rooms. Based on this, information registration and search interface are presented. It can contribute to securing a certain level of construction quality or more by suggesting a frame that can be utilized by linking various defects prevention information with the focus on closing activity and room.

Applied cases of advanced construction & engineering technology at Tower Palace III Project (타워팰리스 III 현장의 첨단 시공 및 엔지니어링 기술 적용사례)

  • Wang In-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.202-213
    • /
    • 2003
  • Tower Palace III project is the highest residential and commercial high-rise complex building in Korea. In order to construct a high-rise building, advanced construction and engineering technology is required. Therefore, with more developed construction and engineering technology based upon accumulated knowledge, construction speed of 13.4 days per floor including finish work was achieved in this project. To achieve this project successfully, three main advanced construction technology were applied: 1) Construction methods for 3-day cycle of structural work and curtain wall, 2) Tact scheduling method for finish work, 3) Management system of material, labor, work, and information. Also, four main engineering technology were applied: 1) New material such as high -flowing concrete and high strength concrete of 800 kgf/cm2, 2) New method such as a pipe-cooling system of a cool water circulating type, 3) Mechanical system such as smart-fan controlling kitchen-ventilation system, 4) Electrical system such as false car system.

  • PDF

Building construction process improvement using prefabricated materia (공업화자재의 활용을 통한 공정합리화)

  • Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.90-96
    • /
    • 2003
  • The purpose of this study is to present an improvement building construction process by using prefabricated materials. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Non-value adding activities were found at existing slab form work process by current state mapping(CSM) 2) Future state mapping(FSM) suggest process Integration to slab form work. 3) Slab form work is analyzed reduction time-cost by prefabricated material. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction and application of prefabricated material should be increased.