• Title/Summary/Keyword: 리스크 평가관리

Search Result 194, Processing Time 0.029 seconds

A Study on the Risk Assessment Occurred Possibly in a Civil Project (토목공사에서 발생 가능한 리스크평가에 관한 연구)

  • Yoon, Yong-Kyun
    • Explosives and Blasting
    • /
    • v.29 no.2
    • /
    • pp.59-66
    • /
    • 2011
  • A variety of risks caused by natural, technological and biological hazards threaten a business continuity of an organization. Business continuity is very important issue for all organizations and its proper management may control success and failure of an organization. Business continuity plan (BCP) may be defined as a management process which provides a business continuity. BCP includes risk management, operational continuity plan, response/ recovery, exercise/study and crisis communication, etc. Risk management is a systematic method to identify, analyze, evaluate and treat emergency risks and risk assessment is composed of identifying, analyzing and evaluating emergency risks. Risk assesment is the first step for making BCP. In this study, risk assessment has been conducted for sewer laying project. Through assessing risks, 18 risks that may threaten the construction operation are identified and it is founded to be that high levels of risks which require treatment are 'collapse of excavation surface', 'breakage of ground infra-facilities', 'noise & dust dispersion' and 'rise of material costs'.

A Study on the Risk Assessment Methodology and Application for International Plants Construction (해외 플랜트 공사 리스크 평가 방안 및 적용에 관한 연구)

  • An, Sung-Hoon;Lee, Young-Nam;Jo, Ho-Kyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.134-142
    • /
    • 2008
  • Recently, international plants construction markets are expending. Specially, oil/gas plants constructions in Middle-East are booming. However, international plants construction projects are high risky. So a risk assessments and managements methodology for international plants construction is needed. In this study, the risk assessment methodology for international plants construction is proposed on the basis of the literature review in the international construction risk assessment methods and the knowledge of experts explored by interview. In addition, case study in Middle East was applied for reviewing these risk assessments and managements methodology for international plants construction.

An Exploratory Study on the Relationship with Previous Project Risk Evaluation and Project Performance (사전 프로젝트 리스크 평가와 프로젝트 성과와의 관계에 관한 탐색적 연구)

  • Hosnag, Kim;Kyungsik Yang
    • Journal of Service Research and Studies
    • /
    • v.12 no.3
    • /
    • pp.70-92
    • /
    • 2022
  • Project risk assessment is the most important activity performed at the beginning of a project because it can judge the performance of the project in advance. In this study, We were evaluated risk with traditional risk factors such as technology and schedule, etc, and Indirect risks factors such as financial, strategic, and special risks. and then, we analyzed what kind of relationship these risk evaluation factors have on business performance and customer satisfaction. As a result of the research, it was found that the risk evaluation items had a relationship with performance and customer satisfaction. However, It is possible that the performance may differ depending on how risks are managed after risk assessment. Therefore, follow-up studies should be conducted, including information on risk management practices. This study is meaningful that presenting practical risk evaluation items and at the same time identifying the relationship with performance. We plan to further the study in future studies including the evaluation of risk management process.

Risk Assessment and Clasification for Climate Change Adaptation: Application on the Method of Climate Change Risk Assessment in the UK (기후변화 적응을 위한 리스크 평가 및 유형화: 영국의 정성적 리스크 평가 방법론 적용)

  • Kim, Dong Hyun
    • Journal of Environmental Policy
    • /
    • v.14 no.1
    • /
    • pp.53-83
    • /
    • 2015
  • Recently, climate change risk assessment has been discussed as a medium process for making climate change adaptation policies in the research field of climate change adaptation. Climate change risk assessment has been understood to have an intermediary role among impact assessment, vulnerable assessment and policy, and is used in the process of devising adaptation policies in the United Kingdom (UK). This paper quantitatively assessed the risks of climate change in Korea, applied the methods used in the UK, underwent the classification process and suggested implications of Korean adaptation policies. A survey of experts, based on Delphi's method and the classification criterion developed by Klinke and Renn(2002), was also carried out. A list of climate risks was created from the climate change impact and vulnerability assessment report of Korea, first national adaptation policy of Korea, and general climate risks of the UK. From the results, 42 risks out of total 125 risks were selected based on their importance. The assessed risks with factors, such as high impact and urgency, are related to repeated and large scale damage from storms and floods caused by abnormal or extreme weather events. Ecological changes and social infrastructure risks were engaged as required as a policy response for medium to longer term. As for making the classification, types of climate risks were suggested to manage the basic capacity in relation to social trust, triggering mechanism and responsibility. Following suggestions are put forward as the base of autonomous adaptation: increasing the capacity of civil society, mutual trust and civil participation in adaptation policy process.

  • PDF

A risk management system applicable to NATM tunnels: methodology development and application (NATM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Lee, Kang-Hyun;Kim, Byung-Kyu;Lee, In-Mo;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.2
    • /
    • pp.155-170
    • /
    • 2020
  • In this paper, a risk management system applicable to NATM tunneling projects is proposed. After investigating case histories in NATM tunnel collapse, this paper analyzes the potential risk factors and their corresponding risk events during NATM tunnel construction. The risk factors are categorized into three groups: geological, design and construction risk factors. The risk events are also categorized into four types: excessive deformation, excessive deformation with subsidence, collapse inside tunnels, and collapse inside tunnels with subsidence. The paper identifies risk scenarios in consideration of the risk factors and proposes a risk analysis/evaluation method for the NATM tunnel risk scenarios. Based on the evaluation results, the optimal mitigation measure to handle the risk events is suggested. In order to effectively facilitate a series of risk management processes, it is necessary to develop a risk register and a management ledger for risk mitigation measures that are customized to NATM tunnels. Lastly, the risk management for an actual NATM tunnel construction site is performed to verify the validity of the proposed system.

A Product Risk Assessment based on Scenario for Safety Management (제품안전관리를 위한 시나리오 기반의 리스크 평가기법 연구)

  • Suh, Jungdae
    • Journal of Digital Convergence
    • /
    • v.12 no.8
    • /
    • pp.101-112
    • /
    • 2014
  • In this study, a risk assessment method based on scenario for the product safety management in Korea has been developed and proposed. To this end, Korea's related regulations for product safety management should be analyzed first, and the risk assessment method necessary for the enforcement of the regulations is presented by itemizing the method into the case of general injury and toxic substances. The features of the method presented in this study are as follows: (i) It is a method based on the injury scenario which can occur during the use of product. (ii) It assesses a risk based on the probability of the scenario and the severity of injury. (iii) In the case of toxic substances, it assesses a risk considering the hazard of the toxic substances on the human body and the severity of injury. To determine the probability of the injury scenario, this study has decomposed the scenario into several configuration factors and estimates each factor's probability to calculate the whole scenario's probability. The results of risk assessment through the method of this study are presented and it is shown that the method can be applied to the product classification for the product safety management.

FREES : Fuzzy Risk Evaluation Expert System (Fuzzy 이론을 활용한 건설프로젝트 리스크 분석 및 평가 시스템)

  • Cho Ick-Rae;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.53-62
    • /
    • 2000
  • This study proposes FREES(Fuzzy Risk Evaluation Expert System) for analyzing and evaluating risks occurring during the construction process. The feasibility of this system model was tested by virtual scenario. For the development of the model, at first, risk breakdown structure was established based on risks identified in the existing researches, that is quantitative and qualitative. FREES can reflect human cognition process in the risk analysis and evaluation by adopting artificial intelligence fuzzy theory, differentiating the existing quantitative analysis model. The FREES can be applied to all the project phases from planning to operation & maintenance stage.

  • PDF

Library Risk Management and Insurance (도서관 리스크관리와 보험)

  • Chung, Hye-Kyoung
    • Journal of Information Management
    • /
    • v.31 no.4
    • /
    • pp.1-12
    • /
    • 2000
  • The potential risks, involved with the management of a library, may cause a tremendous economic loss, so require a systematic management. The rist management process, consisting of risk identification, risk measurement selection of risk treatment methods, implementation, and monitoring and evaluation, suggests the use of insurance to deal with property risks, liability risks and personnel risks. For the systematic risk management of a library, risk manager should be appointed to be responsible for program development and insurance purchase. The limited coverage of library risks, provided by the school cooperative society, should be supplemented through development of insurance products. Further study is required to improve the library risk management and the application of insurance in a systematic and realistic way.

  • PDF

Development of Fuzzy Model for Analyzing Construction Risk Factors (건설공사의 리스크분석을 위한 퍼지평가모형 개발)

  • Park Seo-Young;Kang Leen-Seok;Kim Chang-Hak;Son Chang-Bak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.519-524
    • /
    • 2001
  • Recently, our construction market recognizes the necessity of risk management, however the application of practical system is still limited on the construction site because the methodology for analyzing and quantifying construction risk and for building actual risk factors is not easy. This study suggests a risk management method by fuzzy theory, which is using subjective knowledge of an expert and linguistic value, to analyze and Quantify risk. The result of study is expected to improve the accuracy of risk analysis because three factors, such as probability, impact and frequency, for estimating membership function are introduced to quantify each risk factor.

  • PDF

항로표지 리스크 평가에 기초한 시설운영률 산정에 관한 연구

  • Jeon, Min-Su
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2014.10a
    • /
    • pp.336-338
    • /
    • 2014
  • 항로표지시설은 선박안전통항 유도시설로서 등광, 형상, 색채, 음향, 전파 등을 수단으로 선박에 지표가 되는 시설로서 그 설치는 주변의 해양환경, 해상교통 및 위험정도에 따른 객관적 판단에 의하여 설치되어야 한다. 본 연구에서는 항로표지의 신설 및 평가 시 적용가능한 리스크평가에 대하여 연구하고 그 방법을 제안한다. 정량적 리스크평가에 대한 IMO(국제해사기구), 및 IALA(국제항로표지협회)의 관련 기준을 연구하여 아국 항로표지시설의 리스크평가를 위한 기초자료로 활용하였다. 본 연구의 결과는 항로표지 시설의 설치, 유지 및 관리를 담당하는 해양수산부의 시설물 평가에 효율적인 판단 자료로 활용될 것으로 기대한다.

  • PDF