• Title/Summary/Keyword: 리스크 관리 계획 및 절차

Search Result 6, Processing Time 0.02 seconds

A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK - (성공적인 해외 건설 프로젝트 수행을 위한 리스크 관리 계획·절차 구축 및 활용 방안에 대한 연구 - 영국의 사업관리 기법인 PRINCE2를 기반으로 -)

  • Kang, Sinbong;Kim, Seungchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.48-55
    • /
    • 2016
  • Risk management is an important element for successful management of overseas construction projects. This study reports a case study in which we proposed a risk management planning and procedure for plant construction which can be applied throughout the project life cycle. We analyzed the risk management practices of Korean construction companies by applying the concept of the PRINCE2 method developed in the UK, and proposed a risk management planning and procedure with organizational structure and working process. The suggested risk management planning and procedure was applied to an overseas plant construction project, and produced good results. It is believed that the procedure suggested here can also be aplied to other companies to enhance the competency in the global construction market.

A Study on the Risk Assessment Occurred Possibly in a Civil Project (토목공사에서 발생 가능한 리스크평가에 관한 연구)

  • Yoon, Yong-Kyun
    • Explosives and Blasting
    • /
    • v.29 no.2
    • /
    • pp.59-66
    • /
    • 2011
  • A variety of risks caused by natural, technological and biological hazards threaten a business continuity of an organization. Business continuity is very important issue for all organizations and its proper management may control success and failure of an organization. Business continuity plan (BCP) may be defined as a management process which provides a business continuity. BCP includes risk management, operational continuity plan, response/ recovery, exercise/study and crisis communication, etc. Risk management is a systematic method to identify, analyze, evaluate and treat emergency risks and risk assessment is composed of identifying, analyzing and evaluating emergency risks. Risk assesment is the first step for making BCP. In this study, risk assessment has been conducted for sewer laying project. Through assessing risks, 18 risks that may threaten the construction operation are identified and it is founded to be that high levels of risks which require treatment are 'collapse of excavation surface', 'breakage of ground infra-facilities', 'noise & dust dispersion' and 'rise of material costs'.

A Study on Disaster Recovery Planning and Automation Support System Implementation in a Data Consolidation Center of Multi-organizations (다기관 통합전산센터의 재해복구체계 및 자동화시스템 구축에 관한 연구)

  • Im, Seong-Muk;Lee, Yeong-Jae
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.215-219
    • /
    • 2004
  • 본 연구에서는 다기관 통합전산센터의 다양한 운영모형 분석을 통한 효과적인 운영 대안을 수립하고, 최적 운영대안의 상시운영체계(BCP) 구성방향을 제시한다. 또한 현행 다기관 통합전산센터의 리스크 분석과 리스크 관리 특성을 모형화하여 다기관 통합전산센터의 상시운영계획 이행 절차의 자동화 시스템 구축 방안을 제시한다. 이를 위해 본 연구는 4가지 사항을 중점적으로 다루었다. 첫째, 통합전산센터와 관련한 다양한 용어에 대해 정리를 하고, 통합전산센터의 국내외 사례를 살펴봄으로써 통합전산센터의 중요요소를 도출하였다. 둘째, 다기관 통합전산센터의 논리적 운영모형을 분류하여 각 모형에 따른 장${\cdot}$단점과 실현가능성을 진단하고, 대표적인 모형에 대한 가상환경을 구성하여 운영비용 측면에서 비교하였다. 또한 AHP기법을 이용하여 관련 전문가 인터뷰를 통한 정성적인 측면에서의 비교도 실시하였다. 셋째, 운영모형분석을 통하여 도출된 최적대안에 대한 다기관 통합전산센터의 상시운영체계의 수립 방향에 대하여 기존의 정보시스템을 위한 방법론과의 비교를 통하여 설명하였다. 넷째, 다기관 통합전산센터의 상시운영체계의 구성방향을 반영한 자동화시스템의 기본적인 구축방안에 대하여 간략하게 정리하고 그 기대효과를 제시하였다.

  • PDF

Conceptual Study for Risk Assessment of Asset Management of Infra Structure System (국가기반시설 자산관리위험도분석 개념 연구)

  • Park, Mi Yun;Park, Hung Ju
    • Journal of Korean Society of Disaster and Security
    • /
    • v.5 no.1
    • /
    • pp.43-47
    • /
    • 2012
  • The asset management of infra facilities is a total framework for finally supporting a safe and comfortable service, which includes functions of supporting evaluation of condition and performance of infrastructures, making the decision method of repair or rehabilitation of deteriorated facilities, and lengthening the life cycle of structure through the decision of adequate cost and time of repair or reinforcement. In the range of the asset management, organization, human, the target, and information & data of company are included. Therefore, in this paper, appling the method of asset management analysis to the infra structures, the process of the risk assesment using BRE (Business Risk Exposure) and the basis of consisting ORDM (Optimized Renewal Decision-Making) are expressed.

The Continuity of Operation (COOP) Application to a Local Government for Disaster Risk Reduction

  • Jang, Young-Jin;Wang, Won-joon;Jung, Jae-Wook;Seo, Yong-Seok
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.12
    • /
    • pp.157-166
    • /
    • 2019
  • Globally, various disasters such as typhoons, floods, earthquakes, fires, explosions have caused work to be halted. If there is a large-scale disaster at public institutions in charge of major national affairs and their works are interrupted, not only will there be property damage, but there will also lead to a decline in national credibility and direct and indirect impacts on the people. Therefore, it is necessary to ensure continuity of operation by minimizing the interruption period of critical operations due to disasters. Overseas advanced countries such as the United States and Japan developed guidelines for Continuity of Operation (COOP) to prevent unexpected work disruptions caused by disasters. Recognizing the necessity of COOP in South Korea, a relevant law has been newly established in 「the Framework Act on the Management of Disasters and Safety」 to enable public institutions to establish the COOP in response to this situation. In this study, the definition, the necessity and overseas cases of COOP were investigated and described. Using the templates developed by these results, operational impact analysis, risk assessment, operational continuity strategies and operational continuity procedures were applied to "A" City Hall in Gyeonggi-do province and those results were described. The objective of this study is to substantially contribute to the introduction of COOP to local governments through their pilot application and implications of COOP.

Study of Failure Mode and Effect Analysis in Brachytherapy (근접방사선치료에 관한 사고유형과 영향분석 연구)

  • Lee, Soon Sung;Park, Dong Wook;Shin, Dong Oh;Kim, Dong Wook;Kim, Kum Bae;Oh, Yoon-Jin;Kim, Juhye;Kwon, Na Hye;Kim, Kyeong Min;Choi, Sang Hyoun
    • Journal of the Korean Society of Radiology
    • /
    • v.11 no.7
    • /
    • pp.627-635
    • /
    • 2017
  • Brachytherapy is generally performed in conjunction with external radiation therapy, and the treatment course is very complicated, which can lead to radiation accidents. In order to solve this problem, we designed the process map by applying the failure mode and effects analysis (FMEA) method to the Brachytherapy and scored the risk priority number (RPN) for each treatment course based on this process map. The process map consisted of five steps, Patient consulting", "Brachytherapy simulation", "CT simulation", "Brachytherapy treatment planning" and "Treatment". In order to calculate the RPN, doctor, medical physicist, dose planners, therapist, and nurse participated in the study and evaluated occurrence, severity, and lack of detectability at each detail step. Overall, the process map is preceded by a patient identification procedure at each treatment stage, which can be mistaken for another patient, and a different treatment plan may be established to cause a radiation accident. As a result of evaluating the RPN for the detailed steps based on the process map, overall "Patient consulting" and "Brachytherapy treatment planning" step were evaluated as high risk. The nurses showed a tendency to be different from each other, and the nurses had a risk of 55 points or more for all the procedures except "Treatment", and the "Brachytherapy simulation" step was the highest with 88.8 points. Since the treatment stage differs somewhat for each medical institution performing radiotherapy, it is thought that the risk management should be performed intensively by preparing the process map for each institution and calculating the risk RPN.