A Study on the Direction for Developing the Korean PDRI(Project Definition Rating Index) (한국형 PDRI(Project Definition Rating Index)기법 개발 방향)

  • Hong, Sim-Hee;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.168-169
    • /
    • 2016
  • Risk management at an early stage of projects is known as an effective method expected various benefits. The PDRI(Project Definition Rating Index) by the CII(Construction Industry Institute) is defined project scope for reducing risks. In addition, the PDRI is one of the verified methods for achieving benefits by a risk management. The literature review in Korea about risk management is all about focusing on construction works and the construction phase. Thus, we need to extend the perspective of a project management such as the PDRI. To develop the Korean PDRI, However, we have to consider Korean situations. Therefore, in this study, we analyze some previous studies of PDRI' indexes and its using methods, and suggest the new direction for using PDRI in Korea. This method will enable to improve the scoring method of a project management with PDRI in Korea.

  • PDF

A Study on the Damage Analysis of Chemical Substances Explosion Accident Using GIS (GIS를 활용한 화학물질 폭발사고 피해분석 연구)

  • Ham, Tae-Yuun;Kwon, Gi-Min;Song, Moon-Soo;Yun, Hong-Sik
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.99-100
    • /
    • 2022
  • 화학산업이 발전함에 따라 잠재적인 화학물질 폭발사고 위험 또한 증가하고 있다. 순식간에 치명적인 인명, 재산피해를 남기는 폭발에 대한 영향을 예측, 분석하기 위해 다양한 해석모델이 활용되고 있지만, 폭발의 물리적 특성상 다양한 형태의 건물이 밀집된 지역에 대해서는 해석모델 사용만으로 높은 정확도의 분석을 진행하기에는 어려움이 있다. 따라서 본 연구는 GIS 공간정보와 3D 폭발 시뮬레이션의 약결합 방식을 적용하였다. 실제 연구지역과 동일한 환경을 구현하여 시뮬레이션을 구동하였고 이에 따른 폭발 규모와 폭발에 노출된 대상별 가해지는 압력 값을 도출하였다. TNT를 기준으로 위험물 저장 및 취급시설에 대한 최저 기준인 지정수량 200kg을 적용하였음에도 최대 2,960kPa의 압력이 발생하는 것으로 확인되었다. 본 연구로 도출된 결과에 건축물의 용도와 중요도를 적용한다면 토지이용계획 및 공간활용에 반영할 수 있으며, 안전관리자로 하여금 리스크 평가, BC분석, 안전관리계획 수립 등에 활용 가능하다고 사료된다.

  • PDF

Conceptual Study for Risk Assessment of Asset Management of Infra Structure System (국가기반시설 자산관리위험도분석 개념 연구)

  • Park, Mi Yun;Park, Hung Ju
    • Journal of Korean Society of Disaster and Security
    • /
    • v.5 no.1
    • /
    • pp.43-47
    • /
    • 2012
  • The asset management of infra facilities is a total framework for finally supporting a safe and comfortable service, which includes functions of supporting evaluation of condition and performance of infrastructures, making the decision method of repair or rehabilitation of deteriorated facilities, and lengthening the life cycle of structure through the decision of adequate cost and time of repair or reinforcement. In the range of the asset management, organization, human, the target, and information & data of company are included. Therefore, in this paper, appling the method of asset management analysis to the infra structures, the process of the risk assesment using BRE (Business Risk Exposure) and the basis of consisting ORDM (Optimized Renewal Decision-Making) are expressed.

The Study on Corporate Information Security Governance Model for CEO (최고경영자를 위한 기업 정보보호 거버넌스 모델에 대한 연구)

  • Kim, Do Hyeong
    • Convergence Security Journal
    • /
    • v.17 no.1
    • /
    • pp.39-44
    • /
    • 2017
  • The existing enterprise information security activities were centered on the information security organization, and the top management considers information security and enterprise management to be separate. However, various kinds of security incidents are constantly occurring. In order to cope with such incidents, it is necessary to protect information in terms of business management, not just information security organization. In this study, we examine the existing corporate governance and IT governance, and present an information security governance model that can reflect the business goals of the enterprise and the goals of the management. The information security governance model proposed in this paper induces the participation of top management from the planning stage and establishes information security goals. We can strengthen information security activities by establishing an information security plan, establishing and operating an information security system, and reporting the results to top management through compliance audit, vulnerability analysis and risk management.

Analysis of flood and drought disaster risks in the Mekong Delta (메콩 삼각주의 홍수 및 가뭄 재해 위험 분석)

  • Ko, Ick Hwan;Choi, Byung Man;Kim, Jeongkon;Kim, Eugene
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.55-55
    • /
    • 2019
  • 메콩강 유역에서 가장 하류에 위치하고 있는 메콩 삼각주는 상류에 일어나는 많은 활동으로 인하여 높은 수준의 취약성을 지니고 있다. 기후 변화와 미래개발의 맥락에서 재해 위험을 평가하는 것은 기후현상/극한날씨, 취약성, 노출, 현재 위험 관리 및 적응을 충분히 고려할 필요가 있다. 홍수, 가뭄, 염수침입은 IQQQM과 IS 모델을 사용하여 분석하였다. 베트남 정부가 승인한 최신 기후변화 시나리오는 이 지역의 향후 토지이용, 물이용 및 상류에서의 수력발전 계획과 함께 모델링에 사용되었다. 홍수, 가뭄 및 염수치입 정도를 시뮬레이션 결과에 기초하여 평가하였고, 최종적으로 GIS 도구를 사용한 위험도 분석을 실시하였다. 리스크 분석 결과 저위험구역의 2모작 및 3모작 논의 면적은 6,381 ha로 떨어지고 중위험지역과 고위험구역의 2모작과 양식장 면적은 각각 약 7만 ha와 9,000 ha로 늘어나는 것으로 나타났다. 가뭄과 염도에 대한 위험 분석은 기후 변화와 해수면 상승으로 인한 위험의 심각성이 증가하는 것을 나타낸다. 분석 결과 메콩 삼각주에서는 전반적으로 향후 기후변화와 상류발전에 따른 부정적 영향으로 홍수 및 가뭄재해의 위험이 증가할 것으로 나타났다. 홍수 및 가뭄에 대한 보다 능동적이고 협력적인 관리가 향후 재난에 대비하여 지역사회의 탄력성을 유지하기 위해 필요한 것으로 나타났다.

  • PDF

Development of AI-Surrogate model for climate stress test (기후 스트레스 테스트를 위한 AI-Surrogate 모형 개발)

  • Tae Hyeong Kim;Boo Sik Kang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.99-99
    • /
    • 2023
  • 기후변화는 물 관리의 가장 큰 리스크 요인이므로 물 관리 계획을 수립하는 과정에서 기후변화의 영향을 고려하는 것이 필수적이다. 기후변화에 대한 수자원 예측 관련 연구가 이루어지고 있으나, 대부분의 연구에는 수문학적 모델링이나 시뮬레이션이 동반되는데, 이 과정에는 시간과 비용이 많이 들어가며, 지역이나 연구목적에 따른 정밀한 매개변수의 보정은 전문지식이 필요하기 때문에 현업에서 연구결과를 의사결정에 활용하기에는 한계가 있다고 볼 수 있다. 이에 따라 수문학적 모델링의 입력 및 출력 결과를 딥러닝의 학습자료로 하여 수문모델을 사용하지 않아도 효율적으로 결과를 도출할 수 있는 딥러닝 기반 Surrogate 모형에 대한 연구가 이루어지고 있으나 수자원 분야에 접목된 사례는 부재한 실정이다. 따라서 이 연구를 통해 국내 유역을 대상으로 Surrogate 모형을 구축한 뒤, 그 성능을 평가하고자 한다. 이를 위한 Surrogate 모형 구축 과정은 다음과 같다. 충주댐 유역을 대상으로 과거 20년간의 강우 및 기온 자료를 수집한 뒤, 이 자료를 바탕으로 기후변화의 영향을 고려한 3,162개의 시나리오를 생성한다. 그 후 장기유출모형 IHACRES에 생성된 시나리오를 입력자료로 하여 유입량 결과를 도출하고, 이 결과를 Python코드 기반의 딥러닝 학습자료로 하여 최적 예측 결과를 도출해내는 Surrogate 모형을 생성한 뒤 기존 장기유출모형과의 성능을 비교하고자 한다. 이와 같은 Surrogate 모형은 추가적인 데이터와 매개변수의 보정 과정이 없어도 장기유출모형과 같은 결과를 짧은 시간내에 상당히 정확하게 모사할 수 있어 시간과 비용을 줄일 수 있으며, 비전문가도 쉽게 사용할 수 있다는 장점을 가진다.

  • PDF

The Continuity of Operation (COOP) Application to a Local Government for Disaster Risk Reduction

  • Jang, Young-Jin;Wang, Won-joon;Jung, Jae-Wook;Seo, Yong-Seok
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.12
    • /
    • pp.157-166
    • /
    • 2019
  • Globally, various disasters such as typhoons, floods, earthquakes, fires, explosions have caused work to be halted. If there is a large-scale disaster at public institutions in charge of major national affairs and their works are interrupted, not only will there be property damage, but there will also lead to a decline in national credibility and direct and indirect impacts on the people. Therefore, it is necessary to ensure continuity of operation by minimizing the interruption period of critical operations due to disasters. Overseas advanced countries such as the United States and Japan developed guidelines for Continuity of Operation (COOP) to prevent unexpected work disruptions caused by disasters. Recognizing the necessity of COOP in South Korea, a relevant law has been newly established in 「the Framework Act on the Management of Disasters and Safety」 to enable public institutions to establish the COOP in response to this situation. In this study, the definition, the necessity and overseas cases of COOP were investigated and described. Using the templates developed by these results, operational impact analysis, risk assessment, operational continuity strategies and operational continuity procedures were applied to "A" City Hall in Gyeonggi-do province and those results were described. The objective of this study is to substantially contribute to the introduction of COOP to local governments through their pilot application and implications of COOP.

A Schematic Estimation Model for Structure Costs of High-rise Buildings based on Vertical and Horizontal Elements (고층건물 수직·수평 요소기반 골조공사 개산견적 모델)

  • Nam, Dong-Hee;Park, Hyung-Jin;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.3-10
    • /
    • 2014
  • High-rise buildings need thorough cost management because of large size and high risk. Cost management makes a budget by establishing and analyzing detail element at planning phase, needs cost control as each design phase, then reflected to next design. This research develops a schematic estimation model based on vertical and horizontal elements at design phase for structure cost of high-rise buildings to reduce error range and use data as design management. Usability of the model is confirmed by case study. The estimation model is expected to contribute to making the cost model more effective and satisfactory to concerned in construction or budget department and manage keeping track of the cost.

중국 공기청정 현황 - 중국의 환경규제 강화와 우리 기업의 대응

  • 한국무역협회 상해지부
    • Air Cleaning Technology
    • /
    • v.28 no.1
    • /
    • pp.29-40
    • /
    • 2015
  • 중국의 급속한 산업화로 대기, 수질, 폐기물 등 환경오염문제가 심화, 고착화되면서 이를 개선하기 위해 중국 정부는 환경규제를 지속적으로 강화하고 있다. 또한 외국인 투자유치로 제조업 육성에 어느 정도 성공을 거둠에 따라 외국인 투자 유치와 제조업 경영활동에 있어 환경 이슈를 매우 중요시하고 있어 신규 및 사업확장에 제동이 걸리고 있다. 중국은 신규법인수 기준으로 우리나라의 최대 해외직접투자국이며, 제조업종에 대한 투자금액이 전체 투자금액의 88.3%를 차지하고 있다. 중국에 진출한 기업들은 중소기업이 전체 진출기업의 약 90%로 중국의 환경규제 강화는 중국에 진출한 우리 중소기업들에게 직접적인 영향을 미치고 있다. 중국 정부는 분야별 환경목표를 강화하고 오염물질배출 업체를 퇴출시키는 등 강력한 조치를 전개하고 있으며, 중앙 정부의 환경목표 강화 기조와 더불어 해당 지역민의 친환경에 대한 요구가 점차 커짐에 따라, 각 지방정부는 환경 관련 지역 목표 달성을 위해 업체 관리감독을 대폭 강화하고 있는 추세이다. 이러한 중국의 환경규제 강화는 진출 기업이나 진출을 준비하는 기업들의 설비투자비나 오염배출비용 부담 증가 등 상당한 리스크로 작용하고 있으며 향후에도 중국의 환경규제 강화 기조는 지속될 것으로 전망된다. 실제 중국에 진출한 기업들은 환경규제를 직접적으로 체감하고 있다. 규제집행의 강도가 눈에 띄게 높아져 엄격한 기준을 적용받고 처벌수위 역시 높아졌으며, 과거 관시를 통해 원만한 해결이 가능했다면 이제는 환경규제에 대해 원칙적이고 보수적인 공무원의 태도로 인해 관시로도 해결이 어려운 경우가 다반사이다. 또한, 주민들도 환경규제에 대한 인식수준이 높아짐에 따라 미미한 사안에도 즉각적인 반응을 보여 민원제기 사례가 빈번히 발생하고 환경안전 기준이 점점 높아짐에 따라 이에 대응하기 위해 환경안전 설비추가, 친환경연료 사용 등 추가적인 비용이 발생하고 있다. 이에 이미 진출한 기업들은 소재지 환경규제의 강화 전망 및 이로 인한 손실정도를 사전에 파악하고 다양한 옵션에서 대응전략을 마련해야 하며, 향후 중국 진출계획을 가지고 있는 기업들은 진출에 앞서 지역별로 차별화된 시장기회와 환경규제 강도 등 현지 실사를 통한 현장중심 리스크 분석을 실시해야 한다. 또한 이미 진출한 기업 및 진출예정 기업 모두 환경규제가 강화되고 있는 중국에서 사업을 하기 위해서는 법규와 기본원칙을 반드시 준수하고 규제가 더 강화될 것 이라는 기조를 인식할 필요가 있다.

  • PDF

Predicting Construction Project Cost using Sensitivity Analysis in Stochastic Project Scheduling Simulation (SPSS) (확률 통계적 일정 시뮬레이선 - 민감도 분석을 이용한 최종 공사비 예측)

  • Lee Dong-Eun;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.80-90
    • /
    • 2005
  • Activity durations retain probabilistic and stochastic natures due to diverse factors causing the delay or acceleration of activity completion. These natures make the final project duration to be a random variable. These factors are the major source of financial risk. Extending the Stochastic Project Scheduling Simulation system (SPSS) developed in previous research; this research presents a method to estimate how the final project duration behaves when activity durations change randomly. The final project cost is estimated by considering the fluctuation of indirect cost, which occurs due to the delay or acceleration of activity completion, along with direct cost assigned to an activity. The final project cost is estimated by considering how indirect cost behaves when activity duration change. The method quantifies the amount of contingency to cover the expected delay of project delivery. It is based on the quantitative analysis to obtain the descriptive statistics from the simulation outputs (final project durations). Existing deterministic scheduling method apply an arbitrary figures to the amount of delay contingency with uncertainty. However, the stochastic method developed in this research allows computing the amount of delay contingency with certainty and certain degree of confidence. An example project is used to illustrate the quantitative analysis method using simulation. When the statistical location and shape of probability distribution functions defining activity durations change, how the final project duration and cost behave are ascertained using automated sensitivity analysis method