• Title/Summary/Keyword: 리스크 관리계획

Search Result 85, Processing Time 0.026 seconds

The Process Development and Application of the Contingency Management by the Performance Analysis (성과분석을 통한 건설공사 예비비 관리 프로세스 및 적용)

  • Lee, Man-Hee;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.84-92
    • /
    • 2007
  • To reduce uncertainties and make rational plans, the presumption of contingency against a failure of projects and an occurrence of unpredictable risks is important with accurate estimations as the work progressing. Therefore, if the presumption of contingency reflecting uncertainties carries out at a decision making point of time, be able to prepare for risks. The purpose of this paper is to present a management process of contingency through the performance analysis of project. In the cost planning phase, this study offers a process which is predictable contingency and predicts the range of fluctuation of the cost, laking an advantage of EVM in construction phase. With reflecting the results from this procedure, this study presents a process, rationally manageable contingency.

A Study on Factor Evaluation for Risk Management of Hazardous Substance at Port (항만의 위험물 리스크 관리를 위한 요인평가에 관한 연구)

  • YOUN, Dong-ha;KIM, Sun-gu;CHOI, Young-suk
    • The Journal of shipping and logistics
    • /
    • v.34 no.4
    • /
    • pp.565-581
    • /
    • 2018
  • The purpose of this study is evaluate factor for risk management of hazardous substance at ports. The analysis was conducted by applying Fuzzy-AHP methodology, through a questionnaire for hazardous substance experts from Busan, Gwangyang, Incheon, and Ulsan, which are the major Korean ports. Three measurement areas and nine sub-factors were selected for the study. The results of this analysis showed that "human resource management" (HR) was the most important factor (0.445) in the three measurement areas. After applying the conversion weight, the sub-factors were ranked according to their priority as follows: "a secure of administrator skill" (0.158) had the first rank, "an improvement in administrator duty" (0.150) had the second, and "consolidation of safety education" (0.136) had the third rank.

Standard Work Process to Reduce a Risk of Track Exchange Work for Railroad (철도 운행선 변경작업의 리스크 저감을 위한 표준작업 프로세스 도출)

  • Yoon, Chang Geun;Park, Su Yeul;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.131-137
    • /
    • 2021
  • Since many resources are put into the work of changing the railway operation within limited time, it is important to have a specific work plan and safety management. For this reason, the work schedule is shared in advance, and parallel work is being carried out simultaneously by rail system, such as tracks, trolly wires, and signals. However, due to the nature of the transfer work, the work is carried out at night when the railway operation is finished, and many resources are put into the limited area of the operating line, so the risk of safety accidents and failure to change the operating line is recognized as high. Nevertheless, there is still not enough research done in korea regarding the operation line change construction. Therefore, this study is conducted a survey on the track exchange work of railroad for working people, and analyzed the results of the survey. Finally, a standard work process was suggested to reduce the risk of track exchange work.

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

Criteria for the Float Distribution (여유시간 분배기준에 관한 연구)

  • Lee Gul-Chan;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.509-512
    • /
    • 2003
  • The Critical Path Method(CPM) is an effective tool used for planning and scheduling. One of strong point in the CPM is what can calculate float. Float is able to prolong without having an effect on overall schedule of project, however concept and scope about ownership is not definite, because it is a by-product of project. Thus participants have had many dispute in using float because of their interests. In recent years, a few theories have evolved in an attempt to solve this problem. But the prior research did not make a reasonable distribution of float because their criteria of distribution was based on ratio for total project time. Actually, an application of float is achieved by participant's delay risk. Therefore. this paper proposes criteria for float distribution using delay risks, and the framework for the assessment of the delay risks.

  • PDF

Risk Identification and Priority Evaluation of Military Facility Relocation by Endowment and Concession Project (기부대양여 사업에 의한 군사시설 이전의 리스크 요인 도출 및 우선순위 평가)

  • Kim, Kukjoo;Ahn, Sungjin;Park, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.3-10
    • /
    • 2020
  • The endowment and concession has been put to practical use for the relocation projects of military Facilities. Yet, in terms of the project implementation, delay of a great deal of the projects is occurring due to related regulations and standards, as well as a lack of mutual understanding between project implementers and military units. This study analyzes the risk factors by identifying and prioritizing the potential risk factors at each stage of project implementation such as the issues that limit project characteristics and implementation. Among the derived risk factors, request exceeding facility standards in the licensing and design phases, opposition to troop relocation in the project approval phase, design change during construction phase in the construction and completion phases, dissenting opinions on endowed/conceded property in the property disposal phase and absence of facility standards in the MOA conclusion phase were found to be the main object of consideration in risk management. This study is expected to provide project managers with a guideline for effectively pursuing the projects, as it provides prioritization and optimization of risk management.

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

Evaluation of Tension of PSC Box Girder Bridges Using Risk Matrix (리스크 매트릭스를 활용한 PSC박스 거더교의 긴장재 평가)

  • Kim, Hyungjo;Ji, Seunggu;Kim, Hunkyom;Kim, Pilsoo;Kim, Hunkyom;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.53-60
    • /
    • 2018
  • In particular, the investigation of tendons in PSC Box Girder Bridge should be done in a systematic way. It is important to identify preventative maintenance activities that should be carried out in order to analyze the risk factors by type of representative tensions and to reduce risks in the long term. However, in the current maintenance system, various methodologies for investigating and repairing tensions have been studied, but it is difficult to investigate precisely tensions. Therefore, to apply the risk assessment for screening of tensions to the domestic PSC Box Bridge, we presented a risk matrix evaluation index that is consistent with the state assessment and maintenance system.

The study on the functions for design and development of Public institutions Disaster mitigation management and support system (공공기관 재해경감활동관리체계 구축 지원프로그램 설계 및 개발을 위한 필요기능 연구)

  • Kim, Minji;Kim, Doyeon;Lee, Miseon
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.1
    • /
    • pp.32-39
    • /
    • 2016
  • We analyze BCM, COOP and other exotic advanced cases for making supporting programs relates with Disaster mitigation management in Public area. The outcome from this study explains what are requirements for proper activating the programs and what we need. In conclusion, we could understand importances of BIA, RA, Disaster mitigation activities, Contingency plan, Training, Correspond to disaster, Management of document except for system managing functions. It will be helpful to build supporting programs by meeting most of requirements of BCM at the same time.

Developing a Program Performance Management Framework for Mixed-use Development in Urban Regeneration Projects (입체복합공간 개발사업의 프로그램 성과관리 체계 구축)

  • Lee, Kang-Wook;Hong, Hwa-Uk;Park, Hee-Dae;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.141-152
    • /
    • 2011
  • The market volume of urban regeneration projects has steadily increased, thereby mixed-use development also shows significant market growth. However, previous researches on urban regeneration mainly deduced suggestions and plans for institution improvement based on comparison between projects implemented the inside and outside of the country. Whereas, researches on project management closely related to project success were limited, particularly in performance management. Accordingly, this research aims at developing a program performance management framework for public clients so as to succeed mixed-use development projects. Through extensive literature review and expert interview, this research developed performance indices for diverse facilities, risk management framework and integrating method of program performance score. The proposed framework is able to consider total life cycle from basic planning to maintenance phase and to check real-time performance level. Moreover, risk management framework can periodically assess and control the level of inherent risks within performance indices. The results can contribute to improve existing performance management practices and be basis for a web-based system developed in future.