• Title/Summary/Keyword: 리스크분석

Search Result 707, Processing Time 0.025 seconds

Analysis on Risk Factors of Reactor Containment Building Construction using Analytic Hierarchy Process (계층 분석 방법을 이용한 원자로 격납 건물 시공의 리스크 요인 분석)

  • Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.425-431
    • /
    • 2015
  • Since the construction of Kori 1 was completed in 1978, the construction projects for nuclear power plant are increasingly expanded into domestic and foreign sites. However, some of construction sites of nuclear power plant have the problems of process delay and cost loss due to lack of ability of risk management. The construction of reactor containment building in nuclear power plant is especially dotted with many risk factors because it needs professional skills and large-scale resources due to long duration compared with different construction phase. Therefore, it needs the study that analyzes risk factors expected in construction of reactor containment building and suggests way of stable performance of projects. So, this study assesses risk factors of construction of reactor containment building. For the objectives, this study uses survey for group of minority specialists of 36 experts. The risks of 24 factors is classified by criterions of process, cost, safety, and quality and the results of assessment is analyzed by analytic hierarchy process. As the results, the importance and priority of risk factors classified by each criterion were calculated and the applicability of analytic hierarchy process was identified to analyze risk factors of nuclear power plant construction. These will be baseline data for risk management in construction phase of reactor containment building.

An Empirical Investigation on the Effect of Logistics Security in Import and Export Risk Management (물류보안이 수출입 리스크관리에 미치는 영향에 관한 실증연구)

  • Yi, Hong-Won;Kim, Jae-Bong
    • Journal of Navigation and Port Research
    • /
    • v.38 no.3
    • /
    • pp.317-325
    • /
    • 2014
  • The government of South Korea has introduced various security measures in the supply chain, such as CSI (including a 24-hour rule) and AEO (Authorized Economic Operator), in compliance with global security trends and the war on terror. However, many participants in the import and export process are still unfamiliar with the purposes and functions of CSI, the 24-hour rule, and AEO. As such, considering these risks as obstacles or as factors that interfere with the import and export process, this study suggests proper management schemes, which can identify, measure and evaluate these risks.

A Study on the Importance of Risk Factors for Effective Risk Management in the Pre-Project Planning Phase of the Development Projects (국내개발사업 사전기획단계에서의 효율적 리스크 관리를 위한 리스크 인자 중요도에 관한 연구)

  • Shin Kyu-Ho;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.75-86
    • /
    • 2002
  • The construction market is diversely changing because social environmental factors are rapidly transforming. Therefore, Construction projects are becoming complex and diverse. Furthermore, the risk being inherent in construction projects are increasing, and now people are considering about the risk management of construction projects in successfully handling the risk factor. The purpose of this study is first to comprehend the preparation of basic references for objective and systematic identification, categorization, and analysis of risk. Secondly it is to find the principle elements within the risk factors identified and categorized around planning process. Finally it is to manage objectively on the planning process, which forms a lot of uncertainty, in order to accentuate the importance about the risk of pre-planning process stage

An Analysis of Time Varying Beta Risk in Domestic Renewable Energy Company (국내 신재생에너지 기업의 리스크 분석)

  • Lee, UiJae;Heo, Eunnyeong
    • Environmental and Resource Economics Review
    • /
    • v.22 no.1
    • /
    • pp.99-125
    • /
    • 2013
  • Renewable energy industry not only has a promising future but also has more risk than conventional energy industry because of its characteristics. Therefore, in this study, an analysis of domestic renewable energy company risk has been performed. The risk of domestic wind and photovoltaic energy companies has been analyzed by using time varying beta model. The model has been constructed based on risk factors like firm size, firm diversification index, domestic installation, and so on. The principal result of analysis can be summarized as follows. First, risk factors affect domestic renewable energy companies have been discovered. Variables like firm size, growth rate of debt ratio, firm diversification index are statistically significant. I found that large firms are less riskier than small firms. It is also confirmed that companies with high diversification index and high debt ratio have high risk. Second, I got the result that policy factors like domestic renewable energy installation and government R&D expenditure could decrease risk of domestic renewable energy company. Third, relative sensitivity of each risk factor have been discovered. The effect of each variable gets bigger in this order: growth rate of domestic installation, firm size or diversification index, growth rate of debt ratio, growth rate of government R&D expenditure.

Risk Analysis of Alcohol Consumption During Underwater Activity Using the Risk Assessment and Analysis Method (리스크 평가 및 분석 기법을 활용한 알코올 섭취에 따른 수중활동 시 리스크 분석)

  • SEO, Sang-Woo;KANG, Shin-Beum;KANG, Sin-Young
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.2
    • /
    • pp.159-168
    • /
    • 2019
  • This study was designed to investigate the physiological response of humans to alcohol during underwater activity and to complete related risk analysis. After comparing human responses to alcohol during underwater activity, we analyzed physiological changes and risk level using a new risk analysis method developed in this study, 'Risk Assessment and Analysis (RAA)'. RAA is a modified method based on an internal control frame work. It has 3 steps, the first of which is to analyze risk correlation. The second step is to quantify risk and build a risk database. The last step is to analyze the diagramed risk map. Using RAA, the risk levels of alcohol use underwater were calculated and diagramed. The diagramed risk map was then used to analyze the difference between risk levels underwater before and after alcohol use. As a result, it was found that risk level underwater increased after alcohol use. This study shows alcohol use increases the ratio of high risk groups during underwater activity. It also indicates that risk levels can be quantified according to the likelihood and impairment scale, which can potentially help in identifying high risk groups for intensive management underwater.

Analysis of the Schedule Risk using PROMETHEE in Building Construction Management (건설관리에서의 PROMETHEE기반 공정 리스크 분석)

  • Lee, Jang-Young;Yoon, You-Sang;Jang, Myung-Houn;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.25-34
    • /
    • 2010
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopts the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to provide process of risk analysis to use the PROMETHEE.

Development of System Model for Risk Management (건설공사 리스크관리를 위한 모형 개발 연구)

  • Park Seo-Young;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.418-421
    • /
    • 2003
  • Most construction companies recognize the necessity of risk management. The practical application, however, is not easy because of the absence of systematic procedure for risk management and the difficulty in objectification of subjective risk factors. This study suggests a systematic procedure and a models. In the first place for those researches, this study analyzes the present condition of risk management in the construction industry. The developed model can be used as a risk management tool that enables evaluation of construction risk factors by quantified method, and it provides project managers with the methods to prevent risk and to deal with potential risk factors in the planning and construction phases. The results of this study could be used as references for related researches because this study attempts to develop a systematic tool for risk management including risk identification, risk analysis. risk action phases.

  • PDF

A Study on Risk Classification System in Supply Chain (공급사슬망에서의 리스크 분류체계 연구)

  • Kim, Eun-Soo;Song, Byung-Jun;Lee, Jong-Yun
    • The KIPS Transactions:PartD
    • /
    • v.19D no.3
    • /
    • pp.257-262
    • /
    • 2012
  • The aim of this study is to present the importance of Risk Management and Risk Classification System in Supply Chain to cope with the rapidly changing distribution environment flexibly through the cooperation between a shipper and a distribution company. First of all, we considered existing studies related to the risks of Supply Chain Risk and analyzed 47 different risk factors by 18 kinds of risk causing factors. Second, we collected opinions of corporation specialist group based on the analyzed risk factors and then classified the risk factors into three categories and ten sub-categories. Third, we conducted a survey targeting shipping companies and distribution companies about classified risk and then verified the validity of Supply Chain Risk Classification using verification techniques such as Confirmatory Factor Analysis, Concentration Validity and Distinction Validity. Finally, we suggest some implications based on the verification results.