• Title/Summary/Keyword: 리스크분석

Search Result 707, Processing Time 0.045 seconds

Influence of Corporation-CEO Reputation Gap on Purchase Intention, Growth Prospect, Investment Attraction, and Corporate Preference (기업-CEO평판 격차가 개인의 구매의사, 성장 및 투자 전망, 기업선호에 미치는 영향)

  • KIM, Dae-young;Byeon, Sang-ho
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.11 no.3
    • /
    • pp.131-143
    • /
    • 2016
  • This study investigated how corporation-CEO reputation gap, corporation-related knowledge, CEO-related knowledge, and corporate involvement influence respectively individuals' purchase intention, growth prospect, investment attraction, and corporate preference. Corporation-CEO reputation gap was divided into two groups, CEO reputation risk vs. CEO reputation premium. The survey(N = 451) with a nationwide stratified sampling found the following. First, corporate involvement and corporation-related knowledge have a positive(+) effect on purchase intention, growth prospect, investment attraction, and corporate preference. But CEO-related knowledge and corporation-CEO reputation gap have a negative(-) effect on them. Second, in CEO reputation risk group, CEO-related knowledge has a negative(-) effect on them.

  • PDF

A Study on the Corporate Portfolio Risk Management for Multinational Construction Company (대형건설업체의 해외건설공사 포트폴리오 리스크 관리에 관한 연구)

  • Han Seung-Heon;Lee Young;Kim Hyung-Jin;Ock Jong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.68-80
    • /
    • 2001
  • While opportunities for international construction firms have been growing with globalization, the risk of international construction projects is significantly increasing in severity and complexity. However, the traditional risk management approach in the construction industry has maintained a profit focus. In addition, this approach has not considered the overall risk at the corporate level, but rather has focused only on the risk of individuals at the project level. Corporate risk management should be implemented from the initial stages of new project selection. This paper suggests the Multi-criteria Integrated Systematic Analysis as a strategic decision-making tool for international construction contractors. The model integrates the multi-criteria of risk, return, and efficiency to choose the optimal set of new portfolios at the corporate level. This model also introduces the Value at Risk (VaR) concept to the international construction industry to present the total risk at the corporate level. To validate this model, this paper tested an experimental case study using the historical data of a global general contractor.

  • PDF

Development of SVM-based Construction Project Document Classification Model to Derive Construction Risk (건설 리스크 도출을 위한 SVM 기반의 건설프로젝트 문서 분류 모델 개발)

  • Kang, Donguk;Cho, Mingeon;Cha, Gichun;Park, Seunghee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.841-849
    • /
    • 2023
  • Construction projects have risks due to various factors such as construction delays and construction accidents. Based on these construction risks, the method of calculating the construction period of the construction project is mainly made by subjective judgment that relies on supervisor experience. In addition, unreasonable shortening construction to meet construction project schedules delayed by construction delays and construction disasters causes negative consequences such as poor construction, and economic losses are caused by the absence of infrastructure due to delayed schedules. Data-based scientific approaches and statistical analysis are needed to solve the risks of such construction projects. Data collected in actual construction projects is stored in unstructured text, so to apply data-based risks, data pre-processing involves a lot of manpower and cost, so basic data through a data classification model using text mining is required. Therefore, in this study, a document-based data generation classification model for risk management was developed through a data classification model based on SVM (Support Vector Machine) by collecting construction project documents and utilizing text mining. Through quantitative analysis through future research results, it is expected that risk management will be possible by being used as efficient and objective basic data for construction project process management.

Identification and Effect Analysis of Risk Factors for Build Transfer Lease Projects (BTL민간투자사업의 리스크 식별 및 영향도 분석에 관한 연구)

  • Jung, Jung-Man;Park, Young-Min;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.47-56
    • /
    • 2007
  • The Build-Transfer-Lease(BTL) system is a new way of attracting private capital to social infrastructure construction projects. Private companies will get back their investment by leasing facilities to the government. In January 2005, government introduces a 'Korean New Deal Policy' to initiate BTL system in the field of social infrastructure development such as education, public welfare, housing, culture etc. As BTL being still in premature phase, thus it is lack of knowledge in BTL and there is no such studies about problems and impacts of BTL projects. However, there could be so many problems underlying within BTL projects. Therefore, the purpose of this paper is to identify various risk factors during implementation of BTL projects. For this purpose, five BTL undertaking projects were studied. Field survey was conducted based-on interview instruments. Prevailing risk factors in operating the BTL Project were collected from the both officials of project promoters and concessionaires. In addition, a distinct need has emerged for analysis of risk factors for BTL projects. Based on real cases, this study resulted in risk factors influencing every phases and grouped risk factors into each phase. Moreover, this study also perform sensitivity analysis in order to know how risk factors affect to BTL projects. From analyzing the data, the study addresses that both major BTL project participants 'the competent authority' and 'Special purpose company(SPC)' have many problems and difficulties to operate the projects.

An Empirical Study on the Profit Margin Adequacy of Korean General Insurance (국내 일반보험 예정이익률 적정성에 관한 실증연구)

  • Park, Geunyong;Kim, So-Yeun
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.6
    • /
    • pp.588-597
    • /
    • 2021
  • In Korea, the standard for calculating the profit of a general insurance, which constitutes the loading in the premium, is not specified, and most of the non-life insurance companies reflect 2~5% of the premium as profit margin. Although the transparency of pricing is required due to the nature of insurance products, there are insufficient standards and empirical studies on the determination of insurance price factors in the domestic insurance industry. In this study, we propose a method of calculating the expected profit margin of general insurance. A way for calculating the expected profit margin of the general insurance is to reflect the shareholder demand on the capital that the insurance company should secure against the risk of loss due to the profit/loss volatility, as a ratio to the insurance premium. Shareholders should be compensated for the risks associated with their insurance operations, and the opportunity cost of these shareholders is to be reflected in premiums. In this study, we calculate the amount of capital that the company should accumulate to prepare insurance risk for each product, and insurance risk is defined as the volatility of insurance operating profit/loss. And insurance risk is calculated using stochastic simulation based on Dynamic Financial Analysis (DFA) methodology. Finally, we calculate the expected profit margins for 25 products and analyzed the difference between those and the profit ratio of domestic general insurance.

Hazard Identification and Risk Assessment for the Use of Passenger Portable Electronic Devices (승객 휴대 전자기기 사용에 대한 위해요인 식별 및 리스크 평가)

  • Lim, In-Kyu;Kim, Mu-Geun;Kang, Ja-Young
    • Journal of Advanced Navigation Technology
    • /
    • v.22 no.4
    • /
    • pp.288-294
    • /
    • 2018
  • The entertainment system of the aircraft has changed its paradigm in the form of using passenger electronic devices instead of using a fixed monitor. This has simplified the on-board equipment while the risk of safety has increased with the electric charging of portable electronic devices. Unlike personal portable electronic devices that do not have a transmission function, the use of Wi-Fi enabled electronic devices(T-PED) is allowed and the battery is required to be charged in the cabin. In this study, we used the NASA Aviation Safety Reporting System to investigate the effects of changes in wireless environment and entertainment service. Based on this, we analyzed the risks of personal electronic devices by sharing event occurrence cases caused by in-flight electronic equipment or passenger portable electronic devices(especially smart phones) from the viewpoint of aircraft safety management. This analysis includes identification of potential hazards and risk assessment, and finally the strategies for risk mitigation for safe use of portable electronic devices are suggested.

Suggestion of a Check List to Prevent Fall Incidents Through Case Analysis of Electric Shutters in Buildings (건축물 전동셔터 사례 분석을 통한 추락방지 체크리스트 제안)

  • Jung, Young-Min;Bang, Hong-Soon;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.3
    • /
    • pp.259-268
    • /
    • 2022
  • Electric shutters for buildings are being developed in Korea and abroad on a regular basis and can be used in different types of buildings such as company buildings and fire stations, etc. However, the fall risk factors induced by a variety of functions of building electric shutters require safety control. We reviewed the technological trends and legal standards in Korea and abroad, analyzed incident cases, and identified fall risk factors requiring control. We inspected all the building electric shutters in Korea based on the fall risk factors. As a result, we identified 91 noncompliance cases, in 69 percent of all 132 locations. In this study, backed by the inspection results, we suggest a check list to prevent the fall of building electric shutters to ensure safety and conduct verification using a focus group interview.

Risk Based Software Development Strategy (리스크 기반 소프트웨어 개발 전략)

  • KWON, W.;Bae, C.K.;Kim, Y.B.;Hwang, S.A.;Kwak, E.Y.;Kwon, H.Y.
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2010.04a
    • /
    • pp.1020-1023
    • /
    • 2010
  • 소프트웨어 개발은 복잡도가 높고 가시성 확보가 어려워 전략적으로 접근해야 한다. 일반 개발 프로젝트에서 개발 전략은 특정 개발 모델과 프로젝트 관리 기법을 사용하겠다는 것이 주류를 이루고 있다. 이러한 방법은 각 개발 단계에서 업무를 진행하는 프로젝트 참여자가 프로젝트 전체를 보지 못하고 각자의 전문 분야만을 국지적으로 개발하여 초기에 의도된 대로 개발되지 않는 결과를 초래하는 경우가 다반사여서 개발 전략으로서의 역할을 적절히 수행하지 못하는 문제가 있다. 본 연구에서는 리스크 기반의 개발 전략을 제시한다. 개발 프로젝트 전체는 물론 개발의 각 단계 별로 전략이 존재할 수 있으며, 전사 차원과 프로젝트 차원의 전략이 존재한다. 분석한 리스크 레벨에 차등적으로 개발 리소스를 할당하고, 개발 기법을 사용하고, 리뷰 및 검증 활동을 진행하여 제한된 개발 리소스를 합리적이고 적절하게 사용하여 개발하고, 개발 과정을 모니터링 및 제어하는 접근법이다. 이미 개발의 일부인 테스팅 분야에서는 리스크 기반 테스팅 전략이라는 이름으로 활용하여 직간접적인 효과를 보고 있으며, 같은 개념을 개발 전체로 확장하여 개발 전략으로 체계화하여 제시한다.

An Analysis on the Importance of the Risk Factors Considering the Reasons for the Increase of the Subcontract Construction Project Bid Cost (건설프로젝트 하도급 입찰금액 상승요인을 고려한 리스크인자의 중요도에 관한 분석)

  • Lee, Sung-Goo;Shin, Hyun-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.1 s.23
    • /
    • pp.63-70
    • /
    • 2007
  • The aims of this study are to draw the project risk factors by grasping the relation especially between the construction preparation cost calculation and the project risk factors in the project's bidding stage, and to draw the cost estimate based on the risk when the orderer or the constructer performs the project and the main factors in calculating the most suitable construction cost by clarifying the understanding degree of the influence between the risk factors and the construction cost. In addition, this study can give a help to the proper decision -making through the prediction of the construction preparation cost, and this study is expected to give the basic data in developing the assessment tool for the most suitable construction cost of the project.

Risk-Informed Allowed Time Extension for Transmission Line Isolation (리스크정보활용 원전 송전선로 휴전작업 허용시간 연장)

  • Chi, Moon-Goo;Jeon, Ho-Jun;Lim, Hyuk-Soon
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.152-153
    • /
    • 2011
  • 원자력발전소(원전) 터빈발전기에서 생산된 전력은 송전망과 발전소 운전에 필요한 기기 작동을 위해 소내로 공급되도록 설계되어 있다. 최근 신규원전의 전원 공급을 위해 가동중 원전의 송전선로 휴전 작업시 운영기술지침서의 운전제한시간을 초과한 휴전작업에 대한 안전성 문제가 대두되었다. 본 논문에서는 정상운전중인 원전의 송전선로 1개 휴전 작업중 운전중인 송전선로 상실시 리스크를 분석하여 허용기준 만족 여부를 평가하고, 리스크관리 대책을 수립하여 전력계통의 신뢰성 및 안전성 향상에 기여하고자 한다.

  • PDF