• Title/Summary/Keyword: 디자인 빌드(Design Build)

Search Result 8, Processing Time 0.023 seconds

The Process Model for Project Management of Design-Build System and Constitution of Database (설계시공일괄 방식의 건축 프로젝트 관리를 위한 프로세스 모델 및 데이터베이스 구축)

  • Chun Jae-youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.109-116
    • /
    • 2005
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alternative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather din single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial t31ow-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigate throughly the function and information flows all over the design-build project. This research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to improve the consistency of functional process and minimize incoherent activities of the design-build projects.

A Process Model for Project Management of Design-Build System and Method for Constitution of Database (건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안)

  • Kim Eui-Suk;Kim Chang-Gyo;Lee Kyung-Kook;Park Sang-Jun;Son Bo-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.242-245
    • /
    • 2004
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alterative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to Improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.

  • PDF

The Deduction of the Success Factor in Construction Projects by Design Build Methods (디자인 빌드(Design Build) 방식 건설 프로젝트의 성공요인 분석에 관한 연구 - 중.소규모 건설 프로젝트를 중심으로)

  • Lee, Chi-Joo;Kim, Sang-Ki;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.182-190
    • /
    • 2007
  • The minor construction companies in Korea have grown in focusing on the construction operation field. Also, soft field is vulnerable area, and there are not enough delivery systems, therefore, a capacity of the construction industry expansion and productivity is insufficient. Furthermore, the minor construction companies are losing their areas, because the major construction companies having numerous know-how and ample funds are competitive. As the construction industry are more larger and complicated, the design build methods might be increased in the construction industry and the minor construction companies could have more competitive. Hence, this paper analyzes the success factor in minor construction projects by design build methods focusing on instance $company^{\circ}{\phi}s$ case and survey, and critical success factor deduction and importance degree analysis of this factor using AHP analysis. In addition, this paper gives fundamental data how to manage the construction project effectively for minor construction $companies^{\circ}{\phi}s$ expansion in near future.

A Study on the Improvement of Architectural Design Contract Phase in the Overseas Construction Market through the Analysis of Inefficient Factors (효율성 저해요인 분석을 통한 건축설계분야의 해외건설 계약단계 개선방안에 관한 연구)

  • Lim, Jae-Bok;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.155-162
    • /
    • 2010
  • Following the successful entry of Korean builders into overseas construction markets, Korean architects have also become active abroad, and have expanded their market share centered on the Southeast Asia and Middle Eastern areas through Design-Build contracts. However, there have also been However, conflict can arise among the project applicants in the contract stage due to the special characteristics of overseas construction. This sometimes leads to the failure of a project. Using statistics and case studies, this study identified problems in the overseas construction market. It analyzed inefficient factors of the architectural design contract phase in the overseas through a survey and an interview of specialists. Based on the results, this study suggested a master architect system, and some resolutions to the problems of organizing an internal evaluation system. It is expected that the results can be used as practical data for companies that want to advance into the overseas market.

A Study on the Improved Post-Analysis Development System in the Naval Combat System

  • Seo, Chang-Won
    • Journal of the Korea Society of Computer and Information
    • /
    • v.27 no.12
    • /
    • pp.197-207
    • /
    • 2022
  • The Naval Combat System operates in multiple software components for efficient functional processing. Data transmission and reception between components is performed in real time using DDS(Data Distribution Service). Reliable Post-Analysis requires the collection of all DDS messages. However, Software workload and development costs increase because common functions for all messages must be developed directly. In the paper, We propose an improved Post-Analysis based on the Feature Model and a new development system using it. Functions for the modified message were applied as variable domains of the Feature Model. When Build Center updates Post-Analysis, it automatically processes all software tasks associated with Post-Analysis. The proposed development system simplified the overall work procedure, and work time was significantly reduced compared to the existing development system.

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

Independent I/O Relay Class Design Using Modbus Protocol for Embedded Systems

  • Kim, Ki-Su;Lee, Jong-Chan
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.6
    • /
    • pp.1-8
    • /
    • 2020
  • Communication between system modules is applied using the Modbus protocol in industrial sites including smart factories, industrial drones, building energy management systems, PLCs, ships, trains, and airplanes. The existing Modbus was used for serial communication, but the recent Modbus protocol is used for TCP/IP communication.The Modbus protocol supports RTU, TCP and ASCII, and implements and uses protocols in embedded systems. However, the transmission I/O devices for RTU, TCP, and ASCII-based protocols may differ. For example, RTU and ASCII communications transmit on a serial-based communication protocol, but in some cases, Ethernet TCP/IP transmission is required. In particular, since the C language (object-oriented) is used in embedded systems, the complexity of source code related to I/O registers increases. In this study, we designed software that can logically separate I/O functions from embedded devices, and designed the execution logic of each instance requiring I/O processing through a delegate class instance with Modbus RTU, TCP, and ASCII protocol generation. We designed and experimented with software that can separate communication I/O processing and logical execution logic for each instance.